EyeGuard Equipment Inc. (EEI) manufactures protective eyewear for use in commercial and home applications. The product is also used by hunters, home woodworking hobbyists, and in other applications. The firm has two main product lines—the highest-quality product is called Safe-T, and a low-cost, value version is called Safe-V. Information on the factory conversion costs for EEI is as follows: Factory Costs Salaries $ 844,000 Supplies 144,000 Factory expense 544,000 $ 1,532,000 EEI uses ABC to determine the unit costs of its products. The firm uses resource consumption cost drivers based on rough estimates of the amount that each activity consumes, as shown below. EEI has four activities: job setup, assembly, inspecting and finishing, and packaging. Setup Assembly Inspecting and Finishing Packaging Total Salaries 15 % 55 % 20 % 10 % 100 % Supplies 20 60 20 100 Factory expense 80 20 100 The activity cost drivers for the two products are summarized below. Activities Activity Driver Setup Batch Assembly Units Inspect and finishing Finishing hours Packaging Packing hours Safe-V Safe-T Batches 190 540 Units 54,000 66,000 Finishing hours, per unit 0.20 0.30 Packaging hours, per unit 0.10 0.15 Materials per unit $ 3.50 $ 6 Required: 1. Determine the amount of the cost pool for each of the four activities. 2. Determine the activity-driver rates for assigning factory costs to the two products. 3. Determine the activity-based unit cost for each of the products.
Solution 1:
Determination of amount of cost pool for each of four activities | |||||||||
Particulars | Total Cost | Job Setup | Assembly | Inspecting and finishing | Packaging | ||||
% | Amount | % | Amount | % | Amount | % | Amount | ||
Salaries | $844,000.00 | 15% | $126,600.00 | 55% | $464,200.00 | 20% | $168,800.00 | 10% | $84,400.00 |
Supplies | $144,000.00 | 20% | $28,800.00 | 60% | $86,400.00 | 20% | $28,800.00 | 0% | $0.00 |
Factory Expense | $544,000.00 | 80% | $435,200.00 | 20% | $108,800.00 | 0% | $0.00 | 0% | $0.00 |
Total | $1,532,000.00 | $590,600.00 | $659,400.00 | $197,600.00 | $84,400.00 |
Solution 2:
Determination of activity rate for each activity | ||||
Activity | Estimated Overhead Cost | Activity Base | Usage of Activity Base | Activity Rate |
Job Setup | $590,600.00 | Nos of batches | 730 | $809.04 |
Assembly | $659,400.00 | Nos of units | 120000 | $5.50 |
Inspecting and finishing | $197,600.00 | Finishing hours | 30600 | $6.46 |
Packaging | $84,400.00 | Packing hours | 15300 | $5.52 |
Total | $1,532,000.00 |
Solution 3:
Computation of conversion cost assigned to product - Activity Based Costing | ||||||||
Activity | Cost | Cost Driver | Qty of cost driver | Allocation rate | Safe V | Safe T | ||
Allocation Qty | Allocated Overhead | Allocation Qty | Allocated Overhead | |||||
Job Setup | $590,600.00 | Nos of batches | 730 | $809.04 | 190 | $153,718 | 540 | $436,882 |
Assembly | $659,400.00 | Nos of units | 120000 | $5.50 | 54000 | $297,000 | 66000 | $363,000 |
Inspecting and finishing | $197,600.00 | Finishing hours | 30600 | $6.46 | 10800 | $69,768 | 19800 | $127,908 |
Packaging | $84,400.00 | Packing hours | 15300 | $5.52 | 5400 | $29,808 | 9900 | $54,648 |
Total | $1,532,000.00 | $550,294 | $982,438 |
Computation of activity based unit cost | ||
Particulars | Safe V | Safe T |
Material cost | $189,000 | $396,000 |
Conversion cost | $550,294 | $982,438 |
Total cost | $739,294 | $1,378,438 |
Nos of units | 54000 | 66000 |
Cost per unit | $13.69 | $20.89 |