Question

In: Accounting

Value-Stream Average Costing, ABC Costs as Benchmarks A value stream has three activities and two products....

Value-Stream Average Costing, ABC Costs as Benchmarks A value stream has three activities and two products. The units produced and shipped per week are 50 of the deluxe model (Model A) and 150 of the basic model (Model B). The resource consumption patterns are shown as follows: Model A Model B Costs of Value- Stream Activities Cell manufacturing 2,400 min. 7,200 min. $ 76,800 Engineering 60 hrs. 260 hrs. 27,200 Testing 100 hrs. 220 hrs. 24,000 Total $ 128,000 Required: 1. Calculate the ABC product cost for Models A and B. Round your answers to the nearest cent if rounding is required. Product Cost Per Unit Model A $ per unit Model B $ per unit 2a. Calculate the value-stream average product cost. $ per unit 2b. Assuming reasonable stability in the consumption patterns of the products and product mix, assess how well the products are grouped based on similarity. The two value-stream products are similar Check My Work

Solutions

Expert Solution

1

Calculate the ABC product cost for Models A and B

First of all we need calculate activity rates as under

: Cell manufacturing:

Driver is conversion time (in minutes)

=$76,800/(2,400 + 7,200)

= $8 per minute

Engineering: Driver is engineering hours

=$27,200/(60 + 260)

= $85 per engineering hour

Testing: Driver is testing hours:

=$24,000/(100 + 220)

= $75 per test hour

Now calculate product costs as under

ModelA

Model-B

Cell

8x2400

19200

8x7200

57600

Engineering

85x60

5100

85x260

22100

Testing

75x100

7500

75x220

16500

Total

31800

96200

Devided by

Units

50

150

Unit cost (Cost/Units)

636

641.33

________________________________________________

2-a

Average cost

= $128,000/200

= $640

.

The average cost approximates the ABC costs with very little error, suggesting that the two value-stream products are quite similar. Alternatively, the ABC cost is about the same for each model, suggesting significant homogeneity and thus the correct specification of the value stream


Related Solutions

A value stream has three activities and two products. The units produced and shipped per week...
A value stream has three activities and two products. The units produced and shipped per week are 50 of the deluxe model (Model A) and 150 of the basic model (Model B). The resource consumption patterns are shown as follows: Model A Model B Costs of Value- Stream Activities Cell manufacturing 2,380 min. 7,140 min. $ 57,120 Engineering 65 hrs. 234 hrs. 26,013 Testing 95 hrs. 247 hrs. 27,360    Total $ 110,493 Required: 1. Calculate the ABC product cost for...
P17-1A Assign overhead using traditional costing and ABC; compute unit costs; classify activities as value- or...
P17-1A Assign overhead using traditional costing and ABC; compute unit costs; classify activities as value- or non-value-added Combat Fire, Inc. manufactures steel cylinders and nozzles for two models of fire extinguishers: (1) a home fire extinguisher and (2) a commercial fire extinguisher. The home model is a high-volume (54,000 units), half-gallon cylinder that holds 2 1/2 pounds of multi-purpose dry chemical at 480 PSI. The commercial model is a low-volume (10,200 units), two-gallon cylinder that holds 10 pounds of multi-purpose...
Wellington Chocolate Company uses activity-based costing (ABC). The controller identified two activities and their budgeted costs:...
Wellington Chocolate Company uses activity-based costing (ABC). The controller identified two activities and their budgeted costs: Setting up equipment $598,000 Other overheard $6,400,000 Setting up equipment is based on setup hours, and other overhead is based on oven hours. Wellington produces two products, Fudge and Cookies. Information on each product is as follows: Fudge Cookies Units produced 8,000 445,000 Setup hours 10,400 2,600 Oven hours 5,000 35,000 Required: Round your answers to the nearest whole dollar, unless otherwise directed. 1....
Value-Stream Product Costing, ABC, and DBC Brasher Company is transitioning to a lean manufacturing system and...
Value-Stream Product Costing, ABC, and DBC Brasher Company is transitioning to a lean manufacturing system and has just finalized two order fulfillment value streams. One of the value streams has two products, and the other has four products. The two-product value stream produces precision machine parts and the four-product value stream produces machine tools. Before moving to the value-stream structure, Brasher had a well-developed ABC system (one that used all duration drivers) and had experienced good success with the more...
Assume a company that uses activity-based costing (ABC) has only two products – A and B....
Assume a company that uses activity-based costing (ABC) has only two products – A and B. The company does not have any organization-sustaining activities or unused capacity costs. The company’s total manufacturing overhead cost of $56,000 has been allocated to the three activities shown below: Setups Machining Packing Orders Activity measure quantity: Product A 20 1,000 150 Activity measure quantity: Product B 20 ? 350 Overhead cost per activity cost pool ? ? $ 10,000 Activity rate    $ 150 per...
a company provides the following abc costing information: activities total costs activity cost drivers labor 384000...
a company provides the following abc costing information: activities total costs activity cost drivers labor 384000 8000 hours gas 36000 6000 gallons invoices 180000 total costs 600000 the above activities used by their three departments are : department 1 department 2 department 3 labor 2500 hours 1400 hours 4100 hours gas 1800 gallons 1000 gallons 3200 gallons invoices 1300 invoices 300 invoices 5900 invoices how much of invoice cost will be assigned to department 2?
Q1. Activity-based costing (ABC) is a costing methodology that identifies activities in an organization and assigns...
Q1. Activity-based costing (ABC) is a costing methodology that identifies activities in an organization and assigns the cost of each activity with resources to all products and services according to the actual consumption by each. Do you think Activity-Based Costing (ABC) has any advantages if so discuss few advantages and also the challenges of this system and how we can resolve it?        
Q1. Activity-based costing (ABC) is a costing methodology that identifies activities in an organization and assigns...
Q1. Activity-based costing (ABC) is a costing methodology that identifies activities in an organization and assigns the cost of each activity with resources to all products and services according to the actual consumption by each. Do you think Activity-Based Costing (ABC) has any advantages if so discuss few advantages and also the challenges of this system and how we can resolve it?         [2 Marks ] Q2. ALHAMAD Corporation uses process costing. A number of transactions that occurred in December...
ABC versus Traditional Costing Dodo Co. manufactures three products, A, B & C. Data for the...
ABC versus Traditional Costing Dodo Co. manufactures three products, A, B & C. Data for the period just ended is as follows: A B C Output (units) 20000 25000 2000 Sales price $20 $20 $20 Direct material $5 $10 $10 Direct Labour Hours per unit 2 hrs. 1 hr. 1 hr. Direct Labour Wages @ $5 /hour) $10 $5 $5 The following data on overhead costs incurred is now available:     Activities $ Machining 55000 Quality control & set ups 90000...
Trend Reporting for Non-Value-Added Costs Cicleta Manufacturing has four activities: receiving materials, assembly, expediting products, and...
Trend Reporting for Non-Value-Added Costs Cicleta Manufacturing has four activities: receiving materials, assembly, expediting products, and storing goods. Receiving and assembly are necessary activities; expediting and storing goods are unnecessary. The following data pertain to the four activities for the year ending 20x1 (actual price per unit of the activity driver is assumed to be equal to the standard price): Activity Activity Driver SQ AQ SP Receiving       Receiving orders 12,000     21,000     $21     Assembly       Labor hours 87,000     105,000     15     Expediting       Orders...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT