Question

In: Computer Science

The system development project team at Birdie Masters golf schools has been working on defining the...

The system development project team at Birdie Masters golf schools has been working on defining the architecture design for a new system. The major focus of the project is a networked school location operations system allowing each school location to easily record and retrieve all school location transaction data. Another system element is the use of the Internet to enable current and prospective students to view class offerings at any of the Birdie Masters’ locations, schedule lessons and enroll in classes at any Birdie Masters’ location, and maintain a student progress profile—a confidential analysis of the student’s golf skill development. The project team has been considering the globalization issues that should be factored into the architecture design. The school’s plan for expansion into the golf-crazed Japanese market is moving ahead. The first Japanese school location is tentatively planned to open about 6 months after Minicases 267 the target completion date for the system project. Therefore, it is important that issues related to the international location be addressed now during design.
Prepare a set of nonfunctional requirements, including operational requirements, performance requirements, security requirements, and cultural and political requirements. Much information is incomplete, but do your best.

Write in complete sentences and ensure the number of words is between 150 and 200. Include any diagram, as deemed necessary.

Solutions

Expert Solution

PLEASE GIVE IT A THUMBS UP, I SERIOUSLY NEED ONE, IF YOU NEED ANY MODIFICATION THEN LET ME KNOW, I WILL DO IT FOR YOU
100% unique

The framework improvement group is planning to characterize the engineering plan fora new framework at Birdie Masters golf schools.

Their point is to build up the new framework with the goal that the schools are situated in numerous areas.

These schools ought to be organized to follow each school's exchanges.

Web should be empowered to follow the booked exercises and view the understudy's advancement profile privately.

Another branch is wanted to open in Japan with the thought of the globalization issues.

The principal Japanese school area is intended to open around a half year after the objective finishing date for the framework venture.

The venture group should advance the new framework with the assistance of the non-useful necessities.

Nonfunctional necessities:)

• Operational Requirements

• Performance Requirements

• Security necessities and

• Cultural and political prerequisites

Operational necessities:

It characterizes the circumstance wherein the framework plays out its activity. It explicitly characterizes the working framework, data framework for which the framework works. It additionally decides the equipment and programming needs to execute the framework plan. Since, the framework need to store the data of the understudy, they require information base. Subsequently, they are utilizing arranged connection the consideration ought to be taken to check whether the web availability is working acceptable in present and in future. The framework ought to be viable with the portable and PDA.

Execution Requirements:

Execution necessities portray the issues "th like reaction, time, limit and dependability, adaptability. Exchange delay.

Exchange delay:

How much the framework takes to refresh the inquiries or exchange in the information base done by the client is exchange delay.

Limit:

Limit necessities will figure how much number of administrators can address the framework simultaneously 'immediately. The correspondence postponement ought to be limited.

Reaction Time:

Reaction time is the time takenby the framework to respond in due order regarding the client questions and the solicitation. The framework shouldbe set up in such manner it should have less reaction time. The architect ought to give very much planned correspondence over organizations. For instance, the client can demand the understudy record. For this the framework should give reaction for the client immediately.

Sealability:

Versatility is about the framework should be adaptable in any event, when the quantity of clients expanding persistently.

Accessibility:

The data about the understudy ought to be accessible for the client whenever fie all day, every day). Dependability: The unwavering quality is about the framework should be solid even it went through on some difficulty. The data need not be changed and it should hold just the solid data.

Security Requirements:

Security prerequisites manages the issues associated with security, for example, the assurance of the data or information misfortune. Security is the indispensable issue in the web. On the off chance that any infection assaults the framework, at that point the data put away in the framework may get harmed. So as to ensure the data in the framework, the originator ought to introduce firewall, antivirus. It's about who are everything getting to the information and these information require to ensure by the antivirus. The assets of the framework shouldbe taken consideration by specific individual. Just enlisted understudies are permitted to see the class, access the notes or download the talk notes and so forth. Access is given for the understudies see just their profile. The understudy profile should just be taken consideration by the educator. These information need be looked after secretly.

Social and political prerequisites:

Social and political prerequisites are needed to the nations who introduce the application. The framework ought to be set up in such manner that it ought to be acknowledged internationally. The framework must be created in numerous dialects. This encourages the understudy to know the subject plainly. They CM select their separate language. This CM be finished by declaring the discrete multilingual framework. In this framework the meaning of the language is set and it is fixed at the hour of installation.(For model, the American area is stacked with the English variant and the Japan areas are stacked with the Japanese area..


Related Solutions

A Project plan has been developed by the project team. The scheduled data are given in...
A Project plan has been developed by the project team. The scheduled data are given in the following table Activity predecessor Normal time Crash Time Normal cost Crash COST COST SLOPE A - 12 7 3000 5000 400 B A 8 5 2000 3500 500 C A 4 3 4000 7000 3000 D B,C 12 9 50000 71000 7000 E B,C 4 1 500 1100 200 F E 4 1 500 1100 200 G D,F 4 3 15000 22000 7000...
Assume that you are part of a development team that is working on a new warehouse...
Assume that you are part of a development team that is working on a new warehouse management system. You have the task of investigating software packages that are available through ASPs. Using the World Wide Web, identify at least two potential sources of such software. What are the pros and cons of this approach to obtaining a software package? Write in complete sentences. The answer may not exceed 100 words.
You are participating in the customer side team in a project for the development of a...
You are participating in the customer side team in a project for the development of a new laboratory information system. Answer the two subquestions below: A. Provide a specific list of 7 functional characteristics that this system needs to have. B. How can hospitals improve the precision of patient identification in such laboratory systems?
Your company's research and development department has been working on a new process that, if it...
Your company's research and development department has been working on a new process that, if it works, can produce oil from coal at a cost of about $15 per barrel versus a current market price of $100 per barrel. The company needs $10 million of external funds at this time to complete the research. The results of the research will be known in about one year, and there is about a 50-50 chance of success. If the research is successful,...
Scenario You are the manager of a software development team working on new applications for your...
Scenario You are the manager of a software development team working on new applications for your company, Optimum Way Development, Inc. Your director has called for all development teams to submit product briefs detailing their current projects. The director plans to share the most promising product briefs with clients at an upcoming meeting. You have software design documents for two potential projects. Directions You must choose one of the potential products and use the information contained in the technical specification...
Reflect upon your experience of working as a team on a project project. What did you...
Reflect upon your experience of working as a team on a project project. What did you expect from the project and from the roles you fulfilled within your group? How did those expectations compare to your experience? If you hit any snags as a group, how did you address them? Is there anything you would do differently? Then, provide honest and specific feedback about the experience of working with your peers. Pretend that your supervisor has taken you into their...
Oxnard Petro, Ltd., has three interdisciplinary project development teams that function on an ongoing basis. Team...
Oxnard Petro, Ltd., has three interdisciplinary project development teams that function on an ongoing basis. Team members rotate from time to time. Every 4 months (three times a year) each department head rates the performance of each project team (using a 0 to 100 scale, where 100 is the best rating). Are the main effects significant? Is there an interaction? Year Marketing Engineering Finance 2007 88 77 79 84 76 91 85 66 97 2009 90 78 77 82 76...
Oxnard Petro, Ltd., has three interdisciplinary project development teams that function on an ongoing basis. Team...
Oxnard Petro, Ltd., has three interdisciplinary project development teams that function on an ongoing basis. Team members rotate from time to time. Every 4 months (three times a year) each department head rates the performance of each project team (using a 0 to 100 scale, where 100 is the best rating). Are the main effects significant? Is there an interaction? Year Marketing Engineering Finance 2007 82 65 95 84 83 93 86 68 91 2009 88 74 85 87 66...
Oxnard Petro, Ltd., has three interdisciplinary project development teams that function on an ongoing basis. Team...
Oxnard Petro, Ltd., has three interdisciplinary project development teams that function on an ongoing basis. Team members rotate from time to time. Every 4 months (three times a year) each department head rates the performance of each project team (using a 0 to 100 scale, where 100 is the best rating). Are the main effects significant? Is there an interaction? Year Marketing Engineering Finance 2007 90 69 96 84 72 86 80 78 86 2009 72 73 89 83 77...
a) In some projects, the dedicated team working on the project is allowed to get things...
a) In some projects, the dedicated team working on the project is allowed to get things done without going through the normal procedures within their parent organisation. What are the advantages of this and what are the risks/disadvantages? b) What does the punctuated equilibrium model suggest about the use of milestones? Explain your answer.