Design a PLC ladder logic program to implement an automatic Car-Wash process. The system should have a
start and stop pushbuttons. When a Car enters the washing skid, a load cell switch is activated and the
following sequence is performed automatically:
1. Soaping for (20) sec through soap nozzles
2. Washing for (120) sec using big brushes
3. Rinsing for (60) sec using water nozzles
4. Drying for (40) sec using air nozzles
After finishing this process, the washing skid is moved out through a conveyor belt (motor) until a stop limit
switch is activated.

Solutions

Expert Solution


Related Solutions

Design a PLC ladder logic program to control a stop light. The program should have 3...
Design a PLC ladder logic program to control a stop light. The program should have 3 outputs: RED, YELLOW, and GREEN. The ladder logic should illuminate green for 60 seconds, then yellow for 10 seconds, then red for 60 seconds. The system should also have two sensor inputs: THROUGH_TRAFFIC and CROSS_TRAFFIC which detect when there is through traffic and cross traffic present. If through traffic is detected, and no cross traffic is detected, the system should maintain a green light...
Automatic door plc ladder program
Automatic door plc ladder program
Design a system that shows a simplified automatic car wash system with the following operating conditions:...
Design a system that shows a simplified automatic car wash system with the following operating conditions: - Water level needs to be maintained at water level (> Lower limit and < Upper limit ) at all times to ensure the water pressure is sufficient for the wash cycle. - 2 Possible errors: - Water level exceeds upper limit or water level falls below lower limit - Car move away while washing process is ongoing - System shall stop if the...
Draw a PLC ladder logic diagram to simulate the operation of a sequential taillight system. The...
Draw a PLC ladder logic diagram to simulate the operation of a sequential taillight system. The light system consists of three separate lights on each side of the car. Each set of lights will be activated separately, by either the left or right turn signal switch. There is to be a 1-s delay between the activation of each light, and a 1-s period when all the lights are off. Ensure that when both switches are on, the system will not...
on plc program(PLC software) (Ladder diagram)basic program on paper is ok if it is drwan on...
on plc program(PLC software) (Ladder diagram)basic program on paper is ok if it is drwan on paper i just need an example to understand and do by myself detail answer is much appreciated thank you Write a short (no more than 2 page) paper on your process and ladder diagram • choose a simple manufacturing process (i.e. conveyor belt, garage door, filling operation, etc.) • process must have the following inputs • A safety factor (such as 2 pushbuttons or...
Stan's No Touch Car Wash is looking to implement a new ERP system. Lazlo Gali has...
Stan's No Touch Car Wash is looking to implement a new ERP system. Lazlo Gali has been charged with selecting one of 5 alternative approaches to the project. Complicating the analysis is the fact that each alternative will yield different results depending on which of the 4 economic scenarios occurs. Lazlo has studied each of the alternatives and scenarios and believes the table below accurately represents the potential outcomes. Each row represents a different approach to the project. Each column...
Car Rental Management System in C++ The aim of this project is to design and implement...
Car Rental Management System in C++ The aim of this project is to design and implement a computerized Car Rental Management System for a company called COEN244Cars. The company rents two types of cars: standard and luxury cars. A car is identified by a car identification number (int), a type (string), and a flag that indicates whether the car is currently available or not. The company distinguishes between three types of customers: regular customers, corporate customers, and VIPs (Very Important...
Write a PLC ladder program to describe an application consisting of keeping constant the level of...
Write a PLC ladder program to describe an application consisting of keeping constant the level of fluid in a fluid tank – if the level goes below a minimum, the fluid enters into the tank, and if the level goes above a maximum, inlet stops. Describe function of the program along with the inputs and outputs considered for the application?
Design and implement an interactive program named trip.c that collects information about the user's car and...
Design and implement an interactive program named trip.c that collects information about the user's car and planned travel, and reports back useful information. The dialog below shows exactly what data should be collected as input and reported as output. Some Hints to get started /* Not tested not complete code Just to get you started */ #include /* FUNCTION PROTOTYPES */ void WelcomeMessage(); void AskUserForInput(); /* ask and check whether user wants to continue if wants to continue gather information...
A full-service car wash has an automated exterior conveyor car wash system that does the initial...
A full-service car wash has an automated exterior conveyor car wash system that does the initial cleaning in a few minutes. However, once the car is through the system, car wash workers hand clean the inside and the outside of the car for approximately 15 to 25 additional minutes. There are enough workers to handle four cars at once during this stage. On a busy day with good weather, the car wash can handle up to 150 cars in a...