Question

In: Physics

A project manager decided to use critical ratio (C/Rij for WP j of project i) to...

A project manager decided to use critical ratio (C/Rij for WP j of project i) to prioritize and schedule the remaining work packages to be done for three concurrent projects with the data in the table below. The technical sequence (precedence) are WP1>WP2>WP4>WP4, for each of the three projects. For an illustration, the first project is due by day 4. Its first work package requires 2 days at workstation 1.

Project

ID

Due

Date

Processing

time for WP1

Processing

time for WP2

Processing

time for WP3

Processing

time for WP4

1 4 2 (WS1) 1 (WS2)
2 5 1 (WS1) 1 (WS4) 2 (WS2)
3 10 2 (WS3) 2 (WS1) 2 (WS2) 1 (WS4)

Please do/answer the following:

a. Calculate the critical ratio for each work package

b. Sequence them by their critical ratio in their descending order

c. Identify the most critical work package

d. Identify the least critical work package

e. Schedule them on a Gantt chart

f. Identify the completion time expected for each project

g. Identify each project expected to be late, based on the schedule

h. Identify the make span for the entire set of three projects

Solutions

Expert Solution



Related Solutions

ou are the project manager on a project that is critical to the ongoing success of...
ou are the project manager on a project that is critical to the ongoing success of ABC Co. While repairing the laptop being used by one of the key members of your project team, a technician has found a few files and a very large folder that has been encrypted. The files include: (i) what might be illegal photographs of a person who appears to be a teenager; and (ii) a pirated video game. The technician has not tried to...
Create a C++ project in visual studio. You can use the C++ project that I uploaded...
Create a C++ project in visual studio. You can use the C++ project that I uploaded to complete this project. 1. Write a function that will accept two integer matrices A and B by reference parameters, and two integers i and j as a value parameter. The function will return an integer m, which is the (i,j)-th coefficient of matrix denoted by A*B (multiplication of A and B). For example, if M = A*B, the function will return m, which...
I am struggling with c++ and I could use some guidance getting through this project. Below...
I am struggling with c++ and I could use some guidance getting through this project. Below are my directions. The objective of this project is to be able to incorporate structures in a program. The program will have the user enter the information for two movies (details below) and then display a list of recommended movies that have 4 or more stars. 1. You will need to create a structure named MovieInfo that contains the following information about a movie:...
What are the critical success factors for a project manager? What skills should project managers have...
What are the critical success factors for a project manager? What skills should project managers have to be successful in this job?
The J H group Manufacturing has decided to use a p-Chart to monitor the proportion of...
The J H group Manufacturing has decided to use a p-Chart to monitor the proportion of defective washers produced by their production process. The control limits on these charts will be designed to include 97% of the sample proportions when the process is In Control. The quality control manager randomly samples 300 washers at 14 successively selected time periods and counts the number of defective washers in the sample. Sample   Defects 1   13 2   11 3   8 4   10 5  ...
You have been appointed project manager for a company critical project. After a detailed WBS analysis...
You have been appointed project manager for a company critical project. After a detailed WBS analysis you have identified 15 key activities that make up the project. The following table details for each activity its duration and its preceding activities. Activity Preceding Activity Duration Days A - 8 B - 6 C A 5 D A 9 E B 5 F B 12 G D,E 4 H C 5 I H 12 J G,F 7 K J 10 L J...
As the Data Manager (DM) on the “TES-100” project, the CEO has decided to proceed with...
As the Data Manager (DM) on the “TES-100” project, the CEO has decided to proceed with the study and wants you to consider using the new savvy company system of remote data entry/electronic data capture. Review the current literature (i.e. internet) regarding this topic and decide if this study would be RDE/EDC appropriate, then write a 2-3 page paper or 20-25 slides on why you have made the decision you have made including pros and cons.
Compile the following C code to MIPS assembly. a. Assume that i and j are stored...
Compile the following C code to MIPS assembly. a. Assume that i and j are stored in register $s1 and $s2, respectively. i = i – 2 + j; b. Assume base address of Array B and the variable i are stored in registers $s3 and $s1, respectively. B[1] = (B[0] x 4) - I; Explain each step in detail! my professor has the following answer: 1) addi $t0, $s1, -2 add $s1, $$t0, $s2 2) lw $t0, 0 ($s3)...
What special characteristics should a recovery project manager possess? Which of these is more critical for...
What special characteristics should a recovery project manager possess? Which of these is more critical for the role of recovery project manager vs. project manager and why? Answer with 250 words.
I need critical log on real estate project, means survey about real estate project.
I need critical log on real estate project, means survey about real estate project.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT