Question

In: Civil Engineering

You are a project manager. Attached you have a project definition provided by a Project Owner....

You are a project manager. Attached you have a project definition provided by a Project Owner. You have assisted the owner in developing a brief scope based on the project objective. From this limited scope you are to create a design proposal as an architectural(discipline)

1)Why are we doing this project? –Project objective provided by owner

2)What is needed to accomplish the end objective of the project? (plans, specifications, industry standards)

3)What is the cost to complete the project?

4)How much time is required to complete the project design?

5)Who will do the work? (i.e. with personnel in-house, or will it be subcontracted out to another firm)

Your proposal must include the scope of design services offered, the schedule for delivering these design services, and the budget for completing the design services rendered. You may also include basic information about your company including history, qualifications, expertise, and past projects.This information should be a maximum of one page. Please include a graphic such a Gantt(Bar) Chart for a schedule and/or a table for the budget or fee schedule

The Scenario:

Middle School Building Project: The new middle school building includes classrooms, offices and administrative spaces, dining commons with kitchen, and media center. Additional spaces that may be part of the final design include auditorium,gymnasium and athletic fields. Building construction may consist of a multi-story masonry and steel load bearing building with elevated slabs, poured in-place concrete retaining walls and associated underground waterproofing. Exterior finish materials may include brick veneer, aluminum storefront and curtain wall, and aluminum composite wall panels. Interior finish materials may include masonry and drywall partitions, brick veneer, cementitious terrazzo flooring, VCT and carpet tile, and lay-in acoustical tile ceiling. Roofing systems include TPO single ply roof system or standing seam metal roofing system. Building systems include forced air mechanical systems, plumbing, fire protection, electrical, communications, security and data systems. Site construction consists of work on approximately 20 acres, including erosion and sediment control measures, clearing and grubbing, storm water piping and retention ponds, building pad preparation, utilities including a forced main sanitary system, temporary and permanent parking areas and driveways, bus loop, concrete walks, areas of concrete, fencing and other miscellaneous site work.

Solutions

Expert Solution

​​​​​​​


Related Solutions

What are project management concepts that have been implemented by a construction manager, owner, or general...
What are project management concepts that have been implemented by a construction manager, owner, or general contractor as specifically engaged to control budget, schedule, or cost on a project? What type of owners manage projects directly, without an independent construction manager or project manager? What are the experience requirements for contractors, site managers, or superintendents? What are typical education requirements to be a construction project manager?
You have been assigned to work as a project manager on a very important project that...
You have been assigned to work as a project manager on a very important project that requires significant funding. There are several options to consider. Being new to the organisation, you have very limited knowledge of the organisational dynamics, industry and funding preferences. As a project manager, what do you think your duties are on this project? Name a few essential steps and activities you will need to do to effectively perform your job.
As a programmer in a java project, you have been asked by your project manager to...
As a programmer in a java project, you have been asked by your project manager to describe the most efficient way to store the following assigned numbers 10,20,30,1000,200,350 for an operation which involves on calculation such as sum and average.
Suppose that you have been appointed the project manager for a project to develop an online...
Suppose that you have been appointed the project manager for a project to develop an online booking system for a multi-doctor medical practice that will replace an existing desktop system. The key functionality that is required is as follows: Patient registration Patient login Book first available appointment with any doctor Book an appointment at a time of the patient’s choosing with a doctor of their choice. What development methodologies should you consider? How would you stage the work for each...
Suppose that you have been appointed the project manager for a project to develop an online...
Suppose that you have been appointed the project manager for a project to develop an online booking system for a multi-doctor medical practice that will replace an existing desktop system. The key functionality that is required is as follows: Patient registration Patient login Book first available appointment with any doctor Book an appointment at a time of the patient’s choosing with a doctor of their choice. a. What development methodologies should you consider? How would you stage the work for...
1. You are a Facility Manager. You have a project that is desperately in need of...
1. You are a Facility Manager. You have a project that is desperately in need of carpet. a. This project need is 3000 Square Feet. i. A high quality carpet costs $24/Square Yard and a low quality carpet costs $18/Square Yard. ii. The high quality carpet has a life expectancy of 10 years and the low quality carpet of 7 years. iii. The labor to maintain the high quality carpet is $1000 /Year and the low quality is $800. iv....
You have been appointed as the Project Manager for a New Product Launch Project by your...
You have been appointed as the Project Manager for a New Product Launch Project by your company. You must prepare a set of documents for the project kick-off meeting coming up next month. Task 1: Prepare a Project Charter for the New Product Launch Project (according to the choice of your product as explained above). Please use the Project Charter template given below Name of the Project Background [Why is the project being undertaken? Describe an opportunity or problem that...
Question 1 Suppose that you have been appointed the project manager for a project to develop...
Question 1 Suppose that you have been appointed the project manager for a project to develop an online booking system for a multi-doctor medical practice that will replace an existing desktop system. The key functionality that is required is as follows: • Patient registration • Patient login • Book first available appointment with any doctor • Book an appointment at a time of the patient’s choosing with a doctor of their choice. What development methodologies should you consider? How would...
A property owner has provided you with the following information. Assume the owner has no other...
A property owner has provided you with the following information. Assume the owner has no other assets or liabilities. The annual gross revenue is $3,275,000. The debt service payment on the loan is $147,000 per month. The capitalization rate is 8%. Assets: Cash $ 1,000,000 Land 1,500,000 Building 29,500,000 Total Assets $ 32,000,000 Liabilities & Equity: Nonrecourse Liabilities $ 25,000,000 Partner’s Capital 7,000,000 Total Liabilities & Capital $ 32,000,000 14. What is the property’s NOI? Calculate the Debt Service Coverage...
Assume on your project, you have a requested but unresolved change as you provided direction to...
Assume on your project, you have a requested but unresolved change as you provided direction to the seller to take action. You consider this change to be one that is— a. A claim b. A constructive change to the contract c. One that requires the need to negotiate a settlement d. An undefinitized contractual action
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT