In: Civil Engineering
Numerous number of tool are available to govern project risk. but due to unfamiliar with all tool or due to complexity of tool, project manager are not in practice to utilize in any risk assessment project. enhanced risk matrix is such brief project management tool that required less effort but yield great output.
Risk assessment matrix is proposed by Gido and Clement in 2012 to access the project risk. this tool not only determine the probability of occurrence of risk but also determine the degree of impact of risk. But due to unable to quantify the risk nor prescribe the control measure, this tool require modification. therefore the modify form of Gido and Clement risk management tool is enhanced matrix.
the enhance matrix consist of number of column like Risk, consequence, chance of occurrence, impact etc.
Risk column
pick out the risk
consequence
column recognize the nature of after impact of risk
Impact
columns list all dismissive impact of risk.
Enhance risk assessment matrix (ERAM) and Fishbone diagram are sufficient tool for assessment of any risk. ERAM not only quantify and prioritize the risk but also provide cost reduction control measure during and before the action.