Question

In: Civil Engineering

A new landfill site is to be designed with a projected life of 32 years for...

A new landfill site is to be designed with a projected life of 32 years for a population of 220000 generating 2.27 kg waste/capita/day. The density of the compacted waste is 537 kg/m3. The height of landfill cannot exceed 13 meters. Please use the knowledge of solid waste management (especially landfill design) to describe the area (width x length) required for that landfill, if:   
a. The landfill does not have slopes   
b. The landfill has slopes (3:1 ratio)

Solutions

Expert Solution

Solution is attached in the image Posted below.

Hope it helps.

If you have any query please comment in the comment box.


Related Solutions

A rigid pavement is to be designed to provide a service life of 20 years and...
A rigid pavement is to be designed to provide a service life of 20 years and has an initial PSI of 4.4 and a TSI of 2.5. The modulus of subgrade reaction is determined to be 300 lb/in3. For design, the daily car, pickup truck, and light van traffic is 30,000; and the daily truck traffic consists of 300 passes of single-unit trucks with single and tandem axles, and 400 passes of tractor semi-trailer trucks with single, tandem, and triple...
Escitalopram with half life 27 - 32 hours question 1 half life 27-32 hours Calculate how...
Escitalopram with half life 27 - 32 hours question 1 half life 27-32 hours Calculate how long it takes to eliminate 95% of a single dose of escitalopram from the body. Provide the range of values and the equation used. From the given pharmacokinetics parameter, explain which elimination model of escitalopram is likely to follow. questionB what is the mechanism of actions of escitalopram, and the affect escitalopram has on the structure of the target site Identify the molecular target...
A truncated-pyramid-shape landfill is required to serve a community for 10 years. The community has a...
A truncated-pyramid-shape landfill is required to serve a community for 10 years. The community has a solid waste disposal rate of 5.0 lb/capita/day and a by-weight recycling rate of 34%. The total solid waste generated by the community over the 10 years period that is expected to go to the landfill is 1x10^9 lbs. The waste density is 1500 lb/yard3. Assume that the population, disposal rate, and recycling rate will remain constant. Estimate the population of the community in capita....
"Life Is Fun Love Is Strange Inc" is a major producer of essential life products designed...
"Life Is Fun Love Is Strange Inc" is a major producer of essential life products designed to support the enjoyment of life and maintain the unexpected events associated with love. The Board of Directors decided to analyze 2 of their stores: "Fun Life" and "Strange Love" in "Heaven City". The CEO asked you to conduct the following 1) To visually assess Normality for each one of these samples, we create a bar diagram or a histogram for each and check...
Outline a program of hydrogeological investigations for this site designed to identify potential groundwater flow paths...
Outline a program of hydrogeological investigations for this site designed to identify potential groundwater flow paths and to assess the likely rate of flow of water into the proposed excavation. In your answer, you should also consider the potential for seasonal variability in groundwater level and explain how this could be evaluated. In your discussion, assume that the groundwater system is unconfined.
2. A sample of 32 students took a class designed to improve their SAT math scores....
2. A sample of 32 students took a class designed to improve their SAT math scores. Their scores before and after the class are recorded in the sheet ‘SAT Scores’ in the ‘Lab12 Chp 10n11 S20’ spreadsheet. (a) Are the samples independent or paired? (b) Consider constructing a 90% confidence interval for the average increase in scores after taking the class.                i. Find the point of estimate using proper notation. Show your work including all relevant quantities needed. Round...
A new project has an intial cost of $480,000 with an expected life of 8 years.
A new project has an intial cost of $480,000 with an expected life of 8 years.  The project is expected to have earnings before depreciation and taxes of $125,000 per year.  If the projected is being depreciated over a 3-year term and the firm’s tax rate is 40%, calculate the cashflows of the project over its estimated life.
Purchase price of a new machine is $84000 and the useful life of the machine is 6 years
Purchase price of a new machine is $84000 and the useful life of the machine is 6 years. At the end of 6 years salvage value of the machine is zero. Before tax earnings from the new machine is $18000 per year. The effective income tax rate is 40% and after tax MARR is 12% using the SL depreciation, show the before-tax and after-tax cash flows in a table and calculate after-tax IRR value for this investment. Is this a...
Purchase price of a new machine is $84000 and the useful life of the machine is 6 years.
Purchase price of a new machine is $84000 and the useful life of the machine is 6 years. At the end of 6 years, salvage value of the machine is zero. Before tax earnings from the new machine is $18000 per year. The effective income tax rate is 40% and after tax MARR is 12%. Using the SL depreciation, show the before-tax and after-tax cash flows in a table and calculate after-tax IRR value for this investment. Is this a...
A new project will cost $124 million and will have an expected life of 15 years....
A new project will cost $124 million and will have an expected life of 15 years. The project will be depreciated straight-line over a 9-year term. EBDT for the project is expected to be $16 million per year. The firm's tax rate is 25%. Show the expected cash flows per year for the project. Show work