In: Mechanical Engineering
QUESTION 1
Tick the option which correctly describes the units of
parameters defined in an operation sheet?
a. |
Cutting Speed (ft/min), Spindle Speed (rev/min), Feed (in/rev), Depth of Cut(in) |
|
b. |
Cutting Speed (in/min), Spindle Speed (rev/sec), Feed (mm/rev), Depth of Cut(in) |
|
c. |
Cutting Speed (ft/min), Spindle Speed (rev/min), Feed (in/rev), Depth of Cut(mm) |
|
d. |
Cutting Speed (ft/sec), Spindle Speed (rev/min), Feed (mm/rev), Depth of Cut(mm) |
10 points
QUESTION 2
What steps are necessary for Process Planning of a job shop?
a. |
Size of Components, Shape of components, Tolerances |
|
b. |
Material |
|
c. |
No. of pieces to be produced, Available machine tools, Material properties |
|
d. |
All of the above |
10 points
QUESTION 3
Which one of the characteristics does not define the work of a route sheet?
a. |
Lists all manufacturing operations & associated machine tools |
|
b. |
Describes every machining & assembly operation |
|
c. |
Specifies process sequence of a job |
|
d. |
Defines path of material |
10 points
QUESTION 4
Which of the statements holds true for a job shop?
a. |
Variety of products can be manufactured |
|
b. |
Workers need not require to not have high skill levels |
|
c. |
Large manufacturing lot sizes are avoided |
|
d. |
All of the above |
10 points
QUESTION 5
Which is one of the difficulty that Digital Simulation faces in absence of manufacturing system design?
a. |
Data is easy to secure, accurate & non-conflicting |
|
b. |
All system analyses are subject to errors of omission & commission |
|
c. |
Environment cannot change the system and vice versa |
|
d. |
Manufacturing system are simple, easy to define and has clear goals |
10 points
QUESTION 6
Which of these is a disadvantage of application of PLC in a flow shop?
a. |
Reprogrammable |
|
b. |
Machines are flexible |
|
c. |
Increased Construction time |
|
d. |
Relay panels are no more vulnerable to electronic noise |
10 points
QUESTION 7
In a manufacturing system, the critical control functions are
a. |
Inventory control, Production rate & mix control |
|
b. |
Quality control & Machine tool control |
|
c. |
Inventory Control, Machine tool control & Quality Control |
|
d. |
Both a & b |