Question

In: Civil Engineering

Design changes are identified to be one of the major causes of project delays and cost...

Design changes are identified to be one of the major causes of project delays and cost overruns. As a construction project manager, what would you do to avoid or minimize the impact of this problem?

Solutions

Expert Solution

if you have any doubts please ask me....... please upvote me.......... tq....... have a good day ?


Related Solutions

Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes,...
Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes, claims, and disputes (Max 200 words).             
Consider network latency (four delays) over an Ethernet Network. What causes the delay for a datagram...
Consider network latency (four delays) over an Ethernet Network. What causes the delay for a datagram sent between two hosts over an Ethernet network.
What is the major force/pressure that causes filtration? What is the major force/pressure that causes reabsorption?...
What is the major force/pressure that causes filtration? What is the major force/pressure that causes reabsorption? What would happen to the filtration rate if glomerular capillaries were damaged to an extent to be leaky to plasma proteins? Identifying how renal arterioles affect GFR Complete the following table that describes how changes in the diameters of these resistance vessels affect glomerular hydrostatic pressure and GFR (assuming no change in renal arterial pressure) with no change, increase, or decrease. Afferent Arteriole Efferent...
What causes changes in the business cycle, shifts in aggregate demand or aggregate supply? Is one...
What causes changes in the business cycle, shifts in aggregate demand or aggregate supply? Is one more important than the other?
The Advanced Tech Company has a project to design an integrated information database for a major...
The Advanced Tech Company has a project to design an integrated information database for a major bank. Data for the project are given in the Table. Indirect project costs amount to $300 per day. The company will incur a $150 per day penalty for each day the project lasts beyond day 14. What would be the least cost to achieve this desired result? Activity Normal Time (days) Normal Cost ($) Crash Time (days) Crash Cost ($) Immediate Predecessor(s) A 6...
Assuming activity-cost pools are used, what are the activity-cost driver rates for design changes, setups, and...
Assuming activity-cost pools are used, what are the activity-cost driver rates for design changes, setups, and inspections cost pools? a. $200 per change, $64 per setup, $5 per inspection b. $180 per change, $76 per setup, $4 per inspection c. $150 per change, $64 per setup, $4 per inspection d. $180 per change, $76 per setup, $5 per inspection e. $200 per change, $5 per setup, $64 per inspection Short Answer The following costs are attributed to the Quilt Company:...
List at least 3 major cardiovascular and respiratory changes that occur in the neonate, one for...
List at least 3 major cardiovascular and respiratory changes that occur in the neonate, one for each; causes of heat loss, measurement of heat loss, nursing interventions to prevent heat loss
You are the lead human–computer interaction (HCI) engineer on a major design project for an organization...
You are the lead human–computer interaction (HCI) engineer on a major design project for an organization of your choice. Employees or customers will use this new system and user interface (UI) design to perform data entry for the organization. The UI will need to provide the required input and output to characterize the type of data collected by the organization. Choose an organization, such as a business, nonprofit group, government, or another organization. Provide a description of your chosen organization,...
A national project on "Physiology Across the Curriculum" has identified gradient driven flow as one of...
A national project on "Physiology Across the Curriculum" has identified gradient driven flow as one of the critical principles that physiology students need to know, understand, and master. Gradient driven flow means that the transport of something through space occurs as a result of a change in some variable over location in space — concentration, pressure, temperature, voltage,…. In this class we've studied two gradient driven flow equations: Fick's law and the Hagen-Poiseuille equation. Pick one, describe what it tells...
During the construction phase of a health-care project, delays not attributed to the contractor were experienced,...
During the construction phase of a health-care project, delays not attributed to the contractor were experienced, but the contractor was delayed in submitting all delay information required by the contract until 7 days before the contractual completion date, can the architect issue an extension of time prior to the completion date? Explain.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT