Question

In: Accounting

Question text Activity-Based Costing Slack Corporation has the following predicted indirect costs and cost drivers for...

Question text

Activity-Based Costing
Slack Corporation has the following predicted indirect costs and cost drivers for 2016 for the given activity cost pools:

Fabrication Department Finishing Department

Cost Driver

Maintenance $80,000 $70,000

Machine hours

Materials handling 30,000 15,000

Material moves

Machine setups 70,000 5,000

Machine setups

Inspections - 25,000

Inspection hours

$180,000 $115,000

The following activity predictions were also made for the year:

Fabrication Department Finishing Department
Machine hours 10,000 5,000
Material moves 3,000 1,500
Machine setups 700 50
Inspection hours - 1,000

It is assumed that the cost per unit of activity for a given activity does not vary between departments. Slack's president, Charles Slack, is trying to evaluate the company's product mix strategy regarding two of its five product models, ZX300 and SL500. The company has been using a company-wide overhead rate based on machine hours but is considering switching to either department rates or activity-based rates. The production manager has provided the following data for the production of a batch of 100 units for each of these models:

ZX300 SL500
Direct materials cost $18,000 $24,000
Direct labor cost $5,000 $4,000
Machine hours (Fabrication) 500 700
Machine hours (Finishing) 200 100
Materials moves 30 50
Machine setups 5 9
Inspection hours 30 60

a. Determine the cost of one unit each of ZX300 and SL500, assuming a company-wide overhead rate is used based on total machine hours.

Round rate to two decimal places.
Overhead rate based on total machine hours Answer per machine hour

Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number. Round cost per unit to two decimal places.

Product Costs per Unit

ZX300

SL500

Direct materials $Answer $Answer
Direct labor Answer Answer
Manufacturing overhead: Answer Answer
Total cost per batch $Answer $Answer
Number of units per batch Answer Answer
Cost per unit $Answer $Answer

b. Determine the cost of one unit of ZX300 and SL500, assuming department overhead rates are used. Overhead is assigned based on machine hours in both departments.

Round rate to two decimal places, if applicable.
Overhead rate based on machine hours for Fabrication Dept. $Answer per machine hour
Overhead rate based on machine hours for Finishing Dept. $Answer per machine hour

Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number, when needed. Round cost per unit to two decimal places, if needed.

Product Costs per Unit
Product Costs per Unit

ZX300

SL500

Direct materials $Answer $Answer
Direct labor Answer Answer
Manufacturing overhead:
Fabrication Dept. Answer Answer
Finishing Dept. Answer Answer
Total cost per batch $Answer $Answer
Number of units per batch Answer Answer
Cost per unit $Answer $Answer

c. Determine the cost of one unit of ZX300 and SL500, assuming activity-based overhead rates are used for maintenance, materials handling, machine setup, and inspection activities.
Round rate to two decimal places, if applicable.

Activity-based overhead rates:
Maintenance

$Answer   per machine hour

Materials handling

$Answer per materials move

Machine setup

$Answer per machine setup

Inspection activities

$Answer per inspection hour

Use rounded overhead rate calculated above for calculations below. Round cost answers to the nearest whole number, when needed. Round cost per unit to two decimal places, if needed.

Product Costs per Unit

ZX300

SL500

Direct materials $Answer $Answer
Direct labor Answer Answer
Manufacturing overhead:
Maintenance activity Answer Answer
Materials handling activity Answer Answer
Machine setups activity Answer Answer
Inspections activity Answer Answer
Total cost per batch $Answer $Answer
Number of units per batch Answer Answer
Cost per unit $Answer $Answer

Solutions

Expert Solution

a)
Product Costs per Unit
ZX300 SL500
Direct materials 18000 24000
Direct labor 5000 5000
Manufacturing overhead: (WN1) 137667 157333
Total cost per batch 160667 186333
Number of units per batch 100 100
Cost per unit 1606.67 1863.33
WN1 - Manufacturing overhead:
Total manufacturing overhead costs (180000+115000) = 295000
Total machine hours of product ZX300 (500+200) = 700
Total machine hours of product SL500 (700+100) = 800
Total manufacturing overhead costs of ZX300 (295000*(700/1500)) = 137667
Total manufacturing overhead costs of SL500 (295000*(700/1500)) = 157333
b)
Product Costs per Unit
ZX300 SL500
Direct materials 18000 24000
Direct labor 5000 4000
Manufacturing overhead:
Fabrication Dept. 75000 105000
(180000*(500/1200)) (180000*(700/1200))
Finishing Dept.                             76,667                             38,333
(115000*(200/300)) (115000*(100/300))
Total cost per batch                          1,74,667                          1,71,333
Number of units per batch 100 100
Cost per unit                                1,747                                1,713
c)
Activity-based overhead rates:
Fabrication Dept. Finishing Dept.
Maintenance 8 14
(80000/10000) (70000/5000)
Materials handling 10 10
(30000/3000) (15000/1500)
Machine setup 100 100
(70000/700) (5000/50)
Inspection activities 25
(25000/1000)
Product Costs per Unit
ZX300 SL500
Direct materials 18000 24000
Direct labor 5000 4000
Manufacturing overhead:
Maintenance activity 6800 7000
(8*500)+(14*200) (8*700)+(14*100)
Materials handling activity 600 500
(10*30)+(10*30) (10*50)+(10*50)
Machine setups activity 1000 1800
(100*5)+(100*5) (100*9)+(100*9)
Inspections activity 750 1500
(25*30) (25*60)
Total cost per batch 32150 38800
Number of units per batch 100 100
Cost per unit 321.5 388

Related Solutions

Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $ 60,000 30,000 Machine hours Materials handling 90,000 45,000 Material moves Machine 210,000 15,000 Machine setups Inspections - 75,000 Inspection hours Total $ 360,000 $165,000 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 25 Inspection...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $ 54,000 27,000 Machine hours Materials handling 81,000 40,500 Material moves Machine 189,000 13,500 Machine setups Inspections - 67,500 Inspection hours Total $ 324,000 $ 148,500 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 25...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $ 54,000 27,000 Machine hours Materials handling 81,000 40,500 Material moves Machine 189,000 13,500 Machine setups Inspections - 67,500 Inspection hours Total $ 324,000 $ 148,500 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 25...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $ 54,000 27,000 Machine hours Materials handling 81,000 40,500 Material moves Machine 189,000 13,500 Machine setups Inspections - 67,500 Inspection hours Total $ 324,000 $ 148,500 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 25...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $ 60,000 30,000 Machine hours Materials handling 90,000 45,000 Material moves Machine 210,000 15,000 Machine setups Inspections - 75,000 Inspection hours Total $ 360,000 $165,000 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 25 Inspection...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for...
Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $ 60,000 30,000 Machine hours Materials handling 90,000 45,000 Material moves Machine 210,000 15,000 Machine setups Inspections - 75,000 Inspection hours Total $ 360,000 $165,000 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 25 Inspection...
Slack Corporation has the following predicted indirect costs and cost drivers for 2019 for the given...
Slack Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $20,000 $10,000 Machine hours Materials handling 30,000 15,000 Material moves Machine setups 70,000 5,000 Machine setups Inspections - 25,000 Inspection hours $120,000 $55,000 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 10,000 5,000 Material moves 3,000 1,500 Machine setups 700 50 Inspection hours - 1,000 It...
Exercise C: Activity-Based Costing Erte, Inc. has the following predicted indirect costs and cost drivers for...
Exercise C: Activity-Based Costing Erte, Inc. has the following predicted indirect costs and cost drivers for 2017 for the given activity cost pools: Manufacture Department Finishing Department Cost Driver Maintenance $30,000 $15,000 Machine hours Materials handling $40,000 $25,000 Material moves Machine setups $80,000 $5,000 Machine setups Inspections $0 $20,000 Inspection hours Total 150,000 $65,000 The following activity predictions were also made for the year: Manufacture Department Finishing Department Machine hours 15,000 8,000 Materials moves 5,000 3,500 Machine setups 900 150...
Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given...
Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $96 ,000 48,000 Machine hours Materials handling 144,000 72,000 Material moves Machine 336,000 24,000 Machine setups Inspections - 120,000 Inspection hours Total $ 576,000 $264 ,000 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 25 Inspection hours...
Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given...
Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Department Finishing Department Cost Driver Maintenance $ 36,000 18,000 Machine hours Materials handling 54,000 27,000 Material moves Machine 126,000 9,000 Machine setups Inspections - 45,000 Inspection hours Total $ 216,000 $ 99,000 The following activity predictions were also made for the year: Fabrication Department Finishing Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 25 Inspection hours...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT