Question

In: Statistics and Probability

The meantime between failures (in hours) for a company used is 420. after 15 new things...

The meantime between failures (in hours) for a company used is 420. after 15 new things were modified an attempt to improve reliability, tests we're conducted to measure the times between failures. the mean time for 15 new things is 442.2 and the standard deviation is 44. test the claim at the modified radios have a mean greater than 420 using a significance level of 0.025.

Solutions

Expert Solution

Ho :   µ =   420                  
Ha :   µ >   420       (Right tail test)          
                          
Level of Significance ,    α =    0.03                  
sample std dev ,    s =    44.0000                  
Sample Size ,   n =    15                  
Sample Mean,    x̅ =   442.2000                  
                          
degree of freedom=   DF=n-1=   14                  
                          
Standard Error , SE = s/√n =   44.0000   / √    15   =   11.3608      
t-test statistic= (x̅ - µ )/SE = (   442.200   -   420   ) /    11.3608   =   1.95
                             
                          
p-Value   =   0.0355   [Excel formula =t.dist(t-stat,df) ]             
Decision:   p-value>α, Do not reject null hypothesis                       
there is not enough evidence to say that modified radios have a mean greater than 420

............................


THANKS

revert back for doubt

please upvote


Related Solutions

Using a phone's battery to illustrate, explain how the meantime between failures can be used as...
Using a phone's battery to illustrate, explain how the meantime between failures can be used as a measure for a product's reliability
Bradford Electric Illuminating Company is studying the relationship between kilowatt-hours (thousands) used and the number of...
Bradford Electric Illuminating Company is studying the relationship between kilowatt-hours (thousands) used and the number of rooms in a private single-family residence. A random sample of 10 homes yielded the following. Number of Rooms Kilowatt-Hours (thousands) Number of Rooms Kilowatt-Hours (thousands) 12 9 8 6 9 7 10 8 14 10 10 10 6 5 5 4 10 8 7 7 Determine the 0.95 confidence interval, in thousands of kilowatt-hours, for the mean of all six-room homes. (Do not round...
the half-life Na-24 is 15 hours. How much of a 400.0g sample will remain after 75spli...
the half-life Na-24 is 15 hours. How much of a 400.0g sample will remain after 75spli hours?
A company plans to purchase a transformer that will be used 12 hours at full load...
A company plans to purchase a transformer that will be used 12 hours at full load and 12 hours with no load but still connected to the power supply at all times. The transformer has copper losses of 5 kW and core losses of 3.5 kW. Electricity costs $0.07/kW-hr. What is the total cost of transformer losses over a period of 1 year?
A company plans to purchase a transformer that will be used 12 hours at full load...
A company plans to purchase a transformer that will be used 12 hours at full load and 12 hours with no load but still connected to the power supply at all times. The transformer has copper losses of 5 kW and core losses of 3.5 kW. Electricity costs $0.07/kW-hr. What is the total cost of transformer losses over a period of 1 year?
Mosaic Company applies overhead using machine hours and reports the following information. Actual machine hours used...
Mosaic Company applies overhead using machine hours and reports the following information. Actual machine hours used (AH) 4,900 hours Standard machine hours (for actual production) (SH) 5,400 hours Actual variable overhead rate per hour (AVR) $ 4.55 Standard variable overhead rate per hour (SVR) $ 4.40 QS 23-18A Total variable overhead cost variance LO P5 Compute the total variable overhead cost variance and classify it as favorable, unfavorable or no variance. Compute the variable overhead spending variance and the variable...
A manufacturing company measured the productivity of its workers and found that: between the hours of...
A manufacturing company measured the productivity of its workers and found that: between the hours of 6am and 10am they could produce 30 pieces/hour/worker between 10am and 2pm they could produce 40 pieces/hour/worker between 2pm and 6pm they could produce 35 pieces/hour/worker. Write a function pieces_produced takes a number that represents a starting hour between 6am and 6pm, in twenty-four hour format (between 0 and 23), along with the number of workers and returns a number that represents the total...
Western Company allocates $10 overhead to products based on the number of machine hours used. The...
Western Company allocates $10 overhead to products based on the number of machine hours used. The company uses a plantwide overhead rate with machine hours as the allocation base. Given the amounts below, how many machine hours does the company expect in department 2? Estimated: Department 1 Department 2 Manufacturing overhead costs $ 263,000 $ 163,000 Direct labor hours 9,300 DLH 25,000 DLH Machine hours 16,300 MH ? MH Multiple Choice 35,600 MH 146,730 MH 87,830 MH 94,500 MH 26,300...
For both new and used vehicles that are acquired and placed in service after 12/31/17 and...
For both new and used vehicles that are acquired and placed in service after 12/31/17 and used over 50% for business, the TCJA has which of the following impacts? A) Dramatically increases the luxury auto depreciation limitations. B) Repeals the luxury auto depreciation limitations. C) Increase the maximim first year luxury auto depreciation limitation to $25,000. D) Eliminates any additional luxury auto depreciation allowance for fisrt year bonus depreciation.
The company used the machine for 5,000 hours and 6,000 hours during 2019 and 2020, respectively. The company also produced 45,000 and 64,000 units in both years, respectively.
Estimated service life     8 years           100,000 hours           900,000 units of output             Estimated residual value     P 80,000             The company used the machine for 5,000 hours and 6,000 hours during 2019 and 2020, respectively. The company also produced 45,000 and 64,000 units in both years, respectively.             1. Using the depreciation...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT