Cost of Quality Analysis The ABC Company has collected the following cost data for the year:  ...

Cost of Quality Analysis

The ABC Company has collected the following cost data for the year:  

          Receiving Inspection $ 15,232

Production Scrap $   32,150

Rejected Products $ 6,200

  Product Design $ 25,422

Customer Adjustment Credit $ 85,654

Online Inspection $ 17,248

Quality Team Meeting $ 7,540

Downgrading Products $ 1,125,328

Customer Need survey $ 3,250

Final test $         25,758

Prototyping $ 136,802  

  1. Organize these costs in COQ categories and put any non-QOC data in the NQ category.
  2. Compute the ratio of prevention and appraisal costs to failure costs
  3. Recommend strategies for reducing the Total Quality Cost.

Solutions

Expert Solution

Answer :

1. Cost of Quality Category :

a) Prevention Costs:

Product Design $ 25,422

Quality Team Meeting $ 7,540

Final test $         25,758

Prototyping $ 136,802

Customer Need survey $ 3,250

b) Aprraisal Costs :

Receiving Inspection $ 15,232

Online Inspection $ 17,248

c) Failure Costs :

Rejected Products $ 6,200

Production Scrap $   32,150

Customer Adjustment Credit $ 85,654

Downgrading Products $ 1,125,328

2. ( Prevention Costs + Appraisal Costs ) / Failure Costs = 231252/1249332 = 18.51%

3. Strategies to reduce total quality costs:

a) Invest in prevention costs i.e., product and process design ;

b) Try to reduce production scrap;

c) Create environment to form quality circle this will reduce formal quality meetings;

d) Apply philip crossby principles of zero defect;

e) Do it right first time, do it right every time;

f) Develop proper method of SQC.

Thanks....


Related Solutions

A quality control manager for Hewlett Packard has collected the following data on the quality status...
A quality control manager for Hewlett Packard has collected the following data on the quality status of hard drives by supplier. She inspected a total of 700 hard drives. For a hard drive selected at random, answer the questions that follow the table. Hard Drive Status             Supplier Working Defective TOTAL Company A 123 10 133 Company B 181 15 196 Company C 51 5 56 Company D 303 12 315 TOTAL 658 42 For a hard drive selected at...
the following cost-of-quality data were collected at the installment loan department of the Kenney Bank. Classify...
the following cost-of-quality data were collected at the installment loan department of the Kenney Bank. Classify these data into the appropriate cost-of-quality categories. 1. Run credit checks:$2,036.03 2.Review documents:$3,290.66 3.Make document corrections; gather additional information:$1,696.47 4.Prepare tickler file; review and follow up on titles, insurance, second meetings:$105.22 5.Review all output:$2,914.92 6.Correct rejects and incorrect output:$433.63 7.Reconcile incomplete collateral report:$78.89 8.Handle dealer problem calls; address associate problems; research and communicate information:$2,290.55 9.Compensate for system downtime: $557.17 10.Conduct training:$1,168.91 Loan Payment 1.Receive,...
Konza Company has collected the following cost and production data from their manufacturing operations over the...
Konza Company has collected the following cost and production data from their manufacturing operations over the past eight months. Period Units Produced Total costs (Sh) 1 2,200 10,500 2 3,100 12,750 3 5,600 18,500 4 1,700 9,250 5 6,300 20,750 6 8,100 25,250 7 5,050 17,625 8 3,000 12,500 (a) Using the high-low method ; i. Estimate the fixed production costs, ii. Estimate the variable production cost per unit, (b) Establish a cost estimating function for the total production costs....
A cost estimator for a construction company has collected the data found in the source file...
A cost estimator for a construction company has collected the data found in the source file Estimation.xlsx describing the total cost (Y) of 97 difference projects and the following 3 independent variables thought to exert relevant influence on the total cost: total units of work required (X1), contracted units of work per day (X2), and city/location of work (X3). The cost estimator would like to develop a regression model to predict the total cost of a project as a function...
In a quality control test of a highway project, the following data was collected as shown...
In a quality control test of a highway project, the following data was collected as shown below. Bulk specific gravity of the compacted mix is 2.30, Bulk Specific gravity of aggregate=2.75, The percentage of bitumen absorption is 0.45%, The percentage of binder by mass=5.5%,Bitumen Specific Gravity=1.05, answer the following questions: What is the percentage of Air voids in the compacted mix? Aggregate effective specific gravity?
ABC Company is creating the production plan for the coming month. The company has collected the...
ABC Company is creating the production plan for the coming month. The company has collected the following data on the average marketing demand during the past 25 months. Month Demand 1 60 2 65 3 67 4 58 5 59 6 56 7 65 8 65 9 69 10 65 11 70 12 71 13 64 14 75 15 70 16 72 17 65 18 77 19 62 20 59 21 78 22 58 23 60 24 68 25 59...
Variance Analysis Peter Enterprises has collected the following data on one of its products. During the...
Variance Analysis Peter Enterprises has collected the following data on one of its products. During the period the company produced生产了(件) 25,000 units. The direct materials quantity variance 直接原材料数量差异is: Direct materials standard (7 kg. @ $2.05/kg) $14.35 per finished unit Actual cost of materials purchased $332,150 Actual direct materials purchased and used 151,000 kg Multiple Choice $22,600 favorable. $26,600 unfavorable. $49,200 favorable. $49,200 unfavorable. $22,600 unfavorable.
A firm is considering purchasing a computer system. The following data has been collected. - Cost...
A firm is considering purchasing a computer system. The following data has been collected. - Cost of the system: $172,000 - Project life: 6 years - Salvage value at the end of year 6: $16,000 - Depreciation method: five-year MACRS - Tax rate: 39% - Annual revenue from project: $142,000 - Annual expenses (not including depreciation): $92,000 The firm will borrow the entire $172,000 at 5.8% interest to be repaid in 2 annual payments. The firm's MARR is 12%. Determine...
"A firm is considering purchasing a computer system. The following data has been collected. - Cost...
"A firm is considering purchasing a computer system. The following data has been collected. - Cost of the system: $155,000 - Project life: 6 years - Salvage value at the end of year 6: $22,000 - Depreciation method: five-year MACRS - Tax rate: 40% - Annual revenue from project: $130,000 - Annual expenses (not including depreciation): $93,000 The firm will borrow the entire $155,000 at 9% interest to be repaid in 2 annual payments. The firm's MARR is 19%. Determine...
"A firm is considering purchasing a computer system. The following data has been collected. - Cost...
"A firm is considering purchasing a computer system. The following data has been collected. - Cost of the system: $165,000 - Project life: 6 years - Salvage value at the end of year 6: $19,000 - Depreciation method: five-year MACRS - Tax rate: 32% - Annual revenue from project: $120,000 - Annual expenses (not including depreciation): $78,000 The firm will borrow the entire $165,000 at 5.5% interest to be repaid in 2 annual payments. The firm's MARR is 19%. Determine...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT