Question

In: Statistics and Probability

This information is for problems 7 – 14: Two economics professors decided to compare the variance...

This information is for problems 7 – 14:
Two economics professors decided to compare the variance of their grading procedures. To accomplish this, they each graded the same 10 exams with the following results:
                                                Mean Grade                      Standard Deviation
Professor Welker            83.6                                                        21.6
Professor Ackerman       79.7                                                        12.0
At the 0.01 level of significance, what is your conclusion?

a.

Reject the null hypothesis and conclude the variances are different.

b.

Fail to reject the null hypothesis and conclude the variances are different.

c.

Reject the null hypothesis and conclude the variances are the same.

d.

Fail to reject the null hypothesis and conclude the variances are the same.

e.

Determine the test results are inconclusive.

This information is for problems 7 – 14:
Two economics professors decided to compare the variance of their grading procedures. To accomplish this, they each graded the same 10 exams with the following results:
                                                Mean Grade                      Standard Deviation
Professor Welker            83.6                                                        21.6
Professor Ackerman       79.7                                                        12.0
At the 0.05 level of significance, what is your conclusion?

a.

Reject the null hypothesis and conclude the variances are different.

b.

Fail to reject the null hypothesis and conclude the variances are different.

c.

Reject the null hypothesis and conclude the variances are the same.

d.

Fail to reject the null hypothesis and conclude the variances are the same.

e.

Determine the test results are inconclusive.

Solutions

Expert Solution

Let us take the cases of hypothesis

If null hypothesis then H0:

If alternate hypothesis then Ha:  

Variance of sample A(professor welker) is given as

Variance of sample B (Professor acerman) is given as

Sample Size for both is given as =10

So n1 and n2 will be 10

Estimated population variance of sample A is given as

In similar manner Estimated population variance of sample B is given as

F ratio is ratio of estimated population variance of both

at

Here the degree of freedom =(n1-1),(n2-1)=(10-1),(10-1)=9,9

Value of F from table will be 5.12

Calculated value of F is less than table value of T=5.12

So null hypothesis is accepted

D option will be Correct option

Fail to reject the null hypothesis and variance are same


Related Solutions

Two accounting professors decided to compare the variance of their grading procedures. To accomplish this, they...
Two accounting professors decided to compare the variance of their grading procedures. To accomplish this, they each graded the same 10 exams, with the following results: Mean Grade Standard Deviation Professor 1 79.3 22.4 Professor 2 82.1 12.0 At the 2% level of significance, what is the decision? Multiple Choice : A. Reject the null hypothesis and conclude the variances are different. B. Fail to reject the null hypothesis and conclude the variances are different. C.Reject the null hypothesis and...
What is Macroeconomic and compare the two categories of economics Macroeconomic and Microeconomic
What is Macroeconomic and compare the two categories of economics Macroeconomic and Microeconomic
find the range variance and standard deviation for each of the two samples, then compare the...
find the range variance and standard deviation for each of the two samples, then compare the two set of test results. when investigating times required for drive theu servuce, the following reaults were obtained. restaurant a 120, 123, 153, 128, 124, 118, 154, 110 restaurant b : 115, 126 147, 156, 118, 110, 145, 137
Use the following information for Problems 10-14:  A company produces and sells a product with a monthly...
Use the following information for Problems 10-14:  A company produces and sells a product with a monthly demand estimated to be Q = 500 - 5P, where P is the selling price per unit in dollars. The fixed cost of production is $1,000 per month and the variable cost of production is $20 per unit. The profit-maximizing quantity is _______________. A. 155 B. 195 C. 200 D. 245 E. None of the above Use the following information for Problems 10-14:  A company...
The following data represent the production possibilities of two people in solving math and economics problems....
The following data represent the production possibilities of two people in solving math and economics problems. If they devote their total effort and time to math, A can solve 10 math problems and B can solve 8 math problems. If they devote their total effort and time to economics, A can solve 10 economics problems and B 12 economics problems. a) Assume that each will be self-sufficient and devote half their resources to math and half to economics. What is...
It is desired to compare the after-tax economics of two mutually exclusive alternatives with the following...
It is desired to compare the after-tax economics of two mutually exclusive alternatives with the following before-tax data for a study period (planning horizon) of 4 years:    Semiautomatic Machine                   Automatic Machine First cost                                            $100,000                                       $150,000 Useful life                                              4 years                                             5 years Market value at end of useful life             $0                                                     $0 Annual before-tax cash disbursements $50,000                                            $15,000 Annual cash revenues                           $110,000                                          $90,000 MARR (after tax) = 15% p.a. Study Period = 4 years Both alternatives are to be depreciated...
Answer questions 10-14 following this information. Mean -variance investor risk aversion (RA) level is 2. The...
Answer questions 10-14 following this information. Mean -variance investor risk aversion (RA) level is 2. The expected return and standard deviation of three assets classes are as bellow, Assets Class Expected Return Standard deviation of return A 10% 25% B 8% 15% C 6% 12% risk- free rate of return is 3% and the short fall level is 5% select the investors. (12) Risk adjusted rate of return (Expected utility) is, A. 7.98%, 5.97% and 9.94% B. 5.97%, 9.94% and...
Use the following information for the next 7 problems: A simple random sample of 40 recorded...
Use the following information for the next 7 problems: A simple random sample of 40 recorded speeds is obtained from cars traveling on a section of interstate 405 in Los Angeles. The sample has a mean of 68.4 miles per hour and a standard deviation of 5.7 miles per hour. We wish to test the hypothesis that the mean speed of cars on this stretch of road is higher than the posted speed limit of 65 miles per hour. Test...
Please use the following information for problems 6 and 7: The ABC Company has a division...
Please use the following information for problems 6 and 7: The ABC Company has a division that has the following income statement: Sales                               $5,000 Variable costs                  3,000                                         _____ Contribution Margin      2,000 Fixed Costs                      2,500                                          _____ Operating Income           -500 What is the effect of operating this division on the operating income of the ABC Company if $800 of the fixed costs will not be avoided if the company shuts down the division? Should the ABC Company shut down the...
7- CAPITAL BUDGETING CRITERIA A firm with a 14% WACC is evaluating two projects for this...
7- CAPITAL BUDGETING CRITERIA A firm with a 14% WACC is evaluating two projects for this year's capital budget. After-tax cash flows, including depreciation, are as follows: 0 1 2 3 4 5 Project M -$15,000 $5,000 $5,000 $5,000 $5,000 $5,000 Project N -$45,000 $14,000 $14,000 $14,000 $14,000 $14,000 Calculate NPV for each project. Round your answers to the nearest cent. Do not round your intermediate calculations. Project M    $ Project N    $ Calculate IRR for each project. Round your answers to...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT