Question

In: Operations Management

1a) Explain the procedure for dealing with a compensation event under the NEC4 ECC, Option B....

1a) Explain the procedure for dealing with a compensation event under the NEC4 ECC, Option B.

1b) A Contractor is engaged under a contract incorporating NEC4 ECC Option B. All of the design of the works has been provided by the Client’s consultants. The works require 3000 cubic metres of concrete. The Contractor has noticed the following problem: whilst it is stated in the drawings in the Scope that the concrete must be Grade C30, it is stated in the specification section of the Scope that the concrete is to be Grade C40. The unit cost of Grade C30 is £70 per cubic metre whilst that of Grade C40 is £80 per cubic metre.Assuming that the drawings are wrong, advise the Contractor and the Project Manager on the actions to be taken.

Solutions

Expert Solution

Under the NEC4 forms, compensation events are events which are not the fault of the contractor or sub-contractor. The contractor has to notify a compensation event within eight weeks. Under NEC Contract if any fault or failure happened, it is highly recommended to resolve by a mutual trust and co-operation. The contractor’s right is to complete the event effectively as planned and shown on the accepted programme.

Compensation Event procedure:

- If a compensation event which arises from the Project Manager or the Supervisor giving a notification or an instruction to the contractor by issuing a certificate or altering earlier decision, the Project Manager communicate the contractor of the compensation event at that time of interaction.

- The project manager gives an instruction to the contractor to submit a quotation, unless the compensation event arises by the fault of the contractor or the event has no effect upon defined cost or meeting a key date. If the contractor not notified the compensation event within eight weeks, it is resolved that there is no change in the completion and prices are not changed.

- The project manager has to reply to the notification by the contractor within one week or a longer period which is agreed by the contractor.

- If the project manager fails to reply to the notification by the contractor within the time period, the contractor is treating this as acceptance by the Project Manager.

- If the project manager decides that the contractor not given early warning of the event (an experienced contractor will give such warning) the project manager can states this in the instruction to the contractor

- Assessment of the compensation event based on the assumption that if any of them is found later may have been wrong. The project manager can notify the correction.

- The contractor is submitting the quotations within three weeks.

- The project manager has to reply within two weeks after the receipt of the quotation.

- If any changes suggested the project manager instruct contractor to submit a revised quotation within three weeks.

- After these quotations, the project manager makes assessments.

- The compensation event is implemented as and when the project manager notifies the acceptance of the quotation by the contractor and based on the assessments made by the project manager.

- The compensation event is implemented the prices, the date of completion and other key dates are changed therefore.


Related Solutions

current event dealing with HRM I am looking for an event 5 years to the present...
current event dealing with HRM I am looking for an event 5 years to the present to write about, how I can use HRM to fixed the problem.
****URGENT****** 1A)  An event has four possible outcomes, A, B, C, and D. All of the outcomes...
****URGENT****** 1A)  An event has four possible outcomes, A, B, C, and D. All of the outcomes are disjoint. Given that P(Bc) = 0.2, P(A) = 0.1, and P(C) = 0.3, what is P(D)? 1B) A study was conducted on a potential association between drinking coffee and being diagnosed with clinical depression. All 18,832 subjects were female. The women were free of depression at the start of the study in 1996. Information was collected on coffee consumption and the incidence of...
Considering that stock compensation plans show how the key aspect of stock option compensation is for...
Considering that stock compensation plans show how the key aspect of stock option compensation is for a company to institute a long-term compensation plan in addition to the traditional short-term cash compensation plan. What are some of the typical performance measures that a company would use to determine the level of stock options to award their employees?
Please explain how to do 1a and b throughly, thank you! 1A) A psychologist specializing in...
Please explain how to do 1a and b throughly, thank you! 1A) A psychologist specializing in marriage counseling claims that, among all married couples, the proportion p for whom her communication program can prevent divorce is at least 76%. In a random sample of 225 married couples who completed her program, 164 of them stayed together. Based on this sample, can we reject the psychologist's claim at the 0.01 level of significance?Perform a one-tailed test. Then fill in the table...
This week's discussion will consist of case studies dealing with worker's compensation. Based on this week's...
This week's discussion will consist of case studies dealing with worker's compensation. Based on this week's learning objectives, provide a short paragraph for each of the following questions: a. Injured worker Melissa McCain was in an accident in a work vehicle, which resulted in amputation of both legs as a result of injuries sustained. What type of income benefits does she qualify for? b. Injured worker Howard White was burned on the hand and has been off for 7 days....
this is a FEM question. 1a. Describe the procedure for calculating the maximum stress for a...
this is a FEM question. 1a. Describe the procedure for calculating the maximum stress for a quick heating of a machine. 1b. Suppose we have a vibrating machine component and that we know the size and frequency of the interference. Explain how we can calculate the maximum stress in the vibrating machine component.
#PrinOfManagement Find 1 current event article dealing with "Planning". The article should be Xeroxed and a...
#PrinOfManagement Find 1 current event article dealing with "Planning". The article should be Xeroxed and a 2 to 2 1/2 page typed summary attached in front of the article. The typed research consists of two main parts: the actual summary of the main id articles are to be Xeroxed and a 2 to 2 1/2 page typed summary attached in front of the article. The typed research consists of two main parts: the actual summary of the main id articles...
1. The probability of event A is 60%, the probability of event B is 40%, and...
1. The probability of event A is 60%, the probability of event B is 40%, and the probability of either A or B is 65%. What is the probability of events A and B simutaneously? 2. 50% of items are Type A, 30% are Type B, and 20% are Type C. each type is broken up into V1 and V2. Type A is 80% V1, Type B is 60% V1, and Type C is 30% V1. If a randomly selected...
(a) If the knowledge that an event A has occurred implies that a second event B...
(a) If the knowledge that an event A has occurred implies that a second event B cannot occur, then the events A and B are said to be A. collectively exhaustive. B. the sample space. C. mutually exclusive. D. independent. (b) If event A and event B are as above and event A has probability 0.2 and event B has probability 0.2, then the probability that A or B occurs is ____ In a carnival game, a player spins a...
3a. Explain to the Contractor the content requirements of the programme under the NEC4 ECC Option...
3a. Explain to the Contractor the content requirements of the programme under the NEC4 ECC Option B and the consequences of not meeting them. 3b.By reference to Clauses in the contract mentioning the Contractor’s programme, outline its contractual significance.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT