In a quality control test for pavement construction, the engineer cut out a core of the...

In a quality control test for pavement construction, the engineer cut out a core of the asphalt mix. Laboratory tests were conducted on the core to determine the volumetric properties of the mix. The dry mass of the core is 1200 g, the saturated surface dry mass is 1202.5 g and the submerged mass is 691.9 g. The engineer separated the bitumen from aggregate and found that the dry mass of the aggregate was 1132.8g. The specific gravity of bitumen is 1.05 and the percentage of bitumen absorption is 0.5%. The aggregate bulk specific gravity is 2.76, determine the following:


a) bulk specific gravity of the compacted mix


b) Effective specific Gravity aggregates


c) max theoretical specific gravity of asphalt mix


d) percentage by mass of effective binder content


e) percentage of air voids in the total mix


f) pencetage of voids in the mineral aggregates



Solutions

Expert Solution

Mass of dry core A = 1200 g

Saturated surface dry mass B = 1202.5 g

Submerged mass C = 691.9 g

Dry mass of the aggregate D = 1132.8 g

Specific gravity of bitumen GB = 1.05

Percentage of bitumen absorption Pba = 0.5%

Aggregate bulk specific gravity Gsb = 2.76

Aggregate content Ps = D/A * 100 = 1132.8 / 1200 * 100 = 94.4%

Bitumen content Pb = 100 - Ps = 100 - 94.4 = 5.6%

a) Bulk specific gravity of the mix

Gmb = A / (B-C)

= 1200 / (1202.5-691.9)

= 2.35

c) Max theoretical specific gravity of asphalt mix

Gmm = A / (A-C) = 1200 / (1200 - 691.9)

= 2.36

b)  Effective specific Gravity aggregates

Gse = Ps / [(100/Gmm) - (Pb/Gb)]

= 94.4 / [(100/2.36) - (5.6/1.05)]

= 2.55

d) Percentage by mass of effective binder content

Pbe = Pb - (Pba / 100 * Ps )

= 5.6 - (0.5/100*94.4)

= 5.13

e) Percentage of air voids in the total mix

Va = 100 * [(Gmm - Gmb) / Gmm]

= 100 * [(2.36 - 2.35) / 2.36)]

= 0.42%

f) Percetage of voids in the mineral aggregates

Vma = 100 - (Gmb * Ps / Gsb)

= 100 - ( 2.35 * 94.4 / 2.76)

= 19.62%


Related Solutions

A quality-control engineer wants to find out whether or not a new machine that fills bottles...
A quality-control engineer wants to find out whether or not a new machine that fills bottles with liquid has less variability than the machine currently in use. The engineer calibrates each machine to fill bottles with 16 ounces of a liquid. After running each machine for 5 hours, she randomly selects 15 filled bottles from each machine and measures the volume of their contents (in ounces). The resulting data is provided in the table below. Is the variability in the...
A quality control expert at LIFE batteries wants to test their new batteries. The design engineer...
A quality control expert at LIFE batteries wants to test their new batteries. The design engineer claims they have a standard deviation of 86 minutes with a mean life of 505 minutes. If the claim is true, in a sample of 120 batteries, what is the probability that the mean battery life would differ from the population mean by greater than 16.6 minutes? Round your answer to four decimal places.
A quality control expert at LIFE batteries wants to test their new batteries. The design engineer...
A quality control expert at LIFE batteries wants to test their new batteries. The design engineer claims they have a variance of 8464 with a mean life of 886 minutes. If the claim is true, in a sample of 145 batteries, what is the probability that the mean battery life would be greater than 904.8 minutes? Round your answer to four decimal places.
In a quality control test of parts manufactured at Dabco Corporation, an engineer sampled parts produced...
In a quality control test of parts manufactured at Dabco Corporation, an engineer sampled parts produced on the first, second, and third shifts. The research study was designed to determine if the population proportion of good parts was the same for all three shifts. The test to be used is a chi-square test of homogeneity using a significance level α=0.05. Testing the equality of population proprotions for three or more populations Observed Production Shift Quality First Second Third Good 285...
As a quality control engineer, you’re examining the performance of two of the suppliers (A and...
As a quality control engineer, you’re examining the performance of two of the suppliers (A and B) of a key sub-assembly in a system that your factory produces. You purchased a total of 387 batches of parts from Supplier A and 283 batches from Supplier B. When batches arrive, you inspect them to determine if they meet quality standards: batches either “meet” or “fail to meet” standards. The past quality data that you’ve collected appears below. a. From Supplier A,...
How should Quality Assurance and Quality Control be executed on a stadium construction project?
How should Quality Assurance and Quality Control be executed on a stadium construction project?
Jack is a quality control engineer for a large electronic company. Her job is to thoroughly...
Jack is a quality control engineer for a large electronic company. Her job is to thoroughly test each stereo set manufactured by the company and to classify it as acceptable or unacceptable. Due to the company’s rigorous quality standards, each set has an equally likely chance of being acceptable or unacceptable. On a Monday morning, Felicia inspects six (6) sets. Find the probability that she (i). Rejects all the sets. (ii). Accepts all the sets. (iii). Accepts at least three...
A quality control engineer is interested in estimating the proportion of defective items coming off a...
A quality control engineer is interested in estimating the proportion of defective items coming off a production line. In a sample of 255 items, 45 are defective. Calculate a 95.0% confidence interval estimate for the proportion of defectives from this production line. (Use 3 decimal places in calculations and in reporting your answers.) Lower Limit: Upper Limit:
A quality control engineer at a potato chip company tests the bag filling machine by weighing...
A quality control engineer at a potato chip company tests the bag filling machine by weighing bags of potato chips. Not every bag contains exactly the same weight. But if more than 16% of bags are over-filled then they stop production to fix the machine. They define over-filled to be more than 1 ounce above the weight on the package. The engineer weighs 201 bags and finds that 66 of them are over-filled. He plans to test the hypotheses H0:...
A quality control engineer wishes to estimate the mean output voltage of a DC power supply...
A quality control engineer wishes to estimate the mean output voltage of a DC power supply for different loads. The engineer measures output voltage when the supply is connected to 11 different loads and computes a mean 98.4 V and standard deviation 7 V. Assume that the output voltages follow a normal distribution. (a) Construct and interpret the 99.9% confidence interval. (b) Construct and interpret the 90% prediction interval.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT