A machine is out of order for minor work. Define controls
exercised in maintenance. Department required for its maintenance.

Solutions

Expert Solution

Whenever the machine has slight wear and tear and it is not performing upto the mark it needs to be sent for maintenance whether the work is small or big. It will lead to better efficiency provided by the machine to the user. We will discuss about the controls that are being followed in the maintenance work :

Planning : Planning needs to be done initially before sending the machine for the repairing work about how much time and cost it will take to complete the given work. Better planning ensures that you will have everything being done in proper time.

Scheduling : After the planning, the machine is being sent to the respective department for the completion of work and then the scheduling of maintenance is being done as per the situation or the time permitted.

Maintenance : After the machine is reached at the point, the main work will be started and then as per the requirement of the machine and the customer, the work is being done.

Check and Deliver : The last step in the process of the maintenance is about checking the work done and that if the machine is working properly or not and after that it is being delivered to the owner and here the maintenance exercise is being completed.

The department which is required for these kind of small work is known as Equipment Maintenance Department. It helps in the maintenance of all types of mechanical equipments.


Related Solutions

A machine is out of order for major work. Define controls exercised in Maintenance Department required...
A machine is out of order for major work. Define controls exercised in Maintenance Department required for its Maintenance.
managing a work order backlog is not the most exciting of maintenance task but without a...
managing a work order backlog is not the most exciting of maintenance task but without a complete and up-to date backlog. important work will be forgotten indeed, good backlog management is a perequisite for effective planning and scheduling. discuss an optimum size for non-shutdown work order backlog for a typical 24/7 continuous -process operation and includes if a backlog too small and if the backlog too large
If 181100 units are transferred out of a department, there was no beginning work in process,...
If 181100 units are transferred out of a department, there was no beginning work in process, and there are 29300 units still in process at the end of a period, the number of units that were started into production during the period is 151800. 29300. 181100. 210400.
15. If 179800 units are transferred out of a department, there was no beginning work in...
15. If 179800 units are transferred out of a department, there was no beginning work in process, and there are 30800 units still in process at the end of a period, the number of units that were started into production during the period is 30800. 210600. 179800. 1. The Assembly Department shows the following information: Units Beginning Work in Process 20800 Ending Work in Process 65300 Units Transferred Out 30200 How many total units are to be accounted for by...
In order to take out a loan, you are required to put up some type of...
In order to take out a loan, you are required to put up some type of collateral. You decide to offer 1,000 shares of your ZG Corp. stock which is valued at $100 per share. You are concerned that the stock price will increase to $125 before you repay the loan and the lender will sell your shares of stock for a profit. How could you manage this risk using a financial derivative? (Would you purchase a put or call...
You work at a toy company. You talk to the accounting department and figure out that...
You work at a toy company. You talk to the accounting department and figure out that the fixed operating cost is roughly $50,000 a month. As an engineer, you also calculate that it cost roughly $40 per unit of output. You then notice that due to supply and demand that the selling price per unit is about p = $200-1.6D. Determine the optimal volume for this product and what are the breakeven point(s)?
You are required to carry out the computer networking of five (5) work stations. With the...
You are required to carry out the computer networking of five (5) work stations. With the aid of a well labelled, neat diagram, show how the networking components are interconnected and produce the bill of engineering measurement and evaluation for the job.
Find the work (in ft-lb) required to pump all the water out of a cylinder that...
Find the work (in ft-lb) required to pump all the water out of a cylinder that has a circular base of radius 6 ft and height 200 ft. Use the fact that the weight-density of water is 62.4 lb/ft3. Find the work (in ft-lb) required to pump all the water out of the cylinder if the cylinder is only half full.
What kind of statements/questions are required in a survey in order to carry out Factor Analysis?
What kind of statements/questions are required in a survey in order to carry out Factor Analysis?
Define the standards and parameters that health care professionals must have in order to work within...
Define the standards and parameters that health care professionals must have in order to work within their scope of practice.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT