Would Portland Cement Concrete from the Demolition of a 50-year old concrete building structure and surrounding concrete parking lot, make for a good supply of recycled aggregate? What are the Pro’s and Con’s of using Recycled Aggregates?

Solutions

Expert Solution

Advantages Of Recycled Aggregate:

  • Reduces the amount of virgin aggregates to be created, hence less evacuation of natural resources.
  • While being crushed into smaller particles a large amount of carbon dioxide is absorbed. This reduces the amount of CO2 is the atmosphere.
  • Cost saving – few research studies have shown a significant reduction in construction costs if RAC is used.
  • Conserves landfill space, reduces the need for new landfills and hence saving more costs.
  • Creates more employment opportunities is recycling industry.

Disadvantages Of Recycled Aggregate:

  • Downgrading of quality of concrete.
  • Increase in water absorption capacity ranging from 3% to 9%
  • Decrease in compressive strength of concrete (10-30%)
  • Reduces workability of concrete.
  • Lack of specifications and guidelines.
  • Less durability of RAC, however improvement in the durability can be made by mixing it with special materials like fly ash.

Yes,it can used for further construction ,but before use it should be properly crushed and removal of unwanted material like reinforcement, asphalt or soil


Related Solutions

Compare and contrast Portland cement concrete and mortar.
Compare and contrast Portland cement concrete and mortar.
the curing of concrete is a chemical reaction involving the hydration of Portland cement. at any...
the curing of concrete is a chemical reaction involving the hydration of Portland cement. at any time, the rate of increase of the compressive strength S of the concrete is proportional to the difference between its final strength (in this case 5000psi) and the current value of S at any time. a. Write a differential equation for dS/dt , with k unknown at this point. ( the value of k will not be determined until part c) b. Solve the...
A Portland Cement Concrete (rigid) pavement is to be designed using AASHTO empirical design method. The...
A Portland Cement Concrete (rigid) pavement is to be designed using AASHTO empirical design method. The pavement should have an 8" granular sub-base having elastic modulus (Esb) of 50x103 psi. The resilient modulus of the subgrade is 5000 psi, and lying just 5 feet above rock strata (bed rock). (a) Determine the design k value, assuming loss of support factor (LSF) of 2. (b) Use the k value obtained from (a) to determine the thickness of the rigid pavement.   Assume...
QUESTION #1:  Demolition at the construction site accident A 42 year-old man is admitted to the emergency...
QUESTION #1:  Demolition at the construction site accident A 42 year-old man is admitted to the emergency room having been in an accident involving a construction site and dynamite. The patient was brought to the hospital and it was explained that a detonation they were working on went off too soon and the worker was thrown to the ground. The patient was seen drinking plenty of water throughout the day. The 42 year-old is conscious, blood pressure is slightly high, her...
The involves building a 80 feet highX80X100 foot in dimension reinforced concrete structure with 3 -...
The involves building a 80 feet highX80X100 foot in dimension reinforced concrete structure with 3 - foot thick walls in the river that extends to twenty feet below river bottom in soft clay. Water depth at the location is 30 feet. The structure starts at 200 feet from the river edge where land is about 5 feet above the river level.The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be...
A building contractor buys 80% of his cement from supplier A and 20​% from supplier B....
A building contractor buys 80% of his cement from supplier A and 20​% from supplier B. A total of 75​% of the bags from A arrive​ undamaged, while 85​% of the bags from B arrive undamaged. Find the probability that a damaged bag is from supplier Upper A.
A building contractor buys 70​% of his cement from supplier A and 30​% from supplier B....
A building contractor buys 70​% of his cement from supplier A and 30​% from supplier B. A total of 95​% of the bags from A arrive​ undamaged, and a total of 90​% of the bags from B arrive undamaged. Find the probability that a damaged bag is from supplier Upper A.
A cement block accidentally falls from rest from the ledge of a 51.7-m-high building. When the...
A cement block accidentally falls from rest from the ledge of a 51.7-m-high building. When the block is 18.7 m above the ground, a man, 2.00 m tall, looks up and notices that the block is directly above him. How much time, at most, does the man have to get out of the way? Number Units
I received a model of a reinforced concrete office building design in Revit from a coworker,...
I received a model of a reinforced concrete office building design in Revit from a coworker, and I’d like to get started on some of the sheets that will make up the document sets for the project. What are some elements I should consider including in my sheets?
MG, a 15-year-old patient, complains about blackheads and large, raised acne with surrounding erythema on her...
MG, a 15-year-old patient, complains about blackheads and large, raised acne with surrounding erythema on her face. She seeks help from a health care provider. 1. To assist in identifying her skin problem, what should the health history and assessment include? 2. Which nonpharmacologic measures might the nurse discuss with MG in caring for her skin condition?     MG’s skin disorder does not improve. Her health care provider says she has acne vulgaris and has prescribed benzoyl peroxide and oral tetracycline....
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT