Will the time frame of a project affect the completion design? Discuss.

Will the time frame of a project affect the completion design? Discuss.

Solutions

Expert Solution

How time frame of a project affect the completion design:-

Time frame of a project is defind as the time that you decide by proper planning , necessity of the work and how you easily do that work on time, For example if you decided to complete a work in a certain decided time and you are following the pre decided time frame to complete the work properly then it has positive efeect on completcompletion design because by following your pre decided path of work, you must complete your task within the time, so this is good with respect to a project manager or worker to complete the task on time, but if you pre decided a time frame for a project and due to some reason you failed to achieve the daily time frame to complete the work then it affect on your ongoing project as well as, also affect your future projects that is not acceptable for a good project manager and trying to complete it on the pre decided time frame so that it has less affect on your future project.

so in my view a time frame of a project has good as well as bad effect on completion design it depends upon how you manage your time and resources to achieve the goals.

Thankyou dear, please thumbs up ? for my answer, have a nice day,


Related Solutions

Discuss the effect of reservoir fluid properties on completion design
Discuss the effect of reservoir fluid properties on completion design
The Time Numbers represent weeks a. Find the mean time for completion of the project b....
The Time Numbers represent weeks a. Find the mean time for completion of the project b. Find the probability that the project will be completed two weeks earlier than the mean time. Preceding Optimistic Most Likely Pessimistic Activity Activity Time Time Time A. Write Book 10 13 17 B. Design Book Cover A 1 1 1 C. Edit Manuscript A 3 6 9 D. Check Editing C 2 3 6 E. Accept Design B 1 1 1 F. Copy Edit...
Discuss the security arrangements regarding project completion and address factors that constitute completion from the lenders...
Discuss the security arrangements regarding project completion and address factors that constitute completion from the lenders perspective; as well, account for explicit safeguards and obligatory assurances. Words 500 - 550 max + References.
A project completion time can be assumed to be represented by a normal distribution curve The...
A project completion time can be assumed to be represented by a normal distribution curve The project is expected to complete in 36 weeks with a path variance of 6.67 Base on the information provided, calculate: a. Calculate the probability that the project will be completed in 39 weeks or less b. The probability that the project will be completed in between 33.5 and 38 weeks c. With 95 percent probability, calculate the date the project can be completed.
Using? PERT, Adam Munson was able to determine that the expected project completion time for the...
Using? PERT, Adam Munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 22 ?months, and the project variance is 9. ?a) The probability that the project will be completed in 13 months? = nothing ?(round your response to four decimal? places). ?b) The probability that the project will be completed in 21 months? = nothing ?(round your response to four decimal? places). ?c) The probability that the project will be...
Summarize the qualitative risks of on‐time project completion considering the current employment and work environment in...
Summarize the qualitative risks of on‐time project completion considering the current employment and work environment in the U.S. Several members of your programming team live and work throughout the U.S., and are subject to the laws of those states. Additionally, some of the programming tasks could be modified and possibly sub‐contracted to India, Bulgaria, China, Argentina, and Indonesia.Discuss how the project manager should address cost/time trade‐offs associated with international outsourced completion of programming tasks. What criteria should be used to...
Design three relativistic situations and describe the relativistic variables (frame of reference, time dilation, length contraction)...
Design three relativistic situations and describe the relativistic variables (frame of reference, time dilation, length contraction) using a drawing with clear labels and a brief description. Include all necessary equations to describe the situation. Include as much detail as you can such as speed, time, and position
Design three relativistic situations and describe the relativistic variables (frame of reference, time dilation, length contraction)...
Design three relativistic situations and describe the relativistic variables (frame of reference, time dilation, length contraction) using a drawing with clear labels and a brief description. Include all necessary equations to describe the situation. Include as much detail as you can such as speed, time, and position
Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes,...
Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes, claims, and disputes (Max 200 words).             
What is the arrival time, completion time, burst time, turnaround time, and the waiting time of...
What is the arrival time, completion time, burst time, turnaround time, and the waiting time of First Come First Serve (FCFS)?