Question

In: Civil Engineering

A crest vertical curve begins with a 1.2% upgrade and ends with a 1.08% downgrade. The...

A crest vertical curve begins with a 1.2% upgrade and ends with a 1.08% downgrade. The PVC is at station 125+00 with an elevation of 711.10ft and the PVT is at station 131+30. The distance to the highest point is.............ft from the PVC.

Solutions

Expert Solution


Related Solutions

A series of vertical curves connect a 3% upgrade, a 2% downgrade, and another 3% upgrade...
A series of vertical curves connect a 3% upgrade, a 2% downgrade, and another 3% upgrade moving west to east. These curves are designed such that they connect directly to one another (i.e., the PVT of the first curve is the PVC of the second curve). If the design speed of the alignment is 60 mi/h, what is the elevation difference between the two road segments (i.e., the vertical difference between the PVC of the first curve and the PVT...
2) A 100-m curve is to connect a downgrade of 0.75% to an upgrade of 0.25%....
2) A 100-m curve is to connect a downgrade of 0.75% to an upgrade of 0.25%. If the level of the intersection point of the two grades is 150 m, calculate the necessary data for planning the curve ??
A downgrade of 5.0% meets an upgrade of 4.0%. This curve passes through the lowest point...
A downgrade of 5.0% meets an upgrade of 4.0%. This curve passes through the lowest point at 20 metres to the right of the intersection point 1. Find the length of the curve. 2. The reduced level at chainage 2450m, which is located on the downgrade, is 214.5m on the gradeline. The reduced level of the curve at the lowest point is 210m. Find the chainage at the lowest point. 3. Find the chainages and reduced levels of the two...
An equal-tangent crest vertical curve connects an initial grade of +2.5% and a final grade of...
An equal-tangent crest vertical curve connects an initial grade of +2.5% and a final grade of –0.5%. The curve is designed for 70 mi/h and the station of the PVT is 132+62 and is at elevation 833 ft. What is the station and elevation of the curve's high point?
An equal-tangent crest vertical curve is designed for 100 km/h. The initial grade is +3.4% and...
An equal-tangent crest vertical curve is designed for 100 km/h. The initial grade is +3.4% and the final grade is negative. Draw the curve. What is the elevation difference between the PVC and the high point of the curve?
In general the it is better to mine a tunnel upgrade (uphill) rather than downgrade because...
In general the it is better to mine a tunnel upgrade (uphill) rather than downgrade because the upgrade has (a) more favorable discontinuity orientation (b) water in tunnel will drain away from tunnel face (c) gravity better assists in mining tunnel face (d) downgrade from tunnel face speed up muck removal (e) all answers apply
What is spermiogenesis? Begins with what and ends with what?
What is spermiogenesis? Begins with what and ends with what?  What is spermatogenesis? How is it different from spermiogenesis?  What is the main difference between spermatogenesis and oogenesis?
A ladder is leaning against a vertical wall, and both ends of the ladder are at...
A ladder is leaning against a vertical wall, and both ends of the ladder are at the point of slipping. The coefficient of friction between the ladder and the horizontal surface is μ1 = 0.205 and the coefficient of friction between the ladder and the wall is μ2 = 0.153. Determine the maximum angle with the vertical the ladder can make without falling on the ground.
A ladder is leaning against a vertical wall, and both ends of the ladder are at...
A ladder is leaning against a vertical wall, and both ends of the ladder are at the point of slipping. The coefficient of friction between the ladder and the horizontal surface is ?1 = 0.215 and the coefficient of friction between the ladder and the wall is ?2 = 0.203. Determine the maximum angle with the vertical the ladder can make without falling on the ground.
JCPenny entered into a contract with Emma. The contract begins on May 1 and ends on...
JCPenny entered into a contract with Emma. The contract begins on May 1 and ends on November 31, 2020. JCpenny will exchange 100 of their most popular watches at a discount as well as 100 glasses for brand-specific marketing. The regular wholesale price of the shirts is $65. JcPenny expects the cost to produce each mask will be $6. All goods that they sell have a profit margin of about 54%. Being able to carry these exclusive products is important...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT