Sitwell Corporation manufactures titanium and aluminum tennis racquets. Sitwell’s total overhead costs consist of assembly costs and inspection costs. The following information is available:
Cost Titanium Aluminum Total Cost
Assembly 500 mach. hours 500 mach. hours $45,000
Inspections 350 150 $75,000
2,100 labor hours 1,900 labor hours
Sitwell is considering switching from one overhead rate based on labor hours to activity-based costing.
Total overhead costs assigned to titanium racquets, using a single overhead rate, are
| Total overheads cost assigned to titanium racuets | = | $ 63,000 | |
| Workings: | |||
| Total Cost | |||
| Assembly | = | $ 45,000 | |
| Inspection | = | $ 75,000 | |
| Total Cost | = | $ 1,20,000 | |
| Total labour hours | |||
| Titanium | = | 2,100 | labour hours | 
| Aluminium | = | 1,900 | labour hours | 
| Total labour hours | = | 4,000 | labour hours | 
| Overhead Cost per labour hours | = | $1,20,000 / 4,000 labour hours | |
| = | $ 30 | ||
| Total overheads cost assigned to titanium racuets | = | 2,100 labour hours X $30 | |
| = | $ 63,000 | ||