Question

In: Electrical Engineering

Estimate the generating cost per unit supplied from a power plant having data: Output per year...

Estimate the generating cost per unit supplied from a power plant having data:
Output per year = 4 × 108 kWh, Load factor = 50%, Annual fixed charges = Rs. 40 per kW,
Annual running charges = 4 paisa per kWh

Solutions

Expert Solution

Given :

There are 4 generating units in the plants having 108 kW capacity.

Therefore, total capacity of the plant = 4 * 108 kW = 432 kW

Load factor for the plant = 50 % = 0.5

Since, load factor = Average power / Peak power

Therefore, average power supplied by the plant = Load factor * total capacity of the plant = 0.5 * 432 kW = 216 kW

Therefore, energy supplied by the plant in kWh = average power supplied by the plant * Number of hours in an year

Since, Number of hours in an year = 365*24+6 = 8766

Therefore, energy supplied by the plant in kWh = 216 * 8766 = 1893456 kWh

Now, since annual fixed charges = Rs. 40 per kW

Therefore, total annual fixed charges = Rs. 40 * total capacity of the plant in kW = Rs. 40 * 432 = Rs. 17280

Therefore, annual fixed charges per kWh = annual fixed charges / energy supplied by the plant in kWh

= 17280 / 1893456 (Rs. / kWh) = 0.00912616929 (Rs. / kWh) = 0.912616929 (paisa/ kWh) (1 Rs. = 100 paisa)

= 0.912616929 paisa per kWh   

Since, Annual running charges per kWh = 4 paisa per kWh

and generating cost per kWh = Annual fixed charges per kWh + Annual running charges per kWh

= 0.912616929 paisa per kWh + 4 paisa per kWh = 4.912616929 paisa per kWh

Since, 1 unit = 1 kWh

Therefore, generating cost per unit = 4.912616929 paisa ==> ANSWER

Hope the answer helps :)


Related Solutions

Power is generated at 24 kV at a generating plant located 55km from a town that...
Power is generated at 24 kV at a generating plant located 55km from a town that requires 60MW of power at 12 kV. Two transmission lines from the plant to the town each have a resistance of 0.11?/km . What should the output voltage of the transformer at the generating plant be for an overall transmission efficiency of 97.8%, assuming a perfect transformer?
Consider the case of a power plant that, in the process of generating electricity, it also...
Consider the case of a power plant that, in the process of generating electricity, it also emits noxious pollutants. It has been argued that this situation represents a market failure. a. Briefly explain, using a graph, what are the economic foundations of this argument? b. Using the graph in (a) show what are the economic implications of this case c. What economic mechanism would you suggest to correct for this market failure? d. In general, why market forces, do not...
A coal-fired power plant produces power  with costs . Each unit of power earns the plant ....
A coal-fired power plant produces power  with costs . Each unit of power earns the plant . Burning coal releases particulate matter (PM2.5), a pollutant that is known to cause heart disease, lung disease, and birth defects. The coal plant borders a wildlife sanctuary which sells tourism visits  for a price $30. However, the sanctuary's animals are getting sick due to the negative externality of PM2.5, such that the costs to the sanctuary are . The local government decides to tax the...
Bob makes widgets. Variable costs per unit are $2. Fixed cost per unit (at an output...
Bob makes widgets. Variable costs per unit are $2. Fixed cost per unit (at an output level of 100) are $1 per unit. The normal sales price per unit is $5. A customer approaches Bob offering to buy 40 widgets for $4 each. Assume Bob has excess capacity. 1) What is the effect on operating income if he accepts the order? Additional revenue – additional cost = effect on oper. income. Fixed costs won’t change so additional costs = VC...
A neighborhood fuel cell power plant is to be designed for an electric power output of...
A neighborhood fuel cell power plant is to be designed for an electric power output of 2000 kW with liquid– water product. Estimate the flow rates of hydrogen and oxygen during peak power production, assuming an 80% efficient power conditioner is used to convert DC to AC power and the fuel cell efficiency is 55%. What is the plant heat rate?
The following system is a small power generating plant which contains a boiler, a superheater, a...
The following system is a small power generating plant which contains a boiler, a superheater, a turbine and a condenser. Describe each part of the system with reference to the equations required in terms of heat transfer and work transfer. The feed water flows at 1 tonne/hr at 50°C. The output pressure is 6 bar with a dryness fraction is 0.9 and the efficiency of the boiler is 75%. The calorific value of the fuel is 38MJ/kg. Determine the fuel...
A nuclear power plant has an overall efficiency of 31% and a power output of 800MW....
A nuclear power plant has an overall efficiency of 31% and a power output of 800MW. For one year operating at full capacity, calculate a) the number of joules produced; b) the number of fission events that were required to produce those joules; c) the mass of uranium oxide (UO2) that has been used in fission; and d) the market cost of that uranium oxide if it was all high quality.
Monthly Budget Data Selling price per Unit $79 per unit Raw Materials Cost $27 per unit...
Monthly Budget Data Selling price per Unit $79 per unit Raw Materials Cost $27 per unit Packaging Costs $15 per unit Electricity $4 per unit Waste and Other Costs $6 per unit Salary and Wages Costs $560,000 per month Fringe Benefits 50% of salaries Rent Costs $750,000 per month Insurance Costs $50,000 per month Depreciation Costs $370,000 per month Actual Data January February Production (Units) 245000 187000 Revenue $ 19,345,000.00 $ 14,888,000.00 Raw Materials $    6,545,000.00 $    4,996,000.00 Package Materials...
If the total output rises while the cost per unit fails, a firm is understood to...
If the total output rises while the cost per unit fails, a firm is understood to be enjoying_____: a. increased profits. b. economies of scale. c. maximum efficiency. d. all of the above. The law of diminishing marginal productivity pertains to_____: a. the short run. b. the long run. c. both the short run and the long run. d. the short run for small firms, and the long run for large firms. Fixed inputs are_____: a. those inputs to production...
The Navajo Generating Station was a 2250 MW plant when operating at full power. a) Assuming...
The Navajo Generating Station was a 2250 MW plant when operating at full power. a) Assuming the plant operates at 38% efficiency and that coal has a heat content of 10,500 BTU/lb, calculate how many tons of coal are used per year if the plant operates at full capacity (assume 24 hrs/day, 7 days/week) . b) Calculate the area needed to replace the power generated by NGS with Si photocells operating at 21% efficiency assuming an average solar insolation of...