Question

In: Statistics and Probability

Create a Control Limit chart for the following: You are a manager at RadioTag Inc., a...

Create a Control Limit chart for the following: You are a manager at RadioTag Inc., a maker of RFID tags for US military and private use (e.g., Wal Mart). Your process assembles radio id tags to certain specifications – 95.5 confidence intervals, however as they come off the assembly line a test is run on each tag to determine whether the frequency works or does not (hint the data are dichotomous distributed binary). Below are the data you collected over a 2-week period:                                                                                                                                                                                                                                                                                                                                                                GRAPH GOES UNDER THIS

Day sample size        non-working tags

1                      100                         15

2                      100                         13

3                      100                         12

4                      100                         11

5                      100                         16

6                      100                         19

7                      100                         5

8                      100                         8

9                      100                         19

10                   100                         15

11                   100                         2

12                   100                         6

13                   100                         9

14 100                         10

  1.         P bar =

SD of P bar =

UCLP Bar =

LCLP bar =

B) Graph and Plot the data. Round answers to three places.

Clearly identify the P bar, s.d. of Pbar, UCL, LCL (make sure the graph elements are labeled) and identified in A above.

C) Compare p value to a. What is the result?

Solutions

Expert Solution


Related Solutions

Given the data below, what is the upper control limit for the Moving Range control chart?...
Given the data below, what is the upper control limit for the Moving Range control chart? Please enter your answer with at least 4 significant digits. Data: Observation 132.4654 118.9743 124.6528 130.3063 144.1334 118.4584 135.1793 115.2477 138.6022 104.4394 128.8716 133.7959 113.2013 120.4394 142.4859 123.592 135.9269 123.5473 139.3181 138.444 135.2332 125.4248 123.4138 138.3623 120.3414 126.7968 126.2955 138.4302 133.506 115.1217 119.105 136.3829 142.9304 146.3562 115.0906 147.2637 143.7961 140.0805
A quality manager asked his team to implement p control chart for a process that was...
A quality manager asked his team to implement p control chart for a process that was recently introduced. The team collected samples of size n = 100 parts hourly over a period of 30 hours and determined the proportion of nonconforming parts for each sample. The mean proportion of nonconforming parts for 30 samples turned out to be 0.025. Determine the upper and lower control limits for the p chart. Discuss how you will use the p Chart and what...
Upper Control Limit (UCLx). (3 marks) Lower Control Limit (LCLx). (3 marks) Upper Control Limit (UCLR).
Upper Control Limit (UCLx). Lower Control Limit (LCLx). Upper Control Limit (UCLR).
Your lab manager asks you to create the new control range for the new lot of...
Your lab manager asks you to create the new control range for the new lot of hematology control level 1. The following 10 hemoglobin values are gathered to determine the control limits. Using a calculator or website SD function, calculate and record the mean, the standard deviation, and the 95% confidence interval for this set of values. (3 pts) 4.2, 4.7, 4.3, 4.4, 4.6, 4.7, 4.9, 5.0, 4.6, 4.0, Mean:____4.54______ 1 SD:__0.2963______ 95% Confidence range (2 SD range):_____1.96___________
Using the data shown, you will create two charts. The first chart is a bar chart...
Using the data shown, you will create two charts. The first chart is a bar chart that will display % growth in different job titles between 2010 and 2020Est. The second chart will be a pie chart showing the 2020Est. Jobs in different categories as a % of overall 2020Est. jobs. Computer-Related Jobs 2010 2020 Est. % Change Systems Analysts         544,400         664,800 Software App Developers         520,800         664,500 Programmers         363,100         406,800 Network/System Admins         347,200...
JAVA Exercise BasketBall Bar Chart Write a program that allows you to create a bar chart...
JAVA Exercise BasketBall Bar Chart Write a program that allows you to create a bar chart for the active members of a basketball team during a game. (Recall: there are only 5 active players on the court per team in a standard basketball game.) Your program should do the following tasks: • Prompt the user to store the first name of the five players • Prompt the user to enter the points scored by each player a. Use a while...
How do you think using a EWMA chart versus a Shewhart control chart would/would not work...
How do you think using a EWMA chart versus a Shewhart control chart would/would not work in maintenance line of work?
A process is in control and normally distributed with ? control chart limits of 45 and...
A process is in control and normally distributed with ? control chart limits of 45 and 15. The subgroup size is 4. Suppose the process variance suddenly triples while process mean remains unchanged. What is the probability that the first subsequent subgroup average will fall outside the control limits? What are the ? probability and ARL? Suppose the process variance suddenly triples while process mean shifts downward to 10. What are the β probability and ARL now?
Suppose that a control chart is used to monitor ? ̅ where the control limits are...
Suppose that a control chart is used to monitor ? ̅ where the control limits are set to 3?? ̅ and the warning limits are set to 2?? ̅. Answer the following: (a) If the false alarm cost per occurrence is $1000. What is the expected false alarm cost every 100 samples. (b) If the warning inspection cost is $100. What is the expected warning inspection cost every 100 samples. (c) Suppose the current sample size of 10 is quadrupled,...
Given the data provided below, calculate the control limits (X-bar and r-chart, Capability Index, create a...
Given the data provided below, calculate the control limits (X-bar and r-chart, Capability Index, create a control chart, and calculate the percentage of units that are expected to be out of spec (z-value). Please show all work for how all calculations were computed. Filling Line Checks - ounces Specification: 12 ounces min; max - 15 ounces Sample Sample Times Number 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 1 12.5 12.4 12.4 12.8 13 12.8 12.8 13 2 12.4 12.4...