A developer is going to build a new commercial building in Kowloon Tong. The features of...

A developer is going to build a new commercial building in Kowloon Tong. The features of the building are described as follows:

  1. Number of storey: 25 floors
  2. Floor areas: approx. 600m2 (each floor)
  3. Core areas: approx. 100m2 (each floor)
  4. G/F to 2/F: Restaurant premises (40% of the UFA); Retail establishments (60% of the UFA)
  5. 3/F to 25/F: Office premises

Note: UFA denotes Usable Floor Area

i ) Calculate the total cooling load for a given building.

This part fulfills the requirement of P5

Solutions

Expert Solution

The calculations and result is given in following image:

P.s- In case you have any questions or didn't get my handwriting at some point in the image then feel free to ask in comments below. Also please upvote if you find the answer helpful. Thank you in advance.


Related Solutions

1. A developer in Chicago is planning to build a 7 story building with 28 condo...
1. A developer in Chicago is planning to build a 7 story building with 28 condo units (14 one bedroom units and 14 two bedroom units). The target market is the growth in new households living within a 1 mile radius of downtown Chicago with age groups 25-64. The construction takes approximately one year and is expected to be completed at the end of 2019. From comparable pricing data, they expect to sell the one bedroom condos for $750,000 each...
Raider Red Construction entered into a contract to build a commercial building for $3,600,000. Raider Red...
Raider Red Construction entered into a contract to build a commercial building for $3,600,000. Raider Red Construction uses the percentage-of-completion method for recognizing revenue on the project. Construction began in September of 2018 and the building was completed in June of 2020. The company provided the following additional information on the project. 2018 2019 2020 Costs incurred to date $                 725,000 $              2,100,000 $              3,400,000 Estimated costs to complete $              2,175,000 $              1,400,000 $                             -   Billings during the year $                ...
STATEMENT OF PROBLEM A developer is building houses in a new neighborhood. She offers 3 house...
STATEMENT OF PROBLEM A developer is building houses in a new neighborhood. She offers 3 house plans: “Montgomery”, “Kettering”, and “Saxon”   Although all the windows are the same, each house plan requires a different number of windows: the Montgomery takes 20 windows, the Kettering 15, and the Saxon 12.   She wants you to design a programming solution that will allow her to enter the number of houses she plans to build of each model and have the program display the...
Granite Manufacturing Company is going to hire a contractor to build a new manufacturing plant in...
Granite Manufacturing Company is going to hire a contractor to build a new manufacturing plant in Connecticut.   The Company comes to you for advice regarding what sales and use tax exemptions would be available to them in constructing the new plant. The manufacturing complex will include a separate building for research and development. What advice can you give them? Identity possible savings in their purchases.  
A real estate developer plans to build an apartment building near a major university aimed at generating rental income from graduate students.
Real Estate DevelopmentA real estate developer plans to build an apartment building near a major university aimed at generating rental income from graduate students.  Four types of apartment are being considered in the planning process: studio apartments and 1, 2 or 3-bedroom units.  It is assumed that studio apartments will be 500 sq. ft., 1-bedroom units will be 700 sq. ft., 2-bedroom units will be 800 sq. ft. and 3-bedroom units will be 1,000 sq. ft.The develop does not believe that the...
Stone Age Construction Pte Ltd entered into a construction contract to build a commercial building for Bintang Ltd for $9,200,000.
Stone Age Construction Pte Ltd entered into a construction contract to build a commercial building for Bintang Ltd for $9,200,000. Construction commenced on 1 January 2021. The following details relate to the construction project as at 31 December 2021:                                                   S'000Progress billing to-date             5,520Cash receipt to-date                  5,120Costs incurred to-date               4,032Estimated total costs                  6,400Stone Age Construction Pte Ltd accounted for the contract using the percentage-of-completion method.Required:(a) For the year ended 2021, calculate the percentage of completion to-date, revenue recognised for the year...
The Young Company enters into a long-term project to build a new office building. The Contract...
The Young Company enters into a long-term project to build a new office building. The Contract price is $9,000,000 and Young expects to complete the project in three years. Young gives you the following information for the first two years regarding the project: 2017 2018 Actual costs incurred during year 2,400,000 3,800,000 Estimated costs to complete at as of December 31: 5,100,000 3,000,000 Amounts billed to customer 2,800,000 4,100,000 Collections from customer 2,600,000 3,400,000 Required: 1.    Prepare the journal entries...
We can remodel our existing building at a cost of $6.9 million, or build a new...
We can remodel our existing building at a cost of $6.9 million, or build a new building at a cost of $11 million. The old building, after it is refurbished, would not be as efficient as the new one, and energy costs would, therefore, be $750,000 a year higher. The maintenance cost for the old building would be $450,000 per year and $420,000 for the new building. The salvage value for the new building would be $3.25 million after its...
1. ABC is going to build a new manufacturing plant to serve five market regions. ABC...
1. ABC is going to build a new manufacturing plant to serve five market regions. ABC has four supply sources. The coordinates of location, the demand of each market region, maximum units from each supply source and the shipping cost from each supply source or to each market region are shown below. Supply Sources Shipping Cost ($/Ton Mile) Supply (Tons) X Coordinate Y Coordinate S1 1.5 180 450 820 S2 1 220 280 900 S3 2 140 600 400 S4...
A mechanical engineer must recommend a new heating system to a commercial building owner. The owner...
A mechanical engineer must recommend a new heating system to a commercial building owner. The owner intends to sell the building in 15 years. A gas fired furnace option has a design life of 5 years, an initial cost of $13,000, a replacement cost of $6,000 and annual operating costs of $3,500, but adds no value to the building when sold. A geothermal heat pump system has a design life of 10 years, an initial cost of $17,000, a replacement...