(c) A wind turbine construction company bids for a fixed-price order from local government to install...

(c) A wind turbine construction company bids for a fixed-price order from local government to install 70 wind turbine towers in the far coastal area.  They project the works with their increasing capacity in the coming 6 years in the following table.

Period

Number of installations

1

10

2

11

3

12

4

13

5

14

6

10

Assume the investment costs them $3,008,000 in now.  Once installed, each turbine can earn $100,000.  They assume the average inflation rate will be 4% over these 6 years.  What would be the present worth of this project?  Is it worth to invest?

Solutions

Expert Solution

Solution

Given Initial investment= 3008000

Now it is given each turbine can earn 100000/year (Assuming that earning given is for each year)

           

Now Present worth=Present value of all cash inflows – Initial investment

Present value of a cash flow= Cash flow/ (1+r)^n

Where r= rate of interest (In this case rate of inflation) =4%

n= year for which cash flow being calculated

For example cash flow for year 1 = Number of turbines*100000=1000000

Therefore Present value year 1= 1000000/1.04^1= 961538.46

Similarly in year 2 now 11 more turbines have been installed therefore total working turbines in year 2 =10+11=21

Revenue for 21 turbines=2100000

Present value year 2= 2100000/1.04^2

= 1941568.05

Similary calculating values for other year we get below data

Year

Installation done

Total turbines installed till that year(a)

Revenue=100000*number of turbines installed till that year(a)

Present value of revenues@ 4%

1

10

10

1000000

961538.46

2

11

21

2100000

1941568.05

3

12

33

3300000

2933687.98

4

13

46

4600000

3932099.28

5

14

60

6000000

4931562.64

6

10

70

7000000

5532201.68

Total present values

20232658.09

Therefore sum of Present values for cash flow for all years= 20232658.09

Present worth of project = sum of Present values for cash flow for all years- Initial investment

=20232658.09-3008000

=17224658.09

Yes it is worth investing in the project as the present worth is good and project is giving good return on initial investment


Related Solutions

Describe with a neat diagram, construction and advantages of a double bladed wind turbine
Describe with a neat diagram, construction and advantages of a double bladed wind turbine
Green Batteries Pty Ltd is considering the purchase of a wind turbine generator in order to...
Green Batteries Pty Ltd is considering the purchase of a wind turbine generator in order to generate electricity and to reduce the electricity costs for their offices, which are located in Toowoomba. Currently the business uses 40,000 kilowatt hours (kWh) per quarter (3 months) at an average cost of $0.40 per kWh, supplied by the local coal fired power station. The current required rate of return used to evaluate projects is 6%, with a required payback period of 4 years....
Fluid Mechanics question: Describe the processes in a wind turbine from a) the perspective of a...
Fluid Mechanics question: Describe the processes in a wind turbine from a) the perspective of a system and b) from the perspective of a control system
The Adams Construction Company is bidding on a project to install alarge flood drainage culvert from...
The Adams Construction Company is bidding on a project to install alarge flood drainage culvert from Dandridge to a distantlake. The cost and benefits are shown below. Use the Present Worth conventional and modified Benefit-Cost ration method to make a recommendation.Draw Cash Flow Diagram Initial investment = $2 million Right of way maintenance cost = $30,000 per year Major upkeep every six years = $50,000 Annual benefits to the taxpayers = $135,000 per year Life of the project = 12...
Bohr Co is a construction company and has entered into a contract with a fixed price...
Bohr Co is a construction company and has entered into a contract with a fixed price of £600,000 during the year ended 30thNovember 20X8.  Bohr Co measures percentage completion using the work certified as a proportion of contract value. The following information relates to the contract: £ Costs incurred to date 360,000 Estimate of the costs to complete the contract 125,000 Value of work certified by independent architect 450,000 Amounts invoiced to client 250,000 Requirement Prepare the relevant Statement of profit...
Construction Contracts A company is constructing a bridge at a fixed price of $15 million over...
Construction Contracts A company is constructing a bridge at a fixed price of $15 million over three years. The customer remains in control of the bridge throughout the contract. The expected costs and billings are provided below. Year 1 2 3 Expected Cost 4,000,000 4,500,000 3,500,000 Billings 5,000,000 5,000,000 5,000,000 Required Assume the percentage of completion CAN be measured reliably. b. If the actual cost for Year 2 is $6,500,000 while costs for Year 1 and 3 remain unchanged: Prepare...
What maximum output would you expect from a wind turbine with a blade of radius 15...
What maximum output would you expect from a wind turbine with a blade of radius 15 ft in a 25 mph wind
Steam at 5MPa and 300°C enters a turbine in a steady flow manner, from the turbine...
Steam at 5MPa and 300°C enters a turbine in a steady flow manner, from the turbine the steam expands to 200kPa with a quality of 90%. Find the following: The work done by the steam to the turbine in kj/kg The amount of steam flow rate needed in kg/hr if the turbine produces 200kW of power The efficiency of the expansion process
An energy company wants to choose between two regions in a state to install​ energy-producing wind...
An energy company wants to choose between two regions in a state to install​ energy-producing wind turbines. A researcher claims that the wind speed in Region A is less than the wind speed in Region B. To test the​ regions, the average wind speed is calculated for 90 days in each region. The mean wind speed in Region A is 13.8 miles per hour. Assume the population standard deviation is 2.8 miles per hour. The mean wind speed in Region...
An energy company wants to choose between two regions in a state to install​ energy-producing wind...
An energy company wants to choose between two regions in a state to install​ energy-producing wind turbines. A researcher claims that the wind speed in Region A is less than the wind speed in Region B. To test the​ regions, the average wind speed is calculated for 60 days in each region. The mean wind speed in Region A is 13.7 miles per hour. Assume the population standard deviation is 2.7 miles per hour. The mean wind speed in Region...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT