Question

In: Mechanical Engineering

A machine is out of order for major work. Define controls exercised in Maintenance Department required...

A machine is out of order for major work. Define controls
exercised in Maintenance Department required for its Maintenance.

Solutions

Expert Solution

ANS -

This is the case of Breakdown Maintenance

What is breakdown maintenance?

Breakdown maintenance is maintenance performed on a piece of equipment that has broken down, faulted, or otherwise cannot be operated. The goal of breakdown maintenance is to fix something that has malfunctioned. To the contrary, preventive maintenance is performed in order to keep something running.

Sometimes breakdown maintenance is performed because of an unplanned event. For example, if a critical piece of machinery breaks, the maintenance is performed because of the imminent need for that machine to operate again. However, breakdown maintenance can be planned for in advance, which is what we might call “good” breakdown maintenance.

Two types of Breakdown Maintenance

1) Planned Breakdown Maintenance

2) Unplanned Breakdown Maintenance

So given case again comes under Unplanned Breakdown Maintenance

Breakdown Maintenance Planning Tips

1. Prioritize your preventive maintenance tasks

2. Analyze your historical work orders.

3. Prioritize equipment based on weather delays in fixing them are acceptable.

4. Use historical data to identify equipment that breaks down frequently.

5. Use historical data to find the most common equipment failures.

6. Improve spare parts availability.

7. Review manufacturer recommendations regularly.

Some Advantages are

  • Minimizes maintenance cost by cutting out unnecessary preventive maintenance
  • Lowers cost of replacing disposable items frequently (light bulbs, tools, fuses)
  • Downtime for repairs is consolidated
  • Low staffing needs
  • Simple and easy to understand when maintenance is required

Disadvantages

  • Form of waste in a manufacturing environment
  • Safety issues can occur with unplanned failures
  • Can be costly depending on parts that fail
  • Requires careful planning and execution
  • Can be difficult to pinpoint source of issues

Related Solutions

A machine is out of order for minor work. Define controls exercised in maintenance. Department required...
A machine is out of order for minor work. Define controls exercised in maintenance. Department required for its maintenance.
managing a work order backlog is not the most exciting of maintenance task but without a...
managing a work order backlog is not the most exciting of maintenance task but without a complete and up-to date backlog. important work will be forgotten indeed, good backlog management is a perequisite for effective planning and scheduling. discuss an optimum size for non-shutdown work order backlog for a typical 24/7 continuous -process operation and includes if a backlog too small and if the backlog too large
If 181100 units are transferred out of a department, there was no beginning work in process,...
If 181100 units are transferred out of a department, there was no beginning work in process, and there are 29300 units still in process at the end of a period, the number of units that were started into production during the period is 151800. 29300. 181100. 210400.
15. If 179800 units are transferred out of a department, there was no beginning work in...
15. If 179800 units are transferred out of a department, there was no beginning work in process, and there are 30800 units still in process at the end of a period, the number of units that were started into production during the period is 30800. 210600. 179800. 1. The Assembly Department shows the following information: Units Beginning Work in Process 20800 Ending Work in Process 65300 Units Transferred Out 30200 How many total units are to be accounted for by...
Tunnel needs major maintenance work that is anticipated every 12 years at cost of 6000 per...
Tunnel needs major maintenance work that is anticipated every 12 years at cost of 6000 per occurrence. if tunnel has expected life of 120 years, what is its economic equivalent annual cost with interest rate of 9%?
In order to improve evacuation routes out of New Orleans in the event of another major...
In order to improve evacuation routes out of New Orleans in the event of another major disaster such as Hurricane Katrina, the Louisiana Department of Transportation (L-DoT) is planning to construct an additional bridge across the Mississippi River.  The department uses an interest rate of 8% and plans a 50-year life for either bridge.  Which design has the better present worth? All costs in $M Bridge M Bridge L Land acquisition $220 $195 Annual O & M 2 3 Annual increase 0.04...
In order to take out a loan, you are required to put up some type of...
In order to take out a loan, you are required to put up some type of collateral. You decide to offer 1,000 shares of your ZG Corp. stock which is valued at $100 per share. You are concerned that the stock price will increase to $125 before you repay the loan and the lender will sell your shares of stock for a profit. How could you manage this risk using a financial derivative? (Would you purchase a put or call...
You work at a toy company. You talk to the accounting department and figure out that...
You work at a toy company. You talk to the accounting department and figure out that the fixed operating cost is roughly $50,000 a month. As an engineer, you also calculate that it cost roughly $40 per unit of output. You then notice that due to supply and demand that the selling price per unit is about p = $200-1.6D. Determine the optimal volume for this product and what are the breakeven point(s)?
You are required to carry out the computer networking of five (5) work stations. With the...
You are required to carry out the computer networking of five (5) work stations. With the aid of a well labelled, neat diagram, show how the networking components are interconnected and produce the bill of engineering measurement and evaluation for the job.
Find the work (in ft-lb) required to pump all the water out of a cylinder that...
Find the work (in ft-lb) required to pump all the water out of a cylinder that has a circular base of radius 6 ft and height 200 ft. Use the fact that the weight-density of water is 62.4 lb/ft3. Find the work (in ft-lb) required to pump all the water out of the cylinder if the cylinder is only half full.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT