In order to ensure adequacy of steady supplies at a site it is
very important to regularly check the work in progress and order in
advance regarding the material which is required at the site. For
example if a material is required at a project site and it usually
takes 5 days to completely utilize the product in the project then
as a responsible manager it is the responsibility of him to have a
detailed survey of the status of the the product used in the side
by making a physical visit at the. The product must be ordered well
in advance like in this case the product must be ordered well
before time maybe 3 days beforehand, so that even in the worst case
of delays the product must reach at the site as early as possible
and can match up with the delays.
In order to ensure adequacy of investigational product at site
there are two important factors which must be considered one factor
is that the investigational product must be manufactured by a
reputed and trusted brand, so that the product can be easily relied
upon it and the manufacturer does not make any changes with regard
to quality of the product and second important factor which must be
considered is that the product must be regularly check at the site
it must be in order to ensure its quality and the user of the
product randomly engages in testing the quality, so that any
chances of low quality product can be prevented.