Question

In: Statistics and Probability

Given the data below, what is the upper control limit for the Moving Range control chart?...

Given the data below, what is the upper control limit for the Moving Range control chart? Please enter your answer with at least 4 significant digits.

Data:

Observation
132.4654
118.9743
124.6528
130.3063
144.1334
118.4584
135.1793
115.2477
138.6022
104.4394
128.8716
133.7959
113.2013
120.4394
142.4859
123.592
135.9269
123.5473
139.3181
138.444
135.2332
125.4248
123.4138
138.3623
120.3414
126.7968
126.2955
138.4302
133.506
115.1217
119.105
136.3829
142.9304
146.3562
115.0906
147.2637
143.7961
140.0805

Solutions

Expert Solution


Related Solutions

Upper Control Limit (UCLx). (3 marks) Lower Control Limit (LCLx). (3 marks) Upper Control Limit (UCLR).
Upper Control Limit (UCLx). Lower Control Limit (LCLx). Upper Control Limit (UCLR).
Given the following data, construct a three-sigma range control chart. Day of Sample Sample Values Saturday...
Given the following data, construct a three-sigma range control chart. Day of Sample Sample Values Saturday 22,19,20 Sunday 21,20,17 Monday 16,17,18 Tuesday 20,16,21 Wednesday 23,20,20 Thursday 19,16,21 a. If Friday's results are 15,14,21 is the process in control? b.Construct a three-sigma means control chart and determine if the process is still in control on Friday.
Given the data below, a lower specification of 78.2, and an upper specification of 98.9, what...
Given the data below, a lower specification of 78.2, and an upper specification of 98.9, what is the long term process performance (Ppk)? Data 101.4791 94.02297 95.41277 106.7218 90.35416 86.9332 94.87044 95.91265 93.98042 108.558 86.17921 85.01441 96.14778 92.59247 92.49536 87.4595 104.3463 90.57274 99.38992 80.61536 82.31772 97.05331 87.64293 103.3648 98.09292 87.72921 110.1765 86.76847 87.22422 94.88148 86.01183 91.43283 104.0907 97.77132 98.69138 95.55565 106.2402 95.96255 88.05735 100.2796 99.00995 86.18458 95.41366 99.32314 95.75733 88.82675 93.39986 98.34077 94.72198 99.14256 92.37767 94.94969 89.63531 87.56148 88.02731 97.57498...
Given the data below, a lower specification of 62.6, and an upper specification of 101.8, what...
Given the data below, a lower specification of 62.6, and an upper specification of 101.8, what is the long term process performance (ppk)? Data 66.06284 82.57716 78.64111 92.72893 76.18137 71.46201 76.24239 74.83622 69.87486 77.90479 82.39439 79.18856 84.34492 77.32829 80.50536 83.36017 97.34745 84.56226 87.95131 65.64412 70.73183 74.28879 89.07007 78.50745 77.51397 89.04946 73.75787 91.30598 87.12589 89.29855 81.398 86.52962 84.33249 80.48321 81.87089 83.54964 71.19464 80.02001 90.00112 82.29257 77.55125 88.07639 88.95467 83.92542 88.33509 84.36723 77.89679 82.38985 67.81415 80.68263 87.25767 81.1521 82.15546 72.52171 67.58353 86.11663...
Given the data provided below, calculate the control limits (X-bar and r-chart, Capability Index, create a...
Given the data provided below, calculate the control limits (X-bar and r-chart, Capability Index, create a control chart, and calculate the percentage of units that are expected to be out of spec (z-value). Please show all work for how all calculations were computed. Filling Line Checks - ounces Specification: 12 ounces min; max - 15 ounces Sample Sample Times Number 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 1 12.5 12.4 12.4 12.8 13 12.8 12.8 13 2 12.4 12.4...
Create a Control Limit chart for the following: You are a manager at RadioTag Inc., a...
Create a Control Limit chart for the following: You are a manager at RadioTag Inc., a maker of RFID tags for US military and private use (e.g., Wal Mart). Your process assembles radio id tags to certain specifications – 95.5 confidence intervals, however as they come off the assembly line a test is run on each tag to determine whether the frequency works or does not (hint the data are dichotomous distributed binary). Below are the data you collected over...
Consider a process under statistical quality control. The upper specification limit of the statistic of interest...
Consider a process under statistical quality control. The upper specification limit of the statistic of interest is 101, while the lower specification is 42. The sample plan is for 7 samples per period. The average range of the process is 13. What is the capability of the process assuming it is centered exactly between the specification limits and the statistic of interest has a normal distribution?
Write a program that will sum the integers between a given range (limit your range from...
Write a program that will sum the integers between a given range (limit your range from 0 to 50). For example, if the user want to add the integers between (and including) 1 and 10, then the program should add: 1 + 2 + 3 + 4 + 5 + 6 + 7 + 8 + 9 + 10 Algorithm: Program title/description Ask the user to input a start value in the range 0 to 50. Remember to create the...
Inter State Moving and Storage Company is setting up a control chart to monitor the proportion...
Inter State Moving and Storage Company is setting up a control chart to monitor the proportion of residential moves that result in written complaints due to late delivery, lost items, or damaged items. A sample of 60 moves is selected for each of the last 12 months. The number of written complaints in each sample is 8, 9, 3, 6, 1, 5, 10, 7, 7, 8, 8, and 10. 1. Insert the mean proportion defective, UCL, and LCL. (Round your...
Given the data set below, calculate the range, mean, variance, and standard deviation
Given the data set below, calculate the range, mean, variance, and standard deviation. 19,  33,  8,  29,  18,  5, 10, 14,  25 Range = Mean = Variance = Standard deviation =
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT