Question

In: Mechanical Engineering

An FMS consists of three stations plus a load/unload station. Station 1 loads and unloads parts...

An FMS consists of three stations plus a load/unload station. Station 1 loads and unloads parts using two servers (material handling workers). Station 2 performs horizontal milling operations with two servers (identical CNC horizontal milling machines). Station 3 performs vertical milling operations with three servers (identical CNC vertical milling machines). Station 4 performs drilling operations with two servers (identical drill presses). The machines are connected by a part handling system that has two work carriers and a mean transport time = 3.5 min. The FMS produces four parts, A, B, C, and D, whose part mix fractions and process routings are presented in the table below. The operation frequency is fijk = 1.0 for all operations. Determine (a) maximum production rate of the FMS, (b) utilization of each machine in this system, and (c) average utilisation of the system U s .

Solutions

Expert Solution


Related Solutions

Three balanced 3-phase loads are connected in parallel. Load 1 is Y-connected with an impedance of...
Three balanced 3-phase loads are connected in parallel. Load 1 is Y-connected with an impedance of 400 + j300 ? per phase, load 2 is ?-connected with an impedance of 2400 – j1800 ? per phase, and load 3 is absorbing 172.8 + j2203.2 kVA. The loads are fed from a set of distribution lines with an impedance of 2 + j16 ? per line. The magnitude of the line-to-neutral voltage at the load end of the line is 24?3...
A closed loop overhead conveyor must be designed to deliver parts from a load station to...
A closed loop overhead conveyor must be designed to deliver parts from a load station to an unload station. The specified flow rate of parts between the two stations is 320 parts/hr. The conveyor has carriers spaced at a center-to-center distance that is to be determined. Each carrier holds one part. Forward and return loops are each 75 m. Conveyor speed is 0.6 m/s. Minimum feasible times to load and unload parts at the respective stations is 0.16 min for...
A car wash has two stations, 1 and 2. The service time at station 1 is...
A car wash has two stations, 1 and 2. The service time at station 1 is exponentially distributed with parameter λ1, and the service time at station 2 is exponentially distributed with parameter λ2.When a car arrives at the car wash, it begins service at station 1, provided station 1 is free; otherwise, the car waits until station 1 is available. Upon completing service at station 1, the car then proceeds to station 2, provided station 2 is free; otherwise,...
The three Primary failure modes for concrete dams are: 1-Stability under acting loads 2-Load-bearing capacity (due...
The three Primary failure modes for concrete dams are: 1-Stability under acting loads 2-Load-bearing capacity (due to e.g. degradation or cracks) 3-Water-tightness Describe these-give the reason for when and how each of them Will occur?
Consider a production line with five stations. Station 1 can produce a unit in 9 minutes....
Consider a production line with five stations. Station 1 can produce a unit in 9 minutes. Station 2 can produce a unit in 10 minutes. Station 3 has two identical machines, each of which can process a unit in 12 minutes (each unit only needs to be processed on one of the two machines. Station 4 can produce a unit in 5 minutes. Station 5 can produce a unit in 8 minutes. Which station is the bottleneck station? 
A space station consists of three modules, connected to form an equilateral triangle of side length...
A space station consists of three modules, connected to form an equilateral triangle of side length 82.0 m. Suppose 100 people, with an average mass of 75.0 kg each, live in each capsule and the mass of the modules is negligible compared to the mass of the people. If everyone went to the top left module for a parade what would be the change in position of (a) the center of mass of the station and (b) top left module,...
1. ​M2 consists of: a. ​M1 plus money market mutual funds only. b. ​M1 plus time...
1. ​M2 consists of: a. ​M1 plus money market mutual funds only. b. ​M1 plus time deposits only. c. ​only near-monies. d. ​coins, currency, and checkable deposits only. e. ​M1 plus savings accounts, small time deposits, money market mutual funds, and miscellaneous near-monies. 2. ​The demand for money in an economy is high when the: a. ​real GDP is low. b. ​price level is high. c. ​interest rate is high. d. ​personal tax rate is low. e. ​unemployment rate is...
1) . A factory load consists of the following : (i) an induction motor of 150...
1) . A factory load consists of the following : (i) an induction motor of 150 h.p. (111·9 kW) with 0·7 p.f. lagging and 80% efficiency ; (ii) a synchronous motor of 100 h.p. (74·6 kW) with 0·85 p.f. leading at 90% efficiency (iii) a lighting load of 50 kW. Find the annual electric charges if the tariff is Rs 100 per annum per kVA maximum demand plus 7 paise per kWh ; assuming the load to be steady throughout...
Three loads are connected in parallel to an AC supply of 120∠0° V. The loads are...
Three loads are connected in parallel to an AC supply of 120∠0° V. The loads are 40∠30° Ω, 50 - j30 Ω and 30 + j40 Ω. a) Draw the circuit diagram b) Determine the amplitude and phase angle of the supply current graphically by constructing a phasor diagram using a suitable scale of the load currents and source voltage. c) State the overall power factor using the answer from part (b). d) Construct another phasor diagram for the system...
There are a total of 10 test stations. When a circuit board fails, the test station...
There are a total of 10 test stations. When a circuit board fails, the test station will automatically record the lifetime for the failed board and then immediately switch to a replacement board. The test was stopped at 1200 hours. At that time, 19 circuit boards had failed and there was an operating circuit board in every station. Assuming the boards have exponentially-distributed lifetimes, estimate the mean lifetime for this type of board.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT