define group risks in project management with an example
Most Common Project Risks
Other Types of Risks
There are many other types of risks of concern to projects. These risks can result in cost, schedule, or performance problems and create other types of adverse consequences for the organization. For example:
As indicated by these examples, project risks include both internal risks associated with successfully completing each stage of the project, plus risks that are beyond the control of the project team. These latter types include external risks that arise from outside the organization but affect the ultimate value to be derived from the project. In all cases, the seriousness of the risk depends on the nature and magnitude of the possible end consequences and their probabilities.
In addition to project risk, project deferral risk can be important. Project deferral risk refers to the risks associated with failing to do a project. Like project risk, project deferral risk can arise from any of the bulleted risk sources listed above (the second list). Project deferral risk can also occur if there is only a limited window of opportunity for conducting a project—if the project is not conducted now, there may be a risk that it might never be possible to effectively do it later.