In: Civil Engineering
A conventional non-aerated lagoon with a hydraulic retention time of one year is used to treat domestic sewage in a wastewater treatment plant. The plant needs to be upgraded to handle a larger wastewater flow rate and to improve the removal of nutrients. List three treatment system upgrades (by using process diagrams) that can be done to the existing lagoon, and provide a schematic diagram for each upgraded process. What do you think the best choice between the three upgrades you suggested is and why?
Water Resources Engineering
pages may not be in oroper series. Arrange them as per page no. Written on each page please.