Question

In: Math

Inter State Moving and Storage Company is setting up a control chart to monitor the proportion...

Inter State Moving and Storage Company is setting up a control chart to monitor the proportion of residential moves that result in written complaints due to late delivery, lost items, or damaged items. A sample of 60 moves is selected for each of the last 12 months. The number of written complaints in each sample is 8, 9, 3, 6, 1, 5, 10, 7, 7, 8, 8, and 10.

1. Insert the mean proportion defective, UCL, and LCL. (Round your intermediate calculations and final answers to 2 decimal places.)

Mean proportion defective
UCL
LCL


2. Does it appear that the number of complaints is out of control for any of the months? Yes or No?

Thank you!

Solutions

Expert Solution


Related Solutions

Miller Inc. has decided to use a p-Chart with 3-sigma control limits to monitor the proportion...
Miller Inc. has decided to use a p-Chart with 3-sigma control limits to monitor the proportion of defective metal shafts produced by their production process. The quality control manager randomly samples 150 metal shafts at 14 successively selected time periods and counts the number of defective metal shafts in the sample. Step 1 of 8: What is the Center Line of the control chart? Round your answer to three decimal places. Step 2 of 8: What value of z should...
Suppose that a control chart is used to monitor ? ̅ where the control limits are...
Suppose that a control chart is used to monitor ? ̅ where the control limits are set to 3?? ̅ and the warning limits are set to 2?? ̅. Answer the following: (a) If the false alarm cost per occurrence is $1000. What is the expected false alarm cost every 100 samples. (b) If the warning inspection cost is $100. What is the expected warning inspection cost every 100 samples. (c) Suppose the current sample size of 10 is quadrupled,...
A security analyst is interested in setting up an IDS to monitor the company network. The...
A security analyst is interested in setting up an IDS to monitor the company network. The analyst has been told there can be no network downtime to implement the solution, but the IDS must capture all of the network traffic. Which of the following should be used for the IDS implementation? A. Network tap B. Honeypot C. Aggregation D. Port mirror
A control chart is used for a painting process to monitor the surface imperfections of a...
A control chart is used for a painting process to monitor the surface imperfections of a metal toaster oven cover. The inspection is on a random sampling basis with 10 covers forming a subgroup. The most recent 20 subgroups contained 180 imperfections. Please determine the control limits for the appropriate chart.
The J H group Manufacturing has decided to use a p-Chart to monitor the proportion of...
The J H group Manufacturing has decided to use a p-Chart to monitor the proportion of defective washers produced by their production process. The control limits on these charts will be designed to include 97% of the sample proportions when the process is In Control. The quality control manager randomly samples 300 washers at 14 successively selected time periods and counts the number of defective washers in the sample. Sample   Defects 1   13 2   11 3   8 4   10 5  ...
Given the data below, what is the upper control limit for the Moving Range control chart?...
Given the data below, what is the upper control limit for the Moving Range control chart? Please enter your answer with at least 4 significant digits. Data: Observation 132.4654 118.9743 124.6528 130.3063 144.1334 118.4584 135.1793 115.2477 138.6022 104.4394 128.8716 133.7959 113.2013 120.4394 142.4859 123.592 135.9269 123.5473 139.3181 138.444 135.2332 125.4248 123.4138 138.3623 120.3414 126.7968 126.2955 138.4302 133.506 115.1217 119.105 136.3829 142.9304 146.3562 115.0906 147.2637 143.7961 140.0805
What are the steps that manage care organization might follow in setting up a strategy monitor...
What are the steps that manage care organization might follow in setting up a strategy monitor in program? How might those steps and resulting program differ in a small physician group practice. What are the differences In strategic Monitoring programs at the cooperate level of the multi- SBU Cooperation And at the SBU level?
True or False: Please explain why A Hotelling's T2 control chart is used to monitor processes...
True or False: Please explain why A Hotelling's T2 control chart is used to monitor processes with short production runs
Consider the setting up of a p-chart with reference to the production of railway car side...
Consider the setting up of a p-chart with reference to the production of railway car side frames. Suppose that these frames are in continuous production in a foundry and that a random sample of 50 frames is taken from each day’s output and inspected. The results of 28 days of past operations are as follows: Date                Number Rejected                               Date                            Number Rejected Oct 1               4                                                          Oct 19                         4 Oct 2               9                                                          Oct 22                         3 Oct 3               10                                                        Oct 23                         11 Oct 4               11                                                        Oct 24                         8 Oct 5               13                                                        Oct 25                         14 Oct 8               30                                                        Oct 26                         21 Oct 9               26                                                        Oct 29                         25 Oct...
A boxed 15.0 kg computer monitor is dragged by friction 6.50 m up along the moving...
A boxed 15.0 kg computer monitor is dragged by friction 6.50 m up along the moving surface of a conveyor belt inclined at an angle of 36.8 ∘ above the horizontal. If the monitor's speed is a constant 3.00 cm/s , how much work is done on the monitor by friction, gravity, and the normal force of the conveyor belt? Wfriction = Wgravity = WN =
ADVERTISEMENT