Question

In: Physics

A nuclear power plant has an overall efficiency of 31% and a power output of 800MW....

  1. A nuclear power plant has an overall efficiency of 31% and a power output of 800MW. For one year operating at full capacity, calculate a) the number of joules produced; b) the number of fission events that were required to produce those joules; c) the mass of uranium oxide (UO2) that has been used in fission; and d) the market cost of that uranium oxide if it was all high quality.

Solutions

Expert Solution


Related Solutions

A nuclear power plant operates at 40.0% efficiency with a continuous production of 1202 MW of...
A nuclear power plant operates at 40.0% efficiency with a continuous production of 1202 MW of usable power in 1.00 year and consumes 1.23×106 g of uranium-235 in this time period. What is the energy in joules released by the fission of a single uranium-235 atom?
A nuclear power plant operates at 40.0% efficiency with a continuous production of 1002 MW of...
A nuclear power plant operates at 40.0% efficiency with a continuous production of 1002 MW of usable power in 1.00 year and consumes 1.03×106 g of uranium-235 in this time period. What is the energy in joules released by the fission of a single uranium-235 atom?
Label the components of a nuclear power plant
 Label the components of a nuclear power plant A 462.5 ng sample of an unknown radioactive substance was placed in storage and its mass measured periodically. After 47 days the amount of radioactive substance had decreased to 57.81 ng. How many half-lives of the unknown radioactive substance have occurred? Sodium-24, which is used to locate blood clots in the human circulatory system, has a half-life of 15.0 h. A sample of sodium-24 with an inital mass of 24.5 g was stored for...
Consolidated Power, a large electric power utility, has just built a modern nuclear power plant. This...
Consolidated Power, a large electric power utility, has just built a modern nuclear power plant. This plant discharges waste water that is allowed to flow into the Atlantic Ocean. The Environmental Protection Agency (EPA) has ordered that the waste water may not be excessively warm so that thermal pollution of the marine environment near the plant can be avoided. Because of this order, the waste water is allowed to cool in specially constructed ponds and is then released into the...
A nuclear power plant is planned to be constructed near Sydney. The plant is required to...
A nuclear power plant is planned to be constructed near Sydney. The plant is required to have an installed capacity of 1200 MW and will be operated for 7500 hours per year. Consider providing 1200 MW of energy by two solar power plants; one in Sydney and the other in Canberra. It is required that a fixed solar module be mounted. Determine the following parameters if the overall efficiency of the module is given as 15%: a) The peak power...
Governor John has decided that, rather than build a new nuclear power plant to service power...
Governor John has decided that, rather than build a new nuclear power plant to service power needs, the state should save an equivalent amount of energy. As one component of an efficiency plan, he has turned to you, his top aide, to design a policy to encourage adoption of compact fluorescent (CF) lightbulbs. Although CFs save a tremendous amount of money (and energy) over their lifetime, they are quite expensive initially ($20 or so per bulb in 1993). In addition,...
Nobody wants a nuclear power plant in their neighborhood. Unfortunately, the governor must locate a nuclear...
Nobody wants a nuclear power plant in their neighborhood. Unfortunately, the governor must locate a nuclear power plant somewhere inside a 25 square mile area containing four cities. The governor, being primarily concerned with reelection, desires to locate the plant in the location which will cause the least amount of unhappiness among the constituents. In this lab, you will write a program to assist the governor in this difficult decision. METHOD: ^^^^^^^ Assume each city is located in an integer-pair...
A steam power plant has two turbines in series which together develop a power output of...
A steam power plant has two turbines in series which together develop a power output of 25MW. The boiler supplies steam at 80 bar, 500°C to the high-pressure turbine in which there is an enthalpy drop of 420 kJ/kg. The exhaust from the high pressure is at a pressure of 15 bar, at which pressure some of the steam is delivered to an open-type feedwater heater while the remainder is reheated to 450°C. The steam from the reheater is expanded...
Prob.1) Consider a combined gas and steam power plant that has a net power output of...
Prob.1) Consider a combined gas and steam power plant that has a net power output of 450 MW. The pressure ratio of the gas turbine cycle is 14. Air enters the compressor at 300 K and the turbine at 1 400 K. The combustion gases leaving the gas turbine are used to heat the steam to 8 MPa. up to 400 ° C in a heat exchanger. The combustion gases exit the heat exchanger at 460 K. An open feedwater...
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two...
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two 1000 MWe PWRs and are planning the fuel cycle for the next ten years. You are beginning negotiations with your fuel supplier, Verma Fuels, and must choose between the 3.3% enrichment fuel you have been using and a new 5% enrichment fuel.   Briefly discuss two financial considerations in making this decision.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT