Question

In: Statistics and Probability

1A) The proportions of defective parts produced by two machines were compared, and the following data...

1A) The proportions of defective parts produced by two machines were compared, and the following data were collected. Determine a 90% confidence interval for p1 - p2. (Give your answers correct to three decimal places.)

Machine 1: n = 151; number of defective parts = 11
Machine 2: n = 153; number of defective parts = 8

Lower Limit -

Upper Limit -

1B) Find the value of t for the difference between two means based on an assumption of normality and this information about two samples. (Use sample 1 - sample 2. Give your answer correct to two decimal places.)

Sample Number Mean Std. Dev.
1 24 37.8 13.3
2 23 44 10.3

Solutions

Expert Solution

1) A)

1) b)

t = -1.78


Related Solutions

The proportions of defective parts produced by two machines were compared, and the following data were...
The proportions of defective parts produced by two machines were compared, and the following data were collected. Determine a 95% confidence interval for p1 - p2. (Give your answers correct to three decimal places.) Machine 1: n = 154; number of defective parts = 18 Machine 2: n = 142; number of defective parts = 6 Lower Limit Upper Limit
Production Lines: The data shows the number of defective parts produced by two machines when the...
Production Lines: The data shows the number of defective parts produced by two machines when the factory used two different alloys as the raw material. At .05 significance level comment on the main effects and the interaction effect. Alloy X Alloy Y Machine 1 22 11 18 12 12 9 22 11 25 6 19 14 16 8 22 14 19 11 14 9 23 3 24 12 21 10 24 10 24 8 22 8 15 8 22 12...
Of the parts produced by a particular machine, 1% are defective. If a random sample of...
Of the parts produced by a particular machine, 1% are defective. If a random sample of 8 parts produced by this machine contains 2 or more defective parts, the machine is shut down for repairs. Find the probability that the machine will be shut down for repairs based on this sampling plan.
Please answer both parts to Question 1. 1A. The following data were summarized from the accounting...
Please answer both parts to Question 1. 1A. The following data were summarized from the accounting records for Jersey Coast Construction Company for the year ended June 30, 20Y8: Cost of goods sold: Commercial Division $912,000 Residential Division 439,875 Administrative expenses: Commercial Division $149,400 Residential Division 129,575 Service department charges: Commercial Division $113,760 Residential Division 67,830 Sales: Commercial Division $1,364,500 Residential Division 750,060 Required: Prepare divisional income statements for Jersey Coast Construction Company. Refer to the Amount Descriptions list provided...
The percent defective for parts produced by a manufacturing process is targeted at 4%. The process...
The percent defective for parts produced by a manufacturing process is targeted at 4%. The process is monitored daily by taking samples of sizes n = 160 units. Suppose that today’s sample contains 14 defectives. Determine a 88% confidence interval for the proportion defective for the process today. Place your LOWER limit, rounded to 3 decimal places, in the first blank. For example, 0.123 would be a legitimate answer. Place your UPPER limit, rounded to 3 decimal places, in the...
Among 12 metal parts produced in a machine shop, 3 are defective. If a random sample...
Among 12 metal parts produced in a machine shop, 3 are defective. If a random sample of 5 of these metal parts is selected, find: (a) The probability that this sample will contain at least two defectives. (Do not round the intermediate answers. Round your answer to 4 decimal places.) (b) The probability that this sample will contain at most one defective. (Round your answer to 4 decimal places.)
The average costs for two types of advertising were compared using the following data. Ten weeks...
The average costs for two types of advertising were compared using the following data. Ten weeks of costs were recorded for each type of advertising. Use this information to answer the following questions. Advertising Type One Advertising Type Two n1=10 n2=10 x1 = $590 x2 = $575 s12 = $1,600 s22 = $2,400 14. What is the point estimate for the mean of the cost of Type One Advertising? 15. What is the estimated standard error for the point estimate...
In a company production line, the number of defective parts and their probabilities produced in an hour are shown in TABLE 1.
  In a company production line, the number of defective parts and their probabilities produced in an hour are shown in TABLE 1. Let x be the number of defective parts in an hour and K is P(X=K): TABLE 1 X 0 1 2 3 4 P(X = x) 0.2 0.3 K 0.15 0.1 How many defective parts are expected to be produced in an hour in the company’s production line?                                                                                Compute the standard deviation of the defective...
A spokesperson for the Mars Company stated that MM’s are produced in the following color proportions:...
A spokesperson for the Mars Company stated that MM’s are produced in the following color proportions: 15% Brown, 15% Yellow, 20% Blue, 15% Red, 20% Green, and 15% Orange. To test this claim a Math 15 class at SRJC randomly selected 928 MM’s. The results appear below. (These are actually the results we saw from the Handout 4 assignment last semester). Test the claim at MM color Number Expected Value Brown 144 Yellow 140 Blue 180 Red 129 Green 209...
5.         A spokesperson for the Mars Company stated that MM’s are produced in the following color proportions:...
5.         A spokesperson for the Mars Company stated that MM’s are produced in the following color proportions:             15% Brown, 15% Yellow, 20% Blue, 15% Red, 20% Green, and 15% Orange. To test this claim a Math 15             class at SRJC randomly selected 928 MM’s. The results appear below. (These are actually the results             we saw from the Handout 4 assignment last semester). Test the claim at a = 0.5  (2,2,3,3) MM color Number Expected Value Brown 144 Yellow 140 Blue 180 Red...