In a quality control test of a highway project, the following data was collected as shown...

In a quality control test of a highway project, the following data was collected as shown below. Bulk specific gravity of the compacted mix is 2.30, Bulk Specific gravity of aggregate=2.75, The percentage of bitumen absorption is 0.45%, The percentage of binder by mass=5.5%,Bitumen Specific Gravity=1.05, answer the following questions: What is the percentage of Air voids in the compacted mix?

Aggregate effective specific gravity?

Solutions

Expert Solution


Related Solutions

A quality control manager for Hewlett Packard has collected the following data on the quality status...
A quality control manager for Hewlett Packard has collected the following data on the quality status of hard drives by supplier. She inspected a total of 700 hard drives. For a hard drive selected at random, answer the questions that follow the table. Hard Drive Status             Supplier Working Defective TOTAL Company A 123 10 133 Company B 181 15 196 Company C 51 5 56 Company D 303 12 315 TOTAL 658 42 For a hard drive selected at...
evelop a plan for performing quality assurance and quality control on this project. Identify the project...
evelop a plan for performing quality assurance and quality control on this project. Identify the project deliverables. Determine the quality criteria for each project deliverable. Identify the quality control tasks needed to control quality. Determine quality assurance activities required to assure quality. Prepare an action plan: Assign the person responsible for each quality control and assurance activity, and time frame to complete the activity.
Two quality control technicians measured the surface finish of a metal part, obtaining the data shown....
Two quality control technicians measured the surface finish of a metal part, obtaining the data shown. Assume that the measurements are normally distributed. Use Minitab© for all tests and calculations. Tech 1 1.45 1.37 1.21 1.54 1.48 1.29 1.34 * Tech 2 1.54 1.41 1.56 1.37 1.20 1.31 1.27 1.35 a) Does the normality assumption seem reasonable for the data? Are the variances equal? How do you know? b) The supervisor asks you to test the hypothesis that the difference...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.9 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 1.0 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.60 1.3 14 95.22 0.5 15 95.04 0.8 16...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.9 4 95.46 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.56 1.3 14 95.22 0.6 15 95.04 0.8 16...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.60 1.3 14 95.22 0.4 15 95.04 0.8 16...
The following are quality control data for a manufacturing process at Bensdork Chemical Company. The data...
The following are quality control data for a manufacturing process at Bensdork Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.8 4 95.46 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.8 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.60 1.3 14 95.22 0.4 15 95.04 0.8 16...
The following are quality control data for a manufacturing process at Kensprt Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensprt Chemical Company. The data show the temperature in degrees centigrade at five points in time during the manufacturing cycle. The company is interested in using quality control charts in monitoring the temperature of its manufacturing cycle. Construct an X bar and R chart and indicate what its tells you about the process. Sample      X bar      R      1            95.72    1.0      2            95.24      .9      3            95.38      .8...
You are asked to analyze the below speed data collected on a highway on different days...
You are asked to analyze the below speed data collected on a highway on different days of the week for similarity. Use ANOVA (analysis of variance) to support your conclusion by performing the following tasks: Sample 1 (mph) Sample 2 (mph) Sample 3 (mph) 50 45 55 55 50 60 50 55 50 50 60 45 60 40 40 State your null hypothesis (H0) and alternative hypothesis (H1) State your assumed level of significance (αα) Calculate mean for sample 1...
You are asked to analyze the below speed data collected on a highway on different days...
You are asked to analyze the below speed data collected on a highway on different days of the week for similarity. Use ANOVA (analysis of variance) to support your conclusion by performing the following tasks: Sample 1 (mph) Sample 2 (mph) Sample 3 (mph) 50 45 55 55 50 60 50 55 50 50 60 45 60 40 40 State your null hypothesis (H0) and alternative hypothesis (H1) State your assumed level of significance (αα) Calculate mean for sample 1...
ADVERTISEMENT