Mountain Goat Cycles also makes saddle bags for its bicycles. There are two types, the Mountain bag and the Touring bag.
Mountain Touring
Selling price per unit $25 $30
Variable cost per unit $10 $18
Contribution Margin per unit $15 $12
Contribution Margin ratio 60% 40%
At Mountain Goat, the stitching machine is the constrained resource (or bottleneck). Additional information is as follows:
• The stitching machine has a capacity of 2400 minutes per week.
• The Mountain bag requires 1 minute of stitching time
• The Touring bag requires ½ minute of stitching time
• Current demand for the Mountain bag is 2000 units per week
• Current demand for the Touring bag is 2400 units per week.
Based on the above information, how many units of each bag should be produced to utilize the constrained resource to its fullest and get the most money for the company?
Struggling with the step process
ANSWER
Statement of contribution | |||
Mountain | Touring | ||
Selling Price | $ 25 | $ 30 | |
Less: Variable Cost | $ 10 | $ 18 | |
Contribution margin per Unit | $ 15 | $ 12 | |
Time taken to stich each unit | 1 min | 1/2 min | |
Contribution margin per minute | $ 15 | $ 24 | |
($15 / 1 min) | ($12/ 0.5 min) | ||
Ranking | II | I | |
Since contribution margin per minute of stitching machine time is more in case of touring bag, it would be produced first and than mountain bags should be produced with the remaining time to achieve maximum profit, | |||
Statement of product mix | |||
Number of Unit | Time Taken (min) | ||
Touring bags | 2,400 | 1,200 | |
Mountain bags | 1,200 | 1,200 | |
2,400 | |||
Therefore, 2,400 units of touring bags and 1,200 units of mountaining bags should be produced be produced to utilize the constrained resource to its fullest and get the most money for the company. | |||
Note: | |||
Per week | |||
Capacity per week | 2400 min | ||
Time taken to produce touring bags | 1200 min | (2400 units / 0.5 min) | |
Time left | 1200 min | ||
Units of mountain bags that can be produced with available time | 1200 | (1200 min / 1 min |
__________________________________