Question

In: Computer Science

1.list different kinds of worker required to design, build and move in to a house 2.can...

1.list different kinds of worker required to design, build and move in to a house

2.can all these jobs be done by one person? why?

Solutions

Expert Solution

Answer:

House construction is a long process which involves many subprocesses in which each process is done by different workers and all these processes should be done in a sequence.

Answer 1. Following are the different kinds of worker required to design, build and move into house:

1. Architects and Architectural technologies: Architects design the structure, while architectural technologists ensure that the technical aspects of a design work.This involves a proper designing of a structure with size and measurement of each room by an architect.

2. House Service Engineer:  They ensure that the lighting, power, ventilation, heating, cooling and water systems work.They ensure that designs are put into practice correctly.They are the mechanical engineers.This includes plumbers to ensure fitting of taps and other piping inside a house, electricians to ensure electricity connectivity and proper insulated wiring inside house.

3. Civil Engineer: Civil and structural engineers tend to work either in an office on the technical aspects of designs or out on site making sure that the designs are implemented properly.

4. Landscape Architect: Aim to improve the quality of the environment by designing and managing the open spaces around us. They design and create public areas in towns, cities and the countryside.

5. Quantity surveyors: They are involved in working out either how much the design would cost to build in theory or how much the project is costing to build in reality.

6. Site Manager: Ensure things get done on a construction site. They make sure that the building work is finished on time, within budget and to a high standard, managing teams of workers.

7. Contractors: They build the project once the designs have been finalised. Professionals who work for contractors spend most of their time working out on site.

8. Consultant: which look after the pre-construction stages of a project on behalf of a client who wants something built. Professionals who work for consultants spend their time helping to plan and design the project.

Answer 2:

These jobs cannot be done by one person because there are number of processes in which each process need to have knowledge and experience.So, here we can say that everyone is not perfect in everything as the work done by architect cannot done by an electrician and work done by workers cannot be done by consultant.And house construction is a long and complex process where you need a team of workers and consultants which provides proper guidance related to everything which comes in the process of house construction.If you think that everything can be done by a one person only than it become a very long and bulky process and i should say that this cannot be possible.I mean how can only one person manage all the processes comes under house construction.So, this is the reason.

Hope this will be helpful for you good...................Thanks.


Related Solutions

1. Can you please describe the different kinds of joins used in SQL? 2. What SQL...
1. Can you please describe the different kinds of joins used in SQL? 2. What SQL syntax would you use to ensure you are not returning duplicates in your data sets? 3. What SQL syntax would you use to change data in a table if you had write access to the table? Having write access means the data manipulation would occur in the table being pulled from. 4. What SQL syntax would you use to change data in a table...
The estimated purchase price for the equipment required to move the operation in-house would be $750,000....
The estimated purchase price for the equipment required to move the operation in-house would be $750,000. Additional net working capital to support production (in the form of cash used in Inventory, AR net of AP) would be needed in the amount of $35,000 per year starting in year 0 and through all years of the project to support production as raw materials will be required in year o and all years to run the new equipment and produce components to...
The estimated purchase price for the equipment required to move the operation in-house would be $750,000....
The estimated purchase price for the equipment required to move the operation in-house would be $750,000. Additional networking capital to support production (in the form of cash used in Inventory, AR net of AP) would be needed in the amount of $35,000 per year starting in year 0 and through all years of the project to support production as raw materials will be required in year o and all years to run the new equipment and produce components to replace...
1. You plan to build a toy house with a tiny light bulb inside that can...
1. You plan to build a toy house with a tiny light bulb inside that can be lit with 1 amp of current, for your little brother to entertain him! You have two D-size (1.5 V each) batteries and two 6-ohm resistors. How can you arrange the resistors to get the desired current? A) resistors should be connected in parallel to each other and this combination in series with batteries B) resistors may be connected in series with each other...
In your own words, what is a committee? List the different kinds of committees and their...
In your own words, what is a committee? List the different kinds of committees and their purposes, specific to a health care setting
.1 List and explain the different means by which health promotion programs can be funded. 2....
.1 List and explain the different means by which health promotion programs can be funded. 2. What is a budget? What are the major components of a budget? 3. Identify what you see as the biggest ethical concern of health promotion programming; explain your choice.
Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes,...
Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes, claims, and disputes (Max 200 words).             
What are the 4 different kinds of mergers? List them and give a hypothetical example of...
What are the 4 different kinds of mergers? List them and give a hypothetical example of each?
You have been assigned to design an experiment to test the effect of 5 different kinds...
You have been assigned to design an experiment to test the effect of 5 different kinds of fertilizer on the yield of strawberries grown hydroponically (using water rather than soil). How many plants would you use in this study and why? (2 points) What would you do for a control and why ? (2 points) How would you assign plants between control and treatment groups and why would you do it that way ? (2 points) What would be your...
List and explain 2 things that move the DD curve to the right, and 2 things...
List and explain 2 things that move the DD curve to the right, and 2 things that move the DD curve to the left. Do the same for the AA curve, be sure to explain your reasoning with graphs.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT