In: Civil Engineering
In: Civil Engineering
when designing a rigid channel carrying low sediment water, what 2 requirements do you need to meet and what are you trying to avoid in these requirement
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
Under what circumstances might an owner decide to use wrap-up (owner controlled insurance program) insurance. What type of projects are suited for wrap-up insurance?
In: Civil Engineering
Which ASTM cement(Type 1-Type 5) is most appropriate for the following construction applications? What types of mineral and/or chemical admixtures could be used for each application? Give detailed reasons for your choices.
In: Civil Engineering
What causes thermal cracking of concrete in early day of concreting? Name 4 methods that can be used to control it and give reasons in details.
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
A cubical tank has sides of 4.5m which contains three immiscible liquids at same depths. A water upto a height of 1.5m above the base, An immiscible liquid of specific gravity 0.9 is filled in between both liquids (mid-portion) upto 1.5m height, the upper remaining part is filled with oil of specific gravity 0.79. Calculate (i) The value of pressures at the top, at the interface points and at bottom on one side of the tank (ii) The position of center of pressure for one side of the tank. (iii) What suggestions would you give to your client on the basis of obtained results? (iv) Pressure distribution Diagram
In: Civil Engineering
According to Turkish Standards; How to calculate
Shrinkage and Shrinkage of Concrete? (Can be viewed from
TS500)
Please explain by solving one numerical sample.
In: Civil Engineering
(a) What are the various classifications of mortar? (b) In accordance with ‘kind of binding material’, mortars are classified into five basic categories. List and explain
In: Civil Engineering
Setting up the field office includes all except
Select one:
a. Preparing construction administration files, forms, and documentation
b. Establishing utilities for the field office
c. Establishing utilities for the field office
d. Sighting the location for the temporary trailer office
e. Clearing and Grabbing
In: Civil Engineering