You are being asked to obtain the length of a vertical curve for the following situation:...

You are being asked to obtain the length of a vertical curve for the following situation: The location having the vertical curve is aligned under a crossroads at station 199 + 20. The bottom elevation was measured as 158 m above sea level. The PI station is located at 200 + 00 with road centerline elevation of 150 m. The vertical curve is located at the intersection of the tangents with grades -2.5% and 1.5%. The clear distance between the road surface and the overhead structure should be 5.75m. If we know that in five years the road surface will be overlaid with a 100 mm asphalt concrete pavement layer, what should be the length of the curve to allow sufficient clearance now and after five years of service.

Solutions

Expert Solution


Related Solutions

You have a symmetrical sag vertical curve of Length = 6 stations. The entering tangent from...
You have a symmetrical sag vertical curve of Length = 6 stations. The entering tangent from the left has a gradient of –6% and the exiting tangent has a gradient of +4%. The VPC Station has an elevation of 250.00 feet (which will be your C-Value) and its station distance is measured to be at 40+00 stations. You will now do the following: Find the elevation and station of the VPI. Find the elevation and station of the VPT Find...
What would cause the IS curve to be vertical? Assuming that the IS curve is vertical,...
What would cause the IS curve to be vertical? Assuming that the IS curve is vertical, what will the corresponding AD curve look like?
explain the following: * Money supply curve is vertical. * policy is not efficient in the...
explain the following: * Money supply curve is vertical. * policy is not efficient in the Long run
?How will you define "being different"? Think about a situation where you had to experiece "being...
?How will you define "being different"? Think about a situation where you had to experiece "being different". How did the situation end? Principles of Management Post must be a minium of 250 words
You are an IT manager for a small business. You are being asked to create a...
You are an IT manager for a small business. You are being asked to create a network security plan both for internal IT workers and for the company in general. You are to put together a network security plan that addresses each of the following components : Explain the use of virtual private networks (VPNs) and their security benefits and drawbacks. Create a standard procedure for adding new users to a network. Create a summary of a network plan, including...
Suppose the demand curve for a product is vertical and the supply curve is upward sloping....
Suppose the demand curve for a product is vertical and the supply curve is upward sloping. If a unit tax is imposed in the market for this​ product, A. buyers bear the entire burden of the tax. B. buyers share the burden of the tax with government. C. the tax burden will be shared equally between buyers and sellers. D. sellers bear the entire burden of the tax. Explain how a​ downward-sloping demand curve results from consumers adjusting their consumption...
Use the following data to calculate the layout of an equal tangent vertical curve by offsets...
Use the following data to calculate the layout of an equal tangent vertical curve by offsets for every full station. g1 = -1.20% g2 = +3.50% X PVI = 49+70 Y PVI = 5,893.48’ L = 1500’ , find the station and elevation of the high (or low) point of the curve.
A 1000-ft vertical curve connects a -1% grade to a -3.5% grade. If the vertical tangents...
A 1000-ft vertical curve connects a -1% grade to a -3.5% grade. If the vertical tangents intersect at sta. 38+60.24 and elevation 1,400.13 ft, develop an Excel spreadsheet to calculate the elevations of the grade line at each station from sta. 31+00 to 45+00. Include the elevations of the PVC and PVT.
Assuming you are a team of 3 to 4 graduate engineers and you are being asked...
Assuming you are a team of 3 to 4 graduate engineers and you are being asked to form a project team to work on a project of your choice. You should work professionally and coordinate and communicate as far as real engineers in the construction industry in HK. Unit Learning Outcomes: LO1: Assess individual and group skills in order to allocate roles within a collaborative team. 1.Evaluate everyone own skills and discuss through self-auditing or brain storming and review. Highlight...
describe vertical design of highways (vertical curves, types, length calculation, etc.).(max 1 page)
describe vertical design of highways (vertical curves, types, length calculation, etc.).(max 1 page)