Question

In: Accounting

Top Hand company makes a tote bag and uses a standard cost system. Each tote bag...

Top Hand company makes a tote bag and uses a standard cost system. Each tote bag should use 2 yards of material that costs $5.00 per yard. Stitching on each bag should take a half hour of labor time of line workers who are paid an average wage of $20 per hour. Last month 15,000 tote bags were produced.

Looking at the production records, you find that $144,000 was spent to purchase the 32,000 yards of material used in production. Stitchers worked 7,200 hours and were paid $158,400.

You have been asked to produce a production report.

Required: Be sure to label each variance as F – favorable or U – unfavorable.

1. What is the standard materials costs for a tote bag and what is the standard labor cost to produce a tote bag?

2. What were the total direct materials and direct labor variances?

3. Calculate the following variance breakdowns for last month’s production:

            Materials price variance

            Materials usage variance

            Labor price (rate) variance

            Labor usage (efficiency) variance

Solutions

Expert Solution

Answer to the above question is shown.


Related Solutions

Kansas Company uses a standard cost accounting system. In 2020, the company produced 27,700 units. Each...
Kansas Company uses a standard cost accounting system. In 2020, the company produced 27,700 units. Each unit took several pounds of direct materials and 1.6 standard hours of direct labor at a standard hourly rate of $12.00. Normal capacity was 50,400 direct labor hours. During the year, 131,500 pounds of raw materials were purchased at $0.93 per pound. All materials purchased were used during the year. If the materials quantity variance was $19,665 unfavorable, what was the standard materials quantity...
Kansas Company uses a standard cost accounting system. In 2017, the company produced 27,500 units. Each...
Kansas Company uses a standard cost accounting system. In 2017, the company produced 27,500 units. Each unit took several pounds of direct materials and 1.6 standard hours of direct labor at a standard hourly rate of $11.00. Normal capacity was 49,500 direct labor hours. During the year, 130,000 pounds of raw materials were purchased at $0.90 per pound. All materials purchased were used during the year. (a)                 If the materials price variance was $1,300 favorable, what was the standard...
Wallis Company manufactures only one product and uses a standard cost system. The company uses a...
Wallis Company manufactures only one product and uses a standard cost system. The company uses a predetermined plantwide overhead rate that relies on direct labor-hours as the allocation base. All of the company's manufacturing overhead costs are fixed—it does not incur any variable manufacturing overhead costs. The predetermined overhead rate is based on a cost formula that estimated $2,892,000 of fixed manufacturing overhead for an estimated allocation base of 289,200 direct labor-hours. Wallis does not maintain any beginning or ending...
Phoenix Company manufactures only one product and uses a standard cost system. The company uses a...
Phoenix Company manufactures only one product and uses a standard cost system. The company uses a plantwide predetermined overhead rate that relies on direct labor-hours as the allocation base. The predetermined overhead rate is based on a cost formula that estimated $2,887,200 of fixed and variable manufacturing overhead for an estimated allocation base of 240,600 direct labor-hours. Phoenix does not maintain any beginning or ending work in process inventory. The company’s beginning balance sheet is as follows: Phoenix Company Balance...
Wallis Company manufactures only one product and uses a standard cost system. The company uses a...
Wallis Company manufactures only one product and uses a standard cost system. The company uses a predetermined plantwide overhead rate that relies on direct labor-hours as the allocation base. All of the company's manufacturing overhead costs are fixed—it does not incur any variable manufacturing overhead costs. The predetermined overhead rate is based on a cost formula that estimated $2,886,000 of fixed manufacturing overhead for an estimated allocation base of 288,600 direct labor-hours. Wallis does not maintain any beginning or ending...
The following is information related to X Company, a company that uses a standard cost system:...
The following is information related to X Company, a company that uses a standard cost system: Standard cost card for 1 unit of Product A: Direct materials – Raw Material A   (1 kilogram @ $ 20/kg.)           $ 20 Direct materials – Raw Material B   (1 kilogram @$ 10/kg.)         $ 10 Direct labour       (1 hour @ $15/hr.)                                 $ 15 Variable overhead       (1 hour @ $ 5/hr.)                                  $   5 Fixed overhead    (1 hour @ $ 10/hr.)                                       $ 10 Total budgeted fixed...
The following is information related to X Company, a company that uses a standard cost system:...
The following is information related to X Company, a company that uses a standard cost system: Standard cost card for 1 unit of Product A: Direct materials – Raw Material A   (1 kilogram @ $ 20/kg.)           $ 20 Direct materials – Raw Material B   (1 kilogram @$ 10/kg.)         $ 10 Direct labour       (1 hour @ $15/hr.)                                 $ 15 Variable overhead       (1 hour @ $ 5/hr.)                                  $   5 Fixed overhead    (1 hour @ $ 10/hr.)                                       $ 10 Total budgeted fixed...
West Manufacturing Company uses a standard cost system in its accounting records. The standard costs for...
West Manufacturing Company uses a standard cost system in its accounting records. The standard costs for its one product are as follows:                      Materials                                    8 pounds at $1.00 =   $ 8.00                      Direct labor                              1.2 hours at $14.00 =     16.80                      Variable overhead     1.2 direct-labor hours at $4.00 =       4.80                      Fixed overhead         1.2 direct-labor hours at $6.00 =       7.20                      Total standard cost                                                      $36.80             The standard costs per unit are based on normal capacity of 3,600 direct-labor...
Griffen Company makes pipe using metal. The company uses a standard costing system. Variable overhead is...
Griffen Company makes pipe using metal. The company uses a standard costing system. Variable overhead is allocated on the basis of direct material usage (pounds). Overhead is allocated to units based on expected production of 12,000 units. Griffen maintains a materials inventory, so the amount of material used is not necessarily the same as the amount of material purchased in any one month. The standard cost sheet for a unit of pipe follows. Direct material 6 pounds @ $ 5...
The Rogers Company uses a standard cost accounting system and estimates production for the year to...
The Rogers Company uses a standard cost accounting system and estimates production for the year to be 60,000 units. At this volume, the company's variable overhead costs are $0.50 per direct labor hour. The company's single product has a standard cost of $30.00 per unit. Included in the $30.00 is $13.20 for direct materials (3 yards) and $12.00 of direct labor (2 hours). Production information for the month of March follows: Number of units produced 6,000 Materials purchased (18,500 yards)...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT