Five samples of size 4 were taken from a process. Summary statistics are shown below:

Sample Range Mean

1 1.75 10.5

2 2.42 22.3

3 2.75 17.4

4 2.04 20.1

5 2.80 18.9

What is the lower control limit for a range chart?

Solutions

Expert Solution

Solution:
We need to calculate Lower control limit for a range Chart which can be calculated as
LCL range chart = D3*Rbar
Here Subgroup size = 4
No. of sample n = 5
Rbar can be calculated as
Rbar = (Range)/n = (1.75+2.42+2.75+2.04+2.80)/5 = 11.76/5 = 2.352

From D3, D4 and A2 table we found at Subgroup size = 4, D3 = 0
So Lower control limit for range chart = 0*2.352 = 0


Related Solutions

Five samples of size 4 were taken from a process. A range chart was developed that...
Five samples of size 4 were taken from a process. A range chart was developed that had LCLr = 0 and UCLr = 2.50. Similarly, an average chart was developed with the average range from the five samples, with LCLx = 15.0 and UCLX = 24.0. The ranges for each of the five samples were 1.75, 2.42, 2.75, 2.04, and 2.80, respectively. The values of the sample average for each sample were 19.5, 22.3, 17.4, 20.1, and 18.9, respectively. What...
A ______________ is the distribution of sample statistics computed for samples of the same size from...
A ______________ is the distribution of sample statistics computed for samples of the same size from the same population. Sampling Distribution Skewed Distribution Population Distribution Null Distribution t-Distribution Researchers are testing a new mosquito repellent and comparing it to a brand that’s already on the market.  These researchers collect data on 100 people who used the new repellent and 100 people who used the other brand.  They find that 32 out of 100 people using the new repellent were unaffected by mosquitos,...
Twelve samples, each containing five parts, were taken from a process that produces steel rods. The...
Twelve samples, each containing five parts, were taken from a process that produces steel rods. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) 1 10.002 0.011 2 10.002 0.014 3 9.991 0.007 4 10.006 0.022 5 9.997 0.013 6 9.999 0.012 7 10.001 0.008 8 10.005 0.013 9 9.995 0.004 10 10.001 0.011 11 10.001 0.014 12 10.006...
Nine samples were taken from 2 streams, four from one and five from the other and...
Nine samples were taken from 2 streams, four from one and five from the other and the following data were obtained. Pollution lever in stream 1: ppm Pollution level in stream 2: ppm 16 9 12 10 14 8 11 6 Someone claimed that the data proved that stream 2 is less polluted than stream 1. Someone else asked the following questions: When were the data collected? Were the data collected all in one day or on different days? Were...
1. Five samples of table legs produced in an automated cutting process were taken each hour...
1. Five samples of table legs produced in an automated cutting process were taken each hour for 20 hours. The length of a table leg in centimeters was measured, and yielded averages and ranges show in the below table. Assume the sample size (n) is 5. Sample Avg Length () Range (R) 1 95.72 1.0 2 95.24 0.9 3 95.18 0.8 4 95.44 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10...
Question 1. Samples of n = 4 items are taken from a process at regular intervals....
Question 1. Samples of n = 4 items are taken from a process at regular intervals. A normally distributed quality characteristic is measured and x-bar and s values are calculated at each sample. After 50 subgroups have been analyzed, we have ? x?i = 1,000 and ? si = 72 (A) Compute the control limit for the x and s control charts (B)Assume that all points on both charts plot within the control limits. What are the natural tolerance limits...
Provided below are summary statistics for independent simple random samples from two populations. Use the pooled​...
Provided below are summary statistics for independent simple random samples from two populations. Use the pooled​ t-test and the pooled​ t-interval procedure to conduct the required hypothesis test and obtain the specified confidence interval. x1=12, s1=2.4, n1=19​, x2=13, s2=2.2​, n2=19 a.​ Two-tailed test, a=0.01 b. 99% confidence interval Part 1) First, what are the correct hypotheses for a​ two-tailed test? Part 2) ​Next, compute the test statistic. Part 3) Determine the​ P-value. Part 4) What is the conclusion of the...
Provided below are summary statistics for independent simple random samples from two populations. Use the pooled​...
Provided below are summary statistics for independent simple random samples from two populations. Use the pooled​ t-test and the pooled​ t-interval procedure to conduct the required hypothesis test and obtain the specified confidence interval. x1=15​, s1=2.3​, n1=15​, x2=16​, s2=2.2​, n2=15 a.​ First, what are the correct hypotheses for a​ two-tailed test? compute the test statistic. Now determine the critical values. What is the conclusion of the hypothesis​ test? Since the test statistic ____ in the rejection​ region, ____ H0 b....
Provided below are summary statistics for independent simple random samples from two populations. Use the pooled​...
Provided below are summary statistics for independent simple random samples from two populations. Use the pooled​ t-test and the pooled​ t-interval procedure to conduct the required hypothesis test and obtain the specified confidence interval. x1= 18, s1= 4, n1= 21, x2= 21, s2= 5, n2=13 a. What are the correct hypotheses for a​ left-tailed test? b. Compute the test statistic . c. Determine the​ P-value. d. The 90% confidence interval is from _____ to _______ ?
Two random samples were drawn from members of the U.S. Congress. One sample was taken from...
Two random samples were drawn from members of the U.S. Congress. One sample was taken from members who are Democrats and the other from members who are Republicans. For each sample, the number of dollars spent on federal projects in each congressperson's home district was recorded. Dollars Spent on Federal Projects in Home Districts Party Less than 5 Billion 5 to 10 Billion More than 10 billion Row Total Democratic 6 16 23 45 Republican 11 17 19 47 Column...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT