Question

In: Civil Engineering

Stages of implementing buildings on site The documents needed to be received - Receive the project...

Stages of implementing buildings on site The documents needed to be received - Receive the project site - Receiving and receiving materials How to receive different items - Receiving Drilling Instructions - Receiving carpentry work - Receive the rebar - Casting work - before and after

Solutions

Expert Solution

There are various stages that are being involved while constructing any building on the site. So wee will elaborate each stage to go an know in detail about the construction of any building on the site. The initial stage is about collection of all the documents as sometimes tenders are being put for the project and from there the documentation work starts. After that all documents related to the amount of work done and payments. After collection of all the documents, surveying is being done at site and the work is being about to start. The site is properly prepared in such a way that it is clean and different works are done so that the site is fully available for starting the construction.

As all the pre construction work has been completed, not it will be the duty of contractor that the materials should be available on site and workers are also there so that the work is being started. All the work would simultaneously be also inspected by the site engineer who is in charge. After the materials have been arrived to the site, work would be divided among different groups and all of them would start the work. One group would be of the carpenters and initially the drilling and reinforcement work will be done at any portion. After the reinforcement, the carpenters would also be in work as the framework or shuttering is to be provided to the reinforced portion. After that the casting team has to do it's work and casting is done in various portions. Slowly and slowly the building is constructed by making the foundation first then different columns and they followed by the beam and slabs. In this way different floors will be constructed as one after another and work would be completed. Continuous inspection would be needed after completion of each slab by various engineers. By above context it is clear that all this work has to be divided into bits and pieces and each work is to be performed in a better way.


Related Solutions

1.Describe the four stages to Project Life Cycle. Discuss in your own words the key documents...
1.Describe the four stages to Project Life Cycle. Discuss in your own words the key documents likely to be utilized by the PM for each stage. Provide a template as an example for each one.
Sandhill Corp. purchased land with two old buildings on it as a factory site for $454,000....
Sandhill Corp. purchased land with two old buildings on it as a factory site for $454,000. The property tax assessment (that is, assessed value) on this property was $357,000: $255,000 for the land and the rest for the buildings. It took six months to tear down the old buildings and construct the factory. The company paid $62,200 to raze the old buildings and it sold salvaged copper, lumber, and brick for $6,500. Legal fees of $1,860 were paid for title...
Ivanhoe Corp. purchased land with two old buildings on it as a factory site for $454,000....
Ivanhoe Corp. purchased land with two old buildings on it as a factory site for $454,000. The property tax assessment (that is, assessed value) on this property was $356,000: $249,000 for the land and the rest for the buildings. It took six months to tear down the old buildings and construct the factory. The company paid $60,100 to raze the old buildings and sold salvaged copper, lumber, and brick for $6,700. Legal fees of $1,860 were paid for title search...
. Identify any five (5) typical documents that are needed to be checked while conducting a...
. Identify any five (5) typical documents that are needed to be checked while conducting a recruitment and selection audit and explain how these documents can aid the audit process?
You will receive a copy of the South Carolinian secession documents. Read them carefully. Write a...
You will receive a copy of the South Carolinian secession documents. Read them carefully. Write a comprehensive reasoning of the Southern arguments for secession and their causes. Your answer must include: 1. At least two direct, well-explained reasons from the document (no quotes) 2. At least three outside events, at least two of which are not mentioned specifically in the document. 3. Bonus if you use evidence from the Lincoln-Douglas Debates. You will be graded based on the completion of...
The active site is ? (Pick only one) the molecule to be changed the energy needed...
The active site is ? (Pick only one) the molecule to be changed the energy needed to make a reaction go the agent that changes the rate of a reaction the part of enzyme that binds the substrate the capacity to do work
A project manager is preparing two documents for risk management. One contains sources of overall project...
A project manager is preparing two documents for risk management. One contains sources of overall project risk and also summary information on individual risks. The second describes individual risks identified. What name should the project manager give to the first document?
Question 5 On a construction site a lot of labor/skill is needed as one start the...
Question 5 On a construction site a lot of labor/skill is needed as one start the project but as you scale down on the works, there is a tendency to reduce on the workforce, a. Discuss how you factor the downsizing of the workforce when preparing the bill of quantities? . b. Discuss the importance of quantity surveying to Civil Engineering? c. With clear labeled diagram, how do you carry out quantity take off for road, dam and water project...
Discuss the relationship of monitoring work and site remediation which are needed for groundwater flow as...
Discuss the relationship of monitoring work and site remediation which are needed for groundwater flow as a transport of contaminants. For vadose zone soil water budget, present a conclusion of the THREE (3) distinct processes in groundwater recharge.
Discuss the relationship of monitoring work and site remediation which are needed for groundwater flow as...
Discuss the relationship of monitoring work and site remediation which are needed for groundwater flow as a transport of contaminants. For vadose zone soil water budget, present a conclusion of the THREE (3) distinct processes in groundwater recharge.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT