It is desired to develop a means chart and a range chart for a process that puts a cola drink
into bottles.  The nominal goal is to put 16 oz. into each bottle.  The data were obtained from 25 of size 4
A. Construct means and range charge obtained information and 3-sigma limits.
B. Then graph the data on the chart.  Identify any samples that indicate the process is out of
control.
Pop into Bottles Problem
Sample number Item 1 Item 2 Item 3 Item 4
1 16.01783 16.00249 16.00451 15.94237
2 15.98764 16.00713 15.97385 16.00362
3 16.00253 16.00251 15.97343 15.98449
4 16.01994 16.00793 16.00592 15.97239
5 15.99596 16.00336 16.00137 15.98503
6 15.9938 15.99357 16.00254 15.98667
7 15.98799 15.99871 15.97896 15.95939
8 16.01234 16.00982 15.98147 15.9929
9 16.00267 15.99257 15.98403 15.99413
10 16.01079 16.00738 16.00969 15.95743
11 16.0093 16.00942 15.97481 16.00514
12 15.99942 16.00028 15.97622 15.9607
13 15.98469 16.00018 15.99772 15.95608
14 16.01878 15.99014 15.97092 15.95334
15 16.00395 15.9985 16.00445 15.95483
16 16.00048 15.99394 15.97393 15.96496
17 16.00953 15.99736 16.00449 15.9914
18 15.99745 15.99101 15.9846 16.00898
19 16.01559 16.00196 15.9869 15.96941
20 16.01938 16.00702 15.98757 16.00441
21 15.98027 15.99967 15.97739 15.96144
22 16.0127 16.00559 15.97053 15.96983
23 16.00743 16.00365 15.97541 15.97034
24 15.98654 16.00141 16.00254 15.96317
25 16.00996 15.99368 15.97339 15.94784

Solutions

Expert Solution

The solution to both the parts is given below:

A X bar R chart will be made in this regard...

The Grand Mean and the Overall Range is calculated below:

Grand Mean is just the overall average of the group means and the Overall Range is the average of the group range.

Range = Maximum Value - Minimum Value

Formulas:

Table for A2

In this case A2 will be 0.729 as the sample size is 4.

So,

From X bar R Chart formulas,

LCL = 15.99 - 0.729*0.0388 = 15.962 (Lower Control Limit)

UCL = 15.99 + 0.729*0.0388 = 16.02 (Upper Control Limit)

Based on 3 Sigma limit:

LCL = 15.99 - 3*0.0388 = 15.874 (Lower Control Limit)

UCL = 15.99 + 3*0.0388 = 16.11 (Upper Control Limit)

Control Chart

Here, the two black lines denotes the LCL (Lower Control Limit) and the UCL (Upper Control Limit)

Here as all the points are under the control limits, so the process is under control...

End of the Solution...


Related Solutions

How would I develop a payroll process swimline chart?
How would I develop a payroll process swimline chart?
Five samples of size 4 were taken from a process. A range chart was developed that...
Five samples of size 4 were taken from a process. A range chart was developed that had LCLr = 0 and UCLr = 2.50. Similarly, an average chart was developed with the average range from the five samples, with LCLx = 15.0 and UCLX = 24.0. The ranges for each of the five samples were 1.75, 2.42, 2.75, 2.04, and 2.80, respectively. The values of the sample average for each sample were 19.5, 22.3, 17.4, 20.1, and 18.9, respectively. What...
What is a chart of accounts? Why is it important to develop a chart of accounts?...
What is a chart of accounts? Why is it important to develop a chart of accounts? What impact on a company would there be if a company's chart of accounts has errors or one was not developed? Provide 3 specific examples.
It is desired to determine if the means of two different processes differ. a) Perform a...
It is desired to determine if the means of two different processes differ. a) Perform a .05 level test assuming equal variances. Ho: __________________ Test Statistic: _______________________ Ha: __________________ p-value: ___________________________ Conclusion: Fail to Reject Ho Reject Ho b) Perform a .05 level test not assuming equal variances. Ho: __________________ Ha: __________________ c) Perform a test for equal variances at the .05 level. Ho: __________________ Ha: __________________ Test Statistic: _______________________ p-value: ___________________________ Conclusion: Fail to Reject Ho Reject Ho Test...
Develop a Gantt Chart based on Table below. On the same Gantt chart, use a legend...
Develop a Gantt Chart based on Table below. On the same Gantt chart, use a legend to show the project plan and the (actual) project progress. Discuss the significance of the two paths or what they mean to the project. Activity immediate predecessors normal time budget organizational unit percent complete A - 4 $90 U1 100 B A 2 $35 U2 100 C A 6 $75 U2 40 D B 3 $60 U1 80 E C 10 $80 U1 0...
It is desired to develop a statistical acceptance procedure based on variables for the percentage compaction...
It is desired to develop a statistical acceptance procedure based on variables for the percentage compaction of stabilized base-course layers. From a historical summary of data, the standard deviation of the percentage of compaction is known to be 3.31%. The mean value of percentage of compaction, for successfully performing layers, from the contractor point of view is 99.0%. It has been agreed that the probability for rejecting a base course whose mean percentage of compaction is 99.0% should be 2%...
What is the range chart? Why were range charts rather thanstandard deviation charts once used...
What is the range chart? Why were range charts rather than standard deviation charts once used to monitorthe spread of manufacturing processes?Explain why the mean chart and the range chart must be examined together.
Develop a chart that includes the structure and function of the following: • Skin • Keratinocytes...
Develop a chart that includes the structure and function of the following: • Skin • Keratinocytes • Melanocytes • Langerhans cells • Merkel • Cells • Dermis • Basement membrane zone • Sebaceous gland • Eccrine gland • Apocrine gland • Nails • Hair
What is a range chart? Why were range charts rather than standard deviation charts once used...
What is a range chart? Why were range charts rather than standard deviation charts once used to monitor the spread of manufacturing processes?
35. ________ is the process of creating and delivering desired goods and services to customers and...
35. ________ is the process of creating and delivering desired goods and services to customers and involves all of the activities associated with winning and retaining loyal customers. Select one: a. Marketing b. Personal selling c. Promotion d. Customer service
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT