1(a). Discuss why it is possible to have the central core, the main columns and the floor slab construction to be constructed separately in the “RC-Steel Composite” structural system, and whether it is necessary for the construction processes to be planned in the way like this. (b) With reference to a), discuss with the aid of sketch(es) the appropriate way(s) to illustrate the planning of construction works for typical floors of common “RC- Steel Composite” structural system.
The answers are given in below picture: