2) A circular sewer is to carry a flow rate of
0.07m3
/s when flowing full. The sewer is
to be laid on a slope of 0.006. With n = 0.013, calculate the pipe
size and velocity
of flow. Compare the nomogram and theoretical values.
In: Civil Engineering
Risk management is a key part of project management. List five key features of a road infrastructure risk management plan. Name three significant risks usually involved in a road project and briefly describe them. (Target length to answer this question is approximately 300 words)
In: Civil Engineering
List four major components of asphalt and describe their contributions to the overall performance of a road pavement.
In: Civil Engineering
what is the junction low (i need traffic flow not current),
plees i also need a reference
. thank you
In: Civil Engineering
Distinguish between hot mix asphalt patching and crack seal used for the maintenance treatment for flexible pavements.
In: Civil Engineering
a) The soil from a borrow pit is at a total density of 1.8 t/m3
and a water content of 12%. It is desired to construct a road
subgrade with a compacted total density of 2 t/m3 at a water
content of 17%. Determine the quantity of soil (dry mass in tonnes)
to be excavated from the barrow pit and the amount of water (in
litres) to be added for every 1 m3 of compacted soil in the
embankment. (Assume the specific gravity of soil is 2.65).
b) Explain the relative benefits of using stone mastic asphalt and
open graded asphalt in pavement.
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
when designing a rigid channel carrying low sediment water, what 2 requirements do you need to meet and what are you trying to avoid in these requirement
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
Under what circumstances might an owner decide to use wrap-up (owner controlled insurance program) insurance. What type of projects are suited for wrap-up insurance?
In: Civil Engineering
Which ASTM cement(Type 1-Type 5) is most appropriate for the following construction applications? What types of mineral and/or chemical admixtures could be used for each application? Give detailed reasons for your choices.
In: Civil Engineering
What causes thermal cracking of concrete in early day of concreting? Name 4 methods that can be used to control it and give reasons in details.
In: Civil Engineering
In: Civil Engineering