Allowance of waste is an important parameter because of the
following reasons
- Materials get wasted at the site during construction due to
various reasons like spillage , some get stuck in the mixing areas
and containers, sometimes the concrete mix doesn't become
satisfactory and have to be dumped , sometimes the materials get
spoilt etc .Basically, we know that we cannot use 100% of the
materials , some get wasted due to different factors.
- In calculation for various materials , the calculated amount is
the exact amount of materials required for the construction
excluding the wastage .
- The allowance for wastage is a certain amount of surplus
materials added so that there is no shortage of materials while the
construction is ongoing.
- The cost estimation for materials are done after calculating
the total amount of the materials, if the allowance for waste is
not added , in case of certain contracts , it will result in loss
of the builders.