1. What is the purpose of the ring barrier
diagram?
Ans- The purpose of the ring barrier diagram is to separate
movements which are able to safely time simultaneously (ensures
that movements do not conflict). time simultaneously (ensures that
movements do not conflict). sequencing of the movements or
phases.
2. How is timing represented in a ring barrier diagram?
Timing can be represented in the reliability (theory)-based design (RBD) by the duration of the phases along the x-axis of the diagram.
3. Why use a ring barrier diagram instead of a conflict matrix to describe the sequencing of phases?
The conflict matrix shows compatible and conflicting movements or phases, but not sequencing of the movements or phases. This is the role of the ring barrier diagram.
4. What is the difference between a movement and a phase ?
A phase is the timing unit which controls one or more movements. A movement is a collection of users with a common direction.