Question

In: Mechanical Engineering

Planning is underway for a new hydroelectric power plant, and you have been asked to provide...

Planning is underway for a new hydroelectric power plant, and you have been asked to provide an engineering opinion on the best site for the power plant to be located. Two main sites have been identified for the plant. Site 1 is located at the base of a dam wall, with the waterline located 70 m above the turbine. The location has good accessibility for the construction crew, meaning that they are able to bring in a state-of-the-art turbine-generator system. The overall efficiency of the system is 85%, while the efficiency of the turbine alone is 92%. The geology of the area means that a 1.4 m diameter feedpipe can be installed, through which water can be supplied to the turbine at an average velocity of 6 m/s. Site 2 is also located at the base of a dam wall, with the waterline located 100 m above the turbine. Accessibility to this site is not as good as for Site 1, and as such there are restrictions on the type of turbine-generator system that can be installed. While it will be possible to use the same generator as would be used at Site 1, an alternative turbine is required. The identified turbine has an efficiency of 89%. Additionally, because of the more complex geology, a narrower feed pipe can be drilled (diameter = 0.8 m), through which water is supplied at a higher average velocity of 13 m/s. A further consideration is that the cost of distributing power from the two sites is slightly different. Power can be distributed from site 1 at a cost of $0.053/kWh, while the cost of distribution from site 2 is slightly lower at $0.051/kWh. To be competitive in the market, the company intends to retail its hydroelectric power for $0.10/kWh Provide an engineering opinion (of no more than six sentences) as to which site is superior for locating the hydroelectric plant. Your opinion should cover: • Any relevant assumptions you have made • Any thermodynamic considerations (relevant energy balances, etc.) • The power available from each site • The amount of power generated by the proposed plants • The profitability of the proposed plants • Advice as to which site is better for situating the power plant and why

Solutions

Expert Solution


Related Solutions

As the new accountant for Cohen & Co., you have been asked to provide a succinct...
As the new accountant for Cohen & Co., you have been asked to provide a succinct analysis of financial performance for the year just ended. You obtain the following information that pertains to the company’s sole product: Actual Master (Static) Budget Units sold 35,000 40,000 Sales $ 384,000 $ 470,000 Variable costs 214,000 278,000 Fixed costs 137,000 135,000 Required: 1. What was the actual operating income for the period? 2. What was the company’s master (static) budget operating income for...
As the new accountant for Cohen & Co., you have been asked to provide a succinct...
As the new accountant for Cohen & Co., you have been asked to provide a succinct analysis of financial performance for the year just ended. You obtain the following information that pertains to the company’s sole product: Master (Static Actual Budget Units sold 35,000 40,000 Sales $390,000 $375,000 Variable costs $220,000 $220,000 Fixed costs $153,125 $145,000 Required: 1. What was the actual operating income for the period? 2. What was the company’s master budget operating income for the period? 3....
As the new accountant for Cohen & Co., you have been asked to provide a succinct...
As the new accountant for Cohen & Co., you have been asked to provide a succinct analysis of financial performance for the year just ended. You obtain the following information that pertains to the company’s sole product: Actual Master (Static) Budget Units sold 35,000 40,000 Sales $ 394,000 $ 460,000 Variable costs 224,000 272,000 Fixed costs 142,500 137,000 QUESTIONS: 1. What was the actual operating income for the period? 2. What was the company’s master (static) budget operating income for...
You are trying to build the small scale hydroelectric power plant on the hill. Potential energy...
You are trying to build the small scale hydroelectric power plant on the hill. Potential energy is the main energy that you can use to generate the electricity. How much of the water (in kg) should be in the source to provide the 7 kW of power to the house? Assume that the efficiency of the electricity generator is 0.7 and g=9.8 m/s2 .
The U.S. Department of Interior is planning to build a dam and construct a hydroelectric power...
The U.S. Department of Interior is planning to build a dam and construct a hydroelectric power plant. In addition to producing electric power, this project will provide flood control, irrigation, and recreational benefits. The estimated benefits and costs expected to be derived from the three alternatives under consideration are listed as follows: Design 1 - Initial invesment = $198 million - Annual recurring benefits = $37 million - Annual recurring costs = $15 million Design 2 - Initial investment =...
            The Fukushima Power plant is planning construction of a new plant to generate electricity four...
            The Fukushima Power plant is planning construction of a new plant to generate electricity four years hence and must decide now between a small, medium, or large-sized plant. The exact size needed is uncertain because future demands can only be estimated. Forecasters have estimated future demands and their likelihoods as follows: Level of Demand Probability High 0.30 Medium 0.55 Low 0.15 In the following, all the future costs and earnings have been adjusted to their present worth: If a...
The ...Northwest ...Division of ...Kebalo Electric.. produces ..hydroelectric ...power. The power plant has seven machines that...
The ...Northwest ...Division of ...Kebalo Electric.. produces ..hydroelectric ...power. The power plant has seven machines that can harvest hydroelectric power on a continuous process such that the capacity of the plant is 5,000 machine hours per month. The plant produces three types of electric power. Energy type "Standard" is not easily stored, energy type "Super" is easier to store and send to more remote regions, and energy type "Bad" has no external market. However, energy type "Bad" is easily transferred...
** Principles of Sustainability** Hydroelectric dams provide clean power compared to coal-fired power plants, Do you...
** Principles of Sustainability** Hydroelectric dams provide clean power compared to coal-fired power plants, Do you think the advantage is worth the related environmental and social costs? why or why not?
A power plant is planning construction of a new plant to generate electricity four years hence...
A power plant is planning construction of a new plant to generate electricity four years hence and must decide now between a small, medium, or large-sized plant. The exact size needed is uncertain because future demands can only be estimated. Forecasters have estimated future demands and their likelihoods as follows: Level of Demand Probability High 0.30 Medium 0.55 Low 0.15             In the following, all the future costs and earnings have been adjusted to their present worth: The capacity of...
You are an IT Consultant at FinTechCo and have been asked to provide advice to the...
You are an IT Consultant at FinTechCo and have been asked to provide advice to the Senior Leadership Team to improve the current recruitment strategies. All candidates should satisfy the following three criteria to be considered for a position at FinTechCo: 1. Professional qualifications (P) 2. Industry Experience (E) 3. Leadership qualities (L) FinTechCo has a total of 45 employees. A recent mandatory employee survey revealed: 11 staff have Professional qualifications, the necessary industry Experience and Leadership qualities (i.e. satisfy...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT