In: Operations Management
A producer of pottery is considering the addition of a new plant
to absorb the backlog of demand that now exists. The primary
location being considered will have the following cost structures
as shown in the table. The producer knows there is a big order or
order contract that will be awarded by the giant retail WalWal. The
producer is not certain as what capacity production is to produce.
It all depends on WalWal’s contract. The producer has also been
informed, the first batch of pottery is required to ship in a very
tight time frame from the first production run. The producer
decides to plan ahead and select the best production process to set
up for manufacturing.
Process 1 |
Process 2 |
Process 3 |
|
Ann. Fixed Cost $ |
7,017 |
9,035 |
14,251 |
variable cost $/unit |
1.05 |
0.78 |
0.63 |
The producer wants you to help them to identify at what range of
production Q (quantity) is Best to adopt Process
1, Process 2, and Process 3.
Note: To sepcify annual Q
range, use 1234 < Q <= 5678.
Questions:
a) The range of annual Q for which Process 1 is best to use
is:
b) The range of annual volume for which Process 2 is best to use
is:
c) The range of annual volume for which Process 3 is best to use
is:
Let the required quantity = N
Total cost = Fixed cost + Variable cost / unit x N
The range for which process 1 is best :
Total cost of process 1 < total cost of process 2
Or, 7017 + 1.05.N < 9035 + 0.78.N
Or, 1.05.N – 0.78.N < 9035 – 7017
Or, 0.27.N < 2018
Or, N < 2018/0.27 = 7474.07
Total cost for process 1 < Total cost for process 3
Or, 7017 + 1.05.N < 14251 + 0.63.N
Or, 0.42.N < 7234
Or, N < 17223.80
Taking into account both, it should be N < 7474.07 ( I.E. from 0 to 7474)
The range for which process 2 is best :
Total cost for process 2 < Total cost for process 1
9035 + 0.78.N < 7017 + 1.05N
Or, 1.05.N – 0.78.N > 9035 – 7017
Or, 0.27.N > 2018
Or, N > 7474.07
Total cost for process 2 < Total cost for process 3
9035 + 0.78.N < 14251 + 0.63.N
Or, 0.15.N < 5216
Or, N < 34773.33
Taking into account both , N will be in the range of 7475 and 34773
The range for which process 3 is best :
Total cost for process 3 < Total cost for process 1
Or, 14251.63 + 0.63.N < 7017 + 1.05.N
Or, 0.42.N > 7234.63
Or, N > 17225.30
Total cost for process 3 < Total cost for process 2
14251.63 + 0.63.N < 9035 + 0.78.N
Or, 0.15N > 5216.63
Or, N > 34777.53
Taking into account of both, N > 34773.33
ANSWER :
The range of annual Q for which process 1 is best to use : 0 to 7474
The range of annual Q for which process 2 is best to use :7475 to 34773
The range of annual Q for which process 3 is best to use :34774 and above