Question

In: Operations Management

Consider the following four--?step assembly operation with quality problems. -The first resource has a processing time...

Consider the following four--?step assembly operation with quality problems.
-The first resource has a processing time of 7 minutes per unit and one employee doing the operation
? The second resource has a processing time of 4 minutes per unit. It also has one employee doing the operation. However, this is a very delicate task and 0.79 of all products have to be scrapped after this step.
? Two workers are staffed for the third resource. No quality problems occur at this resource and the processing time is 17minutes per unit.
? At the fourth and final resource, one operator handles the product. No quality problems exist at this step and the processing time is 12 minutes per unit.
What is the process capacity per hour? (keep two decimal)

Solutions

Expert Solution

The effective processing time at first resource = 7 minutes / unit

Sine 0.79 of all products have to be scrapped, it is only 0.21 of all products pass on as good products to third resource. The second resource has a processing time ( good + bad products together ) of 4 minutes.

Therefore effective processing time of good products at second resource = 4/ 0.21 =19.04 minutes / unit

Effective processing time at third resource with no quality problem = 17 minutes/ unit

Effective processing time at fourth resource with no quality problem = 12 minutes /unit.

It is the capacity of the bottleneck resource which will decide capacity of the whole process .

The bottleneck resource is the one which takes maximum processing time per GOOD unit.

The bottleneck resource in this case is second resource which takes 19.04 minutes/ unit

Therefore , overall process capacity = 19.04 minutes/ unit

Hence process capacity per hour = 60 / 19.04 units = 3.15 units

PROCESS CAPACITY PER HOUR = 3.15 UNITS


Related Solutions

Consider the following four--‐step assembly operation with quality problems. -The first resource has a processing time o...
Consider the following four--‐step assembly operation with quality problems. -The first resource has a processing time of 5 minutes per unit and one employee doing the operation ‐ The second resource has a processing time of 4 minutes per unit. It also has one employee doing the operation. However, this is a very delicate task and 0.85 of all products have to be scrapped after this step. ‐ Two workers are staffed for the third resource. No quality problems occur...
QUESTION 2 Consider the following four--?step assembly operation with quality problems. -The first resource has a...
QUESTION 2 Consider the following four--?step assembly operation with quality problems. -The first resource has a processing time of 7 minutes per unit and one employee doing the operation ? The second resource has a processing time of 4 minutes per unit.  It also has one employee doing the operation. However, this is a very delicate task and 0.79 of all products have to be scrapped after this step. ? Two workers are staffed for the third resource. No quality problems...
7. Consider a two-step, serial, production process with one resource at each step. The processing time...
7. Consider a two-step, serial, production process with one resource at each step. The processing time at step 1 is 10 minutes and the processing time at step 2 is 5 minutes. There is ample supply of raw materials for step 1 and ample demand. a) What is the capacity of this process in units per hour? b) Suppose there is variability in the processing time at step 2. Specifically, the coefficient of variation of processing time at step 2...
Consider a four-step serial process with processing times given in the following list. There is one...
Consider a four-step serial process with processing times given in the following list. There is one machine at each step of the process, and this is a machine-paced process. bullet Step 1: 25 minutes per unit bullet Step 2: 15 minutes per unit bullet Step 3: 30 minutes per unit bullet Step 4: 20 minutes per unit Assuming that the process starts out empty, how long will it take (in hours) to complete a batch of 105 units?
A batch production operation has a machine setup time of 4.0 hr and a processing time...
A batch production operation has a machine setup time of 4.0 hr and a processing time of 1.50 min per cycle. Three parts are produced each cycle. No tool handling time is included in the cycle. Part handling time each cycle is 30 sec. It consists of the worker obtaining three starting work units from a parts tray, loading them into the machine, and then after processing, unloading the completed units and placing them into the same tray. Each tray...
Consider the following snapshot of a system that has four resource types: A, B, C, and...
Consider the following snapshot of a system that has four resource types: A, B, C, and D and five processes, P0, P1, P2, P3, and P4. Allocation Max A B C D A B C D P0 3 0 1 5 5 1 1 7 P1 2 2 1 0 3 2 1 1 P2 3 1 2 1 3 3 2 1 P3 0 5 1 0 4 6 1 2 P4 4 2 1 3 6 3 2...
Walton Corporation has four divisions: the assembly division, the processing division, the machining division, and the...
Walton Corporation has four divisions: the assembly division, the processing division, the machining division, and the packing division. All four divisions are under the control of the vice president of manufacturing. Each division has a manager and several departments that are directed by supervisors. The chain of command runs downward from vice president to division manager to supervisor. The processing division is composed of the paint and finishing departments. The May responsibility reports for the supervisors of these departments follow:...
Campbell Corporation has four divisions: the assembly division, the processing division, the machining division, and the...
Campbell Corporation has four divisions: the assembly division, the processing division, the machining division, and the packing division. All four divisions are under the control of the vice president of manufacturing. Each division has a manager and several departments that are directed by supervisors. The chain of command runs downward from vice president to division manager to supervisor. The processing division is composed of the paint and finishing departments. The May responsibility reports for the supervisors of these departments follow:...
Amarillo Corporation has four divisions: the assembly division, the processing division, the machining division, and the...
Amarillo Corporation has four divisions: the assembly division, the processing division, the machining division, and the packing division. All four divisions are under the control of the vice president of manufacturing. Each division has a manager and several departments that are directed by supervisors. The chain of command runs downward from vice president to division manager to supervisor. The processing division is composed of the paint and finishing departments. The May responsibility reports for the supervisors of these departments follow:...
Amarillo Corporation has four divisions: the assembly division, the processing division, the machining division, and the...
Amarillo Corporation has four divisions: the assembly division, the processing division, the machining division, and the packing division. All four divisions are under the control of the vice president of manufacturing. Each division has a manager and several departments that are directed by supervisors. The chain of command runs downward from vice president to division manager to supervisor. The processing division is composed of the paint and finishing departments. The May responsibility reports for the supervisors of these departments follow....
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT