Question

In: Operations Management

Which of the following will increase the waiting time in a call center in which the...

Which of the following will increase the waiting time in a call center in which the incoming call gets assigned to the first available server?

A. Add more servers
B. Implement the shortest processing time first priority rule
C. Decrease the variability in servers
D. Increase the average service/processing time
E. Decrease the interarrival time
Both C and D
Both D and E
C, D, and E

Solutions

Expert Solution

The correct options are Increase the average service time and Decrease the inter-arrival time. Hence, the correct option is Both D and E.


Related Solutions

Scheduling Criteria Response Time Turn- Around Time Waiting Time Throughput CPU utilization Scenario: A call center...
Scheduling Criteria Response Time Turn- Around Time Waiting Time Throughput CPU utilization Scenario: A call center ( Several Systems are connected to a single printer through a network) Explain the scheduling criteria conflict that would occur in this scenario. Indicate factors that would impede or improve the overall utilization and performance.
You are waiting for a friend to call you and that the time you wait in...
You are waiting for a friend to call you and that the time you wait in minutes has an exponential distribution with parameter λ=0.1. (a) What is the expectation of your waiting time? (b) What is the probability that you will wait longer than 10 minutes? (c) What is the probability that you will wait less than 5 minutes? (d) Suppose that after 5 minutes you are still waiting for the call. What is the distribution of your additional waiting...
2. Suppose that you are waiting for a friend to call you and that the time...
2. Suppose that you are waiting for a friend to call you and that the time you wait in minutes has an exponential distribution with parameter λ = 0.1. (a) What is the expectation of your waiting time? (b) What is the probability that you will wait longer than 10 minutes? (c) What is the probability that you will wait less than 5 minutes? (d) Suppose that after 5 minutes you are still waiting for the call. What is the...
The amount of time that a truck spends in waiting at the distribution center for unloading...
The amount of time that a truck spends in waiting at the distribution center for unloading is a random variable with a mean of 30 minutes and a standard deviation of 20 minutes. Suppose that a random sample of 9 trucks is observed. Find the probability that the average waiting time of trucks is: (1) Less than 20 minutes (2) Between 20 and 40 minutes
Call Center Shift A Average Call Time Shift B Average Call Time Average Satisfaction Level Average...
Call Center Shift A Average Call Time Shift B Average Call Time Average Satisfaction Level Average Number of Employees 1 14 29 2 100 2 1 1 1 90 3 53 60 4 80 4 10 25 2 54 5 85 71 4 69 6 18 33 2 54 7 24 40 2 42 8 58 65 4 67 9 33 46 3 30 10 9 19 1 48 Use the z-score to determine which call centers, if any, should...
Give an example of a situation in which the waiting time cost is based on waiting...
Give an example of a situation in which the waiting time cost is based on waiting time in the queue. Give an example of a situation in which the waiting time cost is based on waiting time in the system. What are the components of the following systems–a barbershop and a carwash? Draw and explain the configuration of each. (Classify as follows: i.barbershop and ii. car wash.)
A critical dimension of the service quality of a call center is the wait time of...
A critical dimension of the service quality of a call center is the wait time of a caller to get to a sales representative. Periodically, random samples of three customer calls are measured for time. The results of the last four samples are in the following table: Sample Time (Sec) 1 495 501 498 2 512 508 504 3 505 497 501 4 496 503 492 Suppose that the standard deviation of the process distribution is 5.77. If the specifications...
The following jobs are waiting to be processed at Rick Solano's machine center. Solano's machine center...
The following jobs are waiting to be processed at Rick Solano's machine center. Solano's machine center has a relatively long backlog and sets a fresh schedule every 2 weeks, which does not disturb earlier schedules. Below are the jobs to be scheduled today, which is day 241(day 241 is a work day). Job names refer to names of clients and contract numbers. Compute all times based on initiating work on day 241. Job Date Job Received Due Date Duration (days)...
The following jobs are waiting to be processed at Rick? Solano's machine center.? Solano's machine center...
The following jobs are waiting to be processed at Rick? Solano's machine center.? Solano's machine center has a relatively long backlog and sets a fresh schedule every 2? weeks, which does not disturb earlier schedules. Below are the jobs to be scheduled? today, which is day 241 ?(day 241 is a work? day). Job names refer to names of clients and contract numbers. Compute all times based on initiating work on day 241. (Job) (Date Job Received) (Due Date Duration...
The following jobs are waiting to be processed at the same machine center. Jobs are logged...
The following jobs are waiting to be processed at the same machine center. Jobs are logged as they arrive: A 313 8 B 312 16 C 325 40 D 314 5 E 314 3 In what sequence would the jobs be ranked according to the following decision rules: (a) FCFS, (b) EDD, (c) SPT, and (d) LPT? Which decision is best and why? All dates are specified as manufacturing planning calendar days. Assume that all jobs arrive on day 275.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT